• 立式四喷嘴冲击式水轮机 > 水利机械技术总目录
  • 水利机械技术总目录

    免费下载 下载该文档 文档格式:XLS   更新时间:2010-12-01   下载次数:4   点击次数:43
    文档基本属性
    文档语言:Simplified Chinese
    文档格式:xls
    文档作者:
    关键词:
    主题:
    备注:
    点击这里显示更多文档属性
    "Sheet1"
    "水利机械技术总目录"
    "序号","论文名称",,,,,,,"作者姓名",," 年份","期号","总期号"
    1,"全国大型机组选型及科研工作会议概况",,,,,,,,,1979,"第九期"
    2,"奥地利,瑞士低水头灯泡机组考察报告",,,,,,,,,1979,"第九期"
    3,"水轮机的气蚀破坏及装机高程",,,,,,,,,1979,"第九期"
    4,"三门峡电站水轮机的气蚀和磨损",,,,,,,,,1979,"第九期"
    5,"对新丰江电站3#机转轮叶片采取堆焊和铺焊不锈钢抗气蚀层的看法",,,,,,,,,1979,"第九期"
    6,"柘溪水电站水轮机气蚀及裂纹处理经验",,,,,,,,,1979,"第九期"
    7,"若干5 8 7 型水轮机的气蚀概况",,,,,,,,,1979,"第九期"
    8,"澄碧河电厂3#机HL220(HL702)转轮气蚀调查",,,,,,,,,1979,"第九期"
    9,"葛洲坝电站水轮机安装高程的图解计算",,,,,,,,,1979,"第九期"
    10,"沙田水电厂水轮机气蚀情况及初步分析",,,,,,,,,1979,"第九期"
    11,"水轮机蜗壳外形尺寸图解法(上)",,,,,,,,,1979,"第九期"
    12,"速率上升有关问题",,,,,,,,,1979,"第九期"
    13,"关于速率升高的探讨",,,,,,,,,1979,"第九期"
    14,"广东省八甲二级电站调节试验报告",,,,,,,,,1979,"第九期"
    15,"略谈我国水电站技术供水方案水头分界问题",,,,,,,,,1979,"第九期"
    16,"刘家峡水电厂2#机压水调相试验总结",,,,,,,,,1979,"第九期"
    17,"龚咀电厂2#机调相压水试验小结",,,,,,,,,1979,"第九期"
    18,"全国水电站自动化技术经验交流会概况",,,,,,,,,1979,"第九期"
    19,"大型冲击式水轮机的效率试验以及出力不足主要原因的分析",,,,,,,,,1979,"第九期"
    20,"南水水电厂2#机效率试验",,,,,,,,,1979,"第九期"
    21,"水轮机过流测定的几种常用方法",,,,,,,,,1979,"第九期"
    22,"直径2.75米的3~5米低水头轴流式水轮发电机组投入运行",,,,,,,,,1979,"第九期"
    23,"凤滩水电站2×300吨双小车弧形轨电动桥式起重机安装运行技术总结",,,,,,,,,1979,"第九期"
    24,"柘溪水电站发电机冷推轴瓦的改进及运行情况",,,,,,,,,1979,"第九期"
    25,"沙田电厂水轮发电机组主要缺陷的处理",,,,,,,,,1979,"第九期"
    26,"关于欧阳海电站的最大运行水头问题",,,,,,,,,1979,"第九期"
    27,"欧阳海电站发电机无功功率不足问题的改进",,,,,,,,,1979,"第九期"
    28,"关于黄龙滩电站水力机械若干问题",,,,,,,,,1979,"第九期"
    29,"国内外排灌事业及大型水泵发展概况",,,,,,,,,1979,"第九期"
    30,"钟型进水流道的设计",,,,,,,,,1979,"第九期"
    31,"大型轴流泵的起动和停机的过渡状态",,,,,,,,,1979,"第九期"
    32,"排灌站水泵安装高程的选定",,,,,,,,,1979,"第九期"
    33,"七七年全国水轮机抗泥沙磨损经验交流会概况",,,,,,,,,1979,"第九期"
    34,"旋转圆盘泥沙磨损试验装置调试",,,,,,,,,1979,"第九期"
    35,"对若干装有混流211型机组电站调查小结",,,,,,,,,1979,"第九期"
    36,"大吨位桥式起重机系列方案简介",,,,,,,,,1979,"第九期"
    37,"水电开发及大型水电站",,,,,,,,,1980,"第三期"
    38,"美国大古力电厂",,,,,,,,,1980,"第三期"
    39,"日本大型机组",,,,,,,,,1980,"第三期"
    40,"卡布兰水轮机的外形尺寸比",,,,,,,,,1980,"第三期"
    41,"根据ns选择设计转浆式水轮机",,,,,,,,,1980,"第三期"
    42,"蜗壳外形尺寸图解计算(下)",,,,,,,,,1980,"第三期"
    43,"水轮机特性对其调节的影响",,,,,,,,,1980,"第三期"
    44,"水轮机调速器系统的非线性模拟",,,,,,,,,1980,"第三期"
    45,"水轮机调速器的电气设备",,,,,,,,,1980,"第三期"
    46,"罗讷河水电站的自动化",,,,,,,,,1980,"第三期"
    47,"作为水轮机导叶自动保护的自动回复液压操作连杆",,,,,,,,,1980,"第三期"
    48,"减小塔倍拉水电站水轮机的功率摆动",,,,,,,,,1980,"第三期"
    49,"多喷咀冲击式水轮机压低水位运行",,,,,,,,,1980,"第三期"
    50,"压力管道的电动力模拟",,,,,,,,,1980,"第三期"
    51,"通流式蝴蝶阀的发展",,,,,,,,,1980,"第三期"
    52,"进口阀特性的模拟试验研究",,,,,,,,,1980,"第三期"
    53,"水电站厂房桥的容量的估算",,,,,,,,,1980,"第三期"
    54,"世界上最大的卷板机",,,,,,,,,1980,"第三期"
    55,"水泵站虹吸出水流道的设计",,,,,,,,,1980,"第三期"
    56,"偏远水电站的功率因数",,,,,,,,,1980,"第三期"
    57,"大型电站的压力钢管",,,,,,,,,1980,"第四期"
    58,"加拿大,法国,瑞士,西德,瑞典,挪威和英国的大型水轮发电机组",,,,,,,,,1980,"第四期"
    59,"苏联制造的大型水轮发电机组",,,,,,,,,1980,"第四期"
    60,"大型电站选择水轮发电机组值得注意的几个问题",,,,,,,,,1981,"第四期"
    61,"关于按比转速选择混流式水轮机问题",,,,,,,,,1981,"第四期"
    62,"援索马里费诺力水电站2400千瓦低水头立轴转浆式水轮机与国外厂家订货技术谈判概况",,,,,,,,,1981,"第四期"
    63,"关于国际电工委员会1978年609号文件"水轮机,蓄能泵,水轮机气蚀评定"的国际规程编制经过与对我国编制该项规程的一些商榷意见",,,,,,,,,1981,"第四期"
    64,"云南省几个水电站水轮机的气蚀和泥沙磨损",,,,,,,,,1981,"第四期"
    65,"渔子溪电站水轮机气蚀和泥沙磨损存在的问题",,,,,,,,,1981,"第四期"
    66,"三门峡水电站水轮机转轮的气蚀破坏",,,,,,,,,1981,"第四期"
    67,"装置气蚀系数与改进水轮机气蚀性能实验研究方法的建议",,,,,,,,,1981,"第四期"
    68,"从机理上探讨磨损与气蚀",,,,,,,,,1981,"第四期"
    69,"调节参数计算超限时的对策",,,,,,,,,1981,"第四期"
    70,"调压阀在长压力引水管道水电站的应用",,,,,,,,,1981,"第四期"
    71,"水阻抗装置代替调压井简介",,,,,,,,,1981,"第四期"
    72,"水轮机组用脉动式安全阀——爆破膜装置作调节保证措施的研究",,,,,,,,,1981,"第四期"
    73,"用安全阀——爆破膜装置代替调压塔的现场试验研究",,,,,,,,,1981,"第四期"
    74,"空压机自动卸荷阀的改进",,,,,,,,,1981,"第四期"
    75,"北方小水电站冬季调相运行时机组给排水设计问题的探讨",,,,,,,,,1981,"第四期"
    76,"HL310-LH-230水轮机效率试验总结报告",,,,,,,,,1981,"第四期"
    77,"101-425/79-32水轮发电机效率试验",,,,,,,,,1981,"第四期"
    78,"上犹江水电厂水力机械的设计与运行",,,,,,,,,1981,"第四期"
    79,"D06A水轮机转轮中间试验在沙田水电厂进行的概况",,,,,,,,,1981,"第四期"
    80,"柘林水电厂四号机调相试验小结",,,,,,,,,1981,"第四期"
    81,"三门峡机组顶盖密封的改进",,,,,,,,,1981,"第四期"
    82,"水导回转油盘甩油处理",,,,,,,,,1981,"第四期"
    83,"葛洲坝水电站zz500新型转浆式水轮机",,,,,,,"单鹰 张允达",,1982,"第一期"
    84,"轴流式水轮机的调相压水方式",,,,,,,"刘尚智",,1982,"第一期"
    85,"抽水蓄能电站水泵水轮机的压水",,,,,,,"刘宝弟 于新生 刘建",,1982,"第一期"
    86,"关于卧轴机组水电站厂房布置合理性的探讨",,,,,,,"邹永楼",,1982,"第一期"
    87,"考虑蜗壳和尾水管影响水锤值的新算法",,,,,,,"董其国",,1982,"第一期"
    88,"石门河床电站机组试运行中的几个问题",,,,,,,"曹洪恩",,1982,"第一期"
    89,"对轴流式水轮机"抬机"问题的一些认识",,,,,,,"龚贵屏",,1982,"第一期"
    90,"河北省几座以灌溉为主的睡袋那种装机及机型选择的经验教训",,,,,,,"李佩华",,1982,"第一期"
    91,"VT型(即XT型)调速器运行中的故障处理",,,,,,,"周太径 董其国",,1982,"第一期"
    92,"小椅山水电站TFW-400调压阀调试若干技术问题",,,,,,,"李万方",,1982,"第一期"
    93,"TFW-400调压阀设计安装调试中值得注意的问题",,,,,,,"邹宪恩 吕维春",,1982,"第一期"
    94,"新丰江水电厂1#水轮机转轮叶片埋设直接补气管小结",,,,,,,"郭芸",,1982,"第一期"
    95,"水轮机大轴与更新转轮现场组合镗(铣)孔装置",,,,,,,"尹兆罴",,1982,"第一期"
    96,"小塘河水电站水轮机推力轴承油路的改进",,,,,,,"喻意铭",,1982,"第一期"
    97,"河南省拔河水电站水阻器试验成果报告",,,,,,,"湖南省水电勘测设计院",,1982,"第一期"
    98,"轴流式水轮机顶盖排水的简易方式",,,,,,,"周德威",,1982,"第一期"
    99,"河床式水电站水轮机效率试验评述",,,,,,,"刘国柱 万永华 田继在",,1982,"第一期"
    100,"大型泵站钟型进水流道试验报告",,,,,,,"江苏农学院机电排灌系",,1982,"第一期"
    101,"水轮发电机组轴线调整的新工艺",,,,,,,"电力部五局富春江水工机械厂",,1982,"第一期"
    102,"法兰西斯水泵-水轮机作水轮机运行时的迟滞特性",,,,,,,"龚贵屏译",,1982,"第一期"
    103,"根据等功率线确定转浆式水轮机最优协联关系",,,,,,,"林焕森译",,1982,"第一期"
    104,"国外可逆式抽水蓄能机组发展情况",,,,,,,,,1982,"第一~二期"
    105,"巴西抽水蓄能电站的发展(第三部分)",,,,,,,,,1982,"第一~二期"
    106,"国外可逆式水泵水轮机数据统计",,,,,,,,,1982,"第一~二期"
    107,"预测控制的稳定性",,,,,,,,,1982,"第一~二期"
    108,"卡普兰水轮机的事故和反水锤",,,,,,,,,1982,"第一~二期"
    109,"转浆式水轮机飞逸措施",,,,,,,,,1982,"第一~二期"
    110,"实际水电站水轮机流量测管的研究",,,,,,,,,1982,"第一~二期"
    111,"泽雅斜流式水轮机的研究及其运行经验",,,,,,,,,1982,"第一~二期"
    112,"反击式水轮机的选择",,,,,,,,,1982,"第二期"
    113,"灯泡机组拾掇",,,,,,,,,1982,"第二期"
    114,"恶滩水电站简介",,,,,,,,,1982,"第二期"
    115,"混流可逆式水泵水轮机的全特性",,,,,,,,,1982,"第二期"
    116,"国内外贯流式机组概述及规划设计中的几个问题",,,,,,,,,1982,"第二期"
    117,"从水电厂的运行实践看有关水轮机吸出高度的问题",,,,,,,,,1982,"第二期"
    118,"水轮机的泥沙磨损问题",,,,,,,,,1982,"第二期"
    119,"高海拔地区反击式水轮机的安装高程",,,,,,,,,1982,"第二期"
    120,"CT-40型调速器运行中的故障处理微型水轮发电机组的特点及应用",,,,,,,,,1982,"第二期"
    121,"葛洲坝二江电厂一号机试运行中的几个主要技术问题",,,,,,,,,1982,"第二期"
    122,"葛洲坝水电站1号机是运行中的振动问题",,,,,,,"姚启鹏 单鹰",,1982,"第三期"
    123,"葛洲坝大江工程修改初步设计审查会议召开",,,,,,,"李正安",,1982,"第三期"
    124,"以灌溉为主的水库确定电站装机容量和机组机型选择初探",,,,,,,"辛在森 李佩华",,1982,"第三期"
    125,"设置调压井的简明判断条件",,,,,,,"董其国",,1982,"第三期"
    126,"对反击式水轮机的磨损和气蚀问题的探讨",,,,,,,"李学中",,1982,"第三期"
    127,"答刘家麟同志《商榷》一文",,,,,,,"杜同",,1982,"第三期"
    128,"评"机电规程"及《我国水电站沉排沙设施与水轮机泥沙磨损情况简介》",,,,,,,"杜同",,1982,"第三期"
    129,"沙田水电厂1号机DO6A-LJ-140气蚀检查情况",,,,,,,"冯衍祥",,1982,"第三期"
    130,"吴河电站水轮机的气蚀",,,,,,,"王德初",,1982,"第三期"
    131,"关于陈村水电站水轮机导叶立面密封和技术供水管结露的改进",,,,,,,"陈村水电站生科技",,1982,"第三期"
    132,"对大轴斜吊出机坑问题的看法——兼与除荣华同志商榷",,,,,,,"桓仁发电厂 唐俊达",,1982,"第三期"
    133,"沉江渡水电站2号机上导轴承瓦温过高的分析与处理",,,,,,,"唐上生",,1982,"第三期"
    134,"绿水河水电厂水轮机法兰保护罩哈佛螺栓拉断事故原因分析",,,,,,,"张振卿",,1982,"第三期"
    135,"对某泵站电动机一次烧瓦事故的分析",,,,,,,"吕省三",,1982,"第三期"
    136,"ZD-LH-180水轮机密封装置的改进",,,,,,,"赵之程",,1982,"第三期"
    137,"甘溪水轮发电机组调相问题",,,,,,,"钟凤阳",,1982,"第三期"
    138,"弯头流量计",,,,,,,"董其国摘译",,1982,"第三期"
    139,"攸县阳升观水电站水轮机断斗(报道)",,,,,,,"李德禄",,1982,"第三期"
    140,"As钢板焊接叶片与混凝土模具热压成形的体会",,,,,,,"麦飞",,1982,"第三期"
    141,"水轮机主轴碳精密封衬套修补成功",,,,,,,"唐绩华",,1982,"第三期"
    142,"盐锅峡水轮机叶片修行效果明显",,,,,,,"顾四行",,1982,"第三期"
    143,"江都四站取消主机刹车系统的尝试",,,,,,,"吕省三",,1982,"第三期"
    144,"顶盖排水系统的一点改进",,,,,,,"李长久",,1982,"第三期"
    145,"法兰西斯水泵-水轮机作水轮机运行时迟滞特性的改进",,,,,,,"龚贵屏",,1982,"第三期"
    146,"石门坎电站供水管取水口滤头改进",,,,,,,"扬聿明",,1982,"第三期"
    147,"关于国外水轮机的选择的若干问题",,,,,,,,,1982,"第三期"
    148,"水轮机速率上升计算曲线",,,,,,,,,1982,"第三期"
    149,"装置调压井的简明判别条件",,,,,,,,,1982,"第三期"
    150,"加拿大多米宁工厂工厂水轮机试验台",,,,,,,,,1982,"第三期"
    151,"水泵抽水系统防止水锤的措施",,,,,,,,,1982,"第三期"
    152,"转浆式水轮机的电气协联装置",,,,,,,,,1982,"第三期"
    153,"大功率水轮机齿轮传动",,,,,,,,,1982,"第三期"
    154,"可逆混流式水泵水轮机的设计",,,,,,,,,1982,"第四期"
    155,"包含管道系统的水泵水轮机的研究",,,,,,,,,1982,"第四期"
    156,"水泵水轮机的现代技术",,,,,,,,,1982,"第四期"
    157,"水轮机统计设计方法",,,,,,,,,1982,"第四期"
    158,"水电站装机台数选择的经济标准",,,,,,,,,1982,"第四期"
    159,"北江飞来峡水电站机组选型的若干问题",,,,,,,,,1982,"第四期"
    160,"鸭绿江太平湾发电厂机型选择及水轮机主要特点",,,,,,,,,1982,"第四期"
    161,"气蚀侵蚀在原,模型水轮机上的对比试验",,,,,,,,,1982,"第四期"
    162,"三门峡电站水轮机转轮的气蚀与磨损",,,,,,,,,1982,"第四期"
    163,"鱼鳞坑是水轮机泥沙磨损的特征——兼与杜同同志商榷",,,,,,,,,1982,"第四期"
    164,"水轮机气蚀破坏的估算方法",,,,,,,,,1982,"第四期"
    165,"环氧玻璃丝带涂层修补气蚀破坏的转轮",,,,,,,,,1982,"第四期"
    166,"应用微处理机的自适应式水轮机调速器",,,,,,,,,1982,"第四期"
    167,"适应于小水电的电子负荷调速器",,,,,,,,,1982,"第四期"
    168,"水轮发电机组动态参数的最优控制",,,,,,,,,1982,"第四期"
    169,"水轮机两段关闭的速率升高计算",,,,,,,,,1982,"第四期"
    170,"长田水电站调速器故障处理",,,,,,,,,1982,"第四期"
    171,"关于水轮机调速器控制方案的评价",,,,,,,,,1982,"第四期"
    172,"非金属材料在水轮机中的应用",,,,,,,,,1982,"第四期"
    173,"铸石锒衬在小水轮机上的应用",,,,,,,,,1982,"第四期"
    174,"现场水轮机转轮的互换",,,,,,,,,1982,"第四期"
    175,"舵石鼓电站水轮机主轴密封的改进",,,,,,,,,1982,"第四期"
    176,"环形补气管的效应",,,,,,,,,1982,"第四期"
    177,"修复受气蚀破坏的水轮机部件的经验",,,,,,,,,1982,"第四期"
    178,"卧室水轮机前盖板严重破坏的解决措施",,,,,,,,,1982,"第四期"
    179,"立式水轮发电机轴承甩油问题处理",,,,,,,,,1982,"第四期"
    180,"利用向心风翼解决发电机轴承的油雾问题",,,,,,,,,1982,"第四期"
    181,"评葛洲坝二江电站水轮发电机组的结构",,,,,,,"李正安 张晔 朱京城",,1982,"第五期"
    182,"我国第一台双向潮汐发电机组的概况",,,,,,,"陆凤漾 张锡享",,1982,"第五期"
    183,"尾水堆渣清理情况介绍",,,,,,,"黎森汉",,1982,"第五期"
    184,"15000千瓦水轮发电机定子线圈更换",,,,,,,"徐祖林",,1982,"第五期"
    185,"水轮机油浸式水导轴承跑油事故原因分析",,,,,,,"马庆春",,1982,"第五期"
    186,"南告电站发电机转子事故及处理",,,,,,,"刘厚满 孙艳滨",,1982,"第五期"
    187,"怎样选配中,小型水轮机调速器",,,,,,,"董其国",,1982,"第五期"
    188,"水锤对水轮机转速控制的影响及调速器的改进",,,,,,,"桑原尚夫",,1982,"第五期"
    189,"高压隧洞系统中的瞬变引起控制问题的研究",,,,,,,"H·布瑞柯K·布卡德恩",,1982,"第五期"
    190,"甘肃刘家峡,盐锅峡,八盘峡,碧口水电厂机组运行情况简介",,,,,,,"顾四行",,1982,"第五期"
    191,"叶轮气蚀修复的技术措施",,,,,,,"邓义隆",,1982,"第五期"
    192,"水轮机叶片大面积抗气蚀堆焊工艺小结",,,,,,,"黄铭英",,1982,"第五期"
    193,"从运行实践看乌溪江水电厂",,,,,,,"张兰久",,1982,"第五期"
    194,"加拿大拉格朗日二级水电站水轮机设计",,,,,,,,,1982,"第五期"
    195,"气蚀状态下的水轮机特性",,,,,,,,,1982,"第五期"
    196,"蜗壳表面粗糙度对离心泵性能的影响",,,,,,,,,1982,"第五期"
    197,"沼源抽水蓄能电站高水头水泵——水轮机现场试验结果",,,,,,,,,1982,"第五期"
    198,"提高水轮机的效率",,,,,,,,,1982,"第五期"
    199,"用于水电站的射流泵最优尺寸的选择",,,,,,,,,1982,"第五期"
    200,"日立制作所",,,,,,,,,1982,"第五期"
    201,"世界上100万千瓦以上大型水电站一览表",,,,,,,,,1982,"第五期"
    202,"压力管道水力磨损对调节系统特性的影响",,,,,,,"沈宗树",,1982,"第六期"
    203,"水轮发电机组GD2的选取及水电站调压井设置的计算准则",,,,,,,"孔昭年",,1982,"第六期"
    204,"水压流量传递函数计算的探讨",,,,,,,"马天慈",,1982,"第六期"
    205,"水轮发电机组甩负荷时最大水锤升压和转速升高的简捷算法",,,,,,,"董其国",,1982,"第六期"
    206,"尼龙密封与运行方式",,,,,,,"陈慷",,1982,"第六期"
    207,"发电机转子的吊运方式",,,,,,,"李殿阶",,1982,"第六期"
    208,"刷架结构对高压电机积碳的影响",,,,,,,"陈延义",,1982,"第六期"
    209,"不停机检修与调整电液转换器的方法",,,,,,,"范复生",,1982,"第六期"
    210,"大泵橡胶导轴承一次烧毁事故分析",,,,,,,"吕省三",,1982,"第六期"
    211,"轴流定桨式水轮机叶片的气蚀",,,,,,,"周正祥",,1982,"第六期"
    212,"关于声波与气蚀磨损关系的初步探讨",,,,,,,"潘笃志 李平生",,1982,"第六期"
    213,"灯泡式机组甩负荷时过渡过程的试验研究",,,,,,,,,1982,"第六期"
    214,"拉格朗日水电站113000千瓦混流式水泵——水轮机的现场试验成果",,,,,,,,,1982,"第六期"
    215,"日本国绝缘油火灾资料",,,,,,,,,1982,"第六期"
    216,"应用于水力机械的金属喷镀",,,,,,,,,1982,"第六期"
    217,"伊泰普水轮机",,,,,,,,,1983,"第二期"
    218,"水泵水轮机最佳参数的选定",,,,,,,,,1983,"第二期"
    219,"小型水轮机的标准化",,,,,,,,,1983,"第二期"
    220,"中小型水电站水轮机的技术开发",,,,,,,,,1983,"第二期"
    221,"对提高HL200转轮的使用水头范围的认识",,,,,,,,,1983,"第二期"
    222,"对中小型水电站水轮机抗磨蚀选型问题的一些粗浅认识",,,,,,,,,1983,"第二期"
    223,"绿水河电厂高水头混流式水轮机的振动和气蚀与泥砂磨损问题",,,,,,,,,1983,"第二期"
    224,"关于限制水轮发电机组过速措施的看法",,,,,,,,,1983,"第二期"
    225,"车尔车克梯级水电站水导轴承的更新",,,,,,,,,1983,"第二期"
    226,"HL200转轮的运行调查",,,,,,,,,1983,"第二期"
    227,"石门坎电站水慈机行星齿轮增速装置问题的分析及改进意见",,,,,,,,,1983,"第二期"
    228,"kansai电力公司ok utaragi水电站310000千瓦水泵水轮机现场试验",,,,,,,,,1983,"第二期"
    229,"小水电用双击式水轮机",,,,,,,,,1983,"第三期"
    230,"世界上最先进的抽水蓄能水电站",,,,,,,,,1983,"第三期"
    231,"低水头工况下气蚀对水轮机过流部件的破坏影响",,,,,,,,,1983,"第三期"
    232,"试论水轮机的气蚀与泥沙磨损",,,,,,,,,1983,"第三期"
    233,"EHR78型电气液压调速器",,,,,,,,,1983,"第三期"
    234,"水电站调节的模拟和改进",,,,,,,,,1983,"第三期"
    235,"斜流式水轮机流道内动态压力特性",,,,,,,,,1983,"第三期"
    236,"水锤共振的研究",,,,,,,,,1983,"第三期"
    237,"提高水轮机电液调速器系统工作油压和取消油压装置的探讨",,,,,,,,,1983,"第三期"
    238,"DOWTY4551型和MOOG62型电液伺服阀简介",,,,,,,,,1983,"第三期"
    239,"DTT系列水轮机电子调速器",,,,,,,,,1983,"第三期"
    240,"水轮机导水叶轴颈锒套的技术总结",,,,,,,,,1983,"第三期"
    241,"在水轮机发电机的制动阀上安装机械端接点",,,,,,,,,1983,"第三期"
    242,"向工作轮下输入空气,降低蓄能电站压力管道中的压力脉动值",,,,,,,,,1983,"第三期"
    243,"谈当前我国水轮机主轴密封运行情况及改进意见",,,,,,,,,1983,"第三期"
    244,"水轮机主轴密封装置的运行及改进",,,,,,,,,1983,"第三期"
    245,"乌江泵站运行中的几个问题",,,,,,,,,1983,"第三期"
    246,"春阳滩水电站一号机组运行和检修情况总结",,,,,,,,,1983,"第三期"
    247,"大化电站设备进厂方式简介",,,,,,,,,1983,"第三期"
    248,"大型高水头机组轴向水流引起的振动",,,,,,,,,1983,"第四期"
    249,"圆形断面金属蜗壳,尾水管的∑LV值和体积计算",,,,,,,,,1983,"第四期"
    250,"灯泡式水轮机的气蚀特性和安装高程",,,,,,,,,1983,"第四期"
    251,"EHR78型电气液压调速器(续一)",,,,,,,,,1983,"第四期"
    252,"用微计算机调节水轮机",,,,,,,,,1983,"第四期"
    253,"调速器液压型缓冲器的原理与调试",,,,,,,,,1983,"第四期"
    254,"论立式水轮发电机组的布置方式",,,,,,,,,1983,"第四期"
    255,"S形贯流式水轮机",,,,,,,,,1983,"第四期"
    256,"水轮机止漏装置的现场更换",,,,,,,,,1983,"第四期"
    257,"桐子林电站冲击式水轮机水斗尖圆产生缺口的原因分析",,,,,,,,,1983,"第四期"
    258,"水泵进水管测流法定稳定性分析和应用",,,,,,,,,1983,"第四期"
    259,"双水内冷发电机组水冷系统改进总结",,,,,,,,,1983,"第四期"
    260,"装有弹性金属塑料轴瓦的布拉茨克水电站机组推力轴承真机试验",,,,,,,,,1983,"第四期"
    261,"带有双调压井的水电站调节系统稳定性的研究",,,,,,,"孔昭年",,1983,"第五期"
    262,"江西柘林水力发电厂调相试验报告",,,,,,,"肖赛赛",,1983,"第五期"
    263,"补气对低比速混流式水轮机运行稳定的影响",,,,,,,"丁继茂 王子建",,1983,"第五期"
    264,"葛洲坝二江电站主机安装统筹考虑,加快安装进度",,,,,,,"李正安",,1983,"第五期"
    265,"天桥水电站机组运行稳定的合理调度",,,,,,,"刘玉英 罗高荣",,1983,"第五期"
    266,"泄湖峡电站3000千瓦水轮机水导轴承采用以车代刮新工艺",,,,,,,"王邦佩",,1983,"第五期"
    267,"XT型调速器缓冲器的调整试验",,,,,,,"钟仁焕",,1983,"第五期"
    268,"HL110-WJ-60机组推力轴承及止漏环故障的初步探讨",,,,,,,"周肇琼",,1983,"第五期"
    269,"湖北省的小水电事业",,,,,,,"黄铭英",,1983,"第五期"
    270,"水轮发电机推力轴承温度高的处理",,,,,,,"冯衍祥",,1983,"第五期"
    271,"关于离心泵机组超载问题的探讨",,,,,,,"李志瀛",,1983,"第五期"
    272,"水斗射流的运动学和动力学计算-关于改进切击式水轮机转轮设计的探讨之一",,,,,,,"成越",,1983,"第五期"
    273,"福建沙溪口水电站水轮发电机组及附属装置的扩大初步设计审查会",,,,,,,"李凤华",,1983,"第五期"
    274,"尾水管出口及压力钢管的能量损失",,,,,,,,,1983,"第五期"
    275,"EHR78型电气液压调速器",,,,,,,,,1983,"第五期"
    276,"XT型调速器缓冲器的调整试验",,,,,,,,,1983,"第五期"
    277,"HL-WJ-60机组推力轴承及止漏环故障的初步探讨",,,,,,,,,1983,"第五期"
    278,"关于离心泵机组超载问题的探讨",,,,,,,,,1983,"第五期"
    279,"水轮机的现场试验和最优效率",,,,,,,,,1983,"第五期"
    280,"模型试验和真机性能",,,,,,,,,1983,"第五期"
    281,"菲律宾卡拉彦抽水蓄能电站介绍",,,,,,,,,1983,"第六期"
    282,"高水头混流可逆水泵水轮机水力特性国外情况综述",,,,,,,,,1983,"第六期"
    283,"日本的大容量灯泡机组",,,,,,,,,1983,"第六期"
    284,"多泥沙河流中水轮机的设计问题",,,,,,,,,1983,"第六期"
    285,"苏联国家标准:立轴水轮机的技术条件",,,,,,,,,1983,"第六期"
    286,"岩滩水电站的机组选择和我国大型混流式水轮机的发展",,,,,,,,,1983,"第六期"
    287,"提高设计水平对小水电工程效益的影响",,,,,,,,,1983,"第六期"
    288,"论振动和气蚀的关系",,,,,,,,,1983,"第六期"
    289,"对水轮机气蚀损坏评定标准的分析",,,,,,,,,1983,"第六期"
    290,"再谈六郎洞电厂水轮机快速破坏的原因",,,,,,,,,1983,"第六期"
    291,"关于声波与气蚀磨损关系的初步探讨(续二)",,,,,,,,,1983,"第六期"
    292,"EHR78型电气液压调速器,第四部分,机械液压系统",,,,,,,,,1983,"第六期"
    293,"再论P·I·D调节",,,,,,,,,1983,"第六期"
    294,"水轮机调速器的水压反馈和IPID调节规律",,,,,,,,,1983,"第六期"
    295,"HL110-WJ-35型水轮机止水的简易方法",,,,,,,,,1983,"第六期"
    296,"水电站贮气罐压力封头设计",,,,,,,,,1983,"第六期"
    297,"春阳滩水电站供排水系统设计中存在的问题",,,,,,,,,1983,"第六期"
    298,"抽水蓄能机组现场试验新成果",,,,,,,,,1983,"第六期"
    299,"广西那板,龟石,临江三电站更换转轮初见成效",,,,,,,,,1983,"第六期"
    300,"葛洲坝二江电站安装及运行简评",,,,,,,,,1983,"第六期"
    301,"关于回龙山地下厂房大轴斜吊的几个问题",,,,,,,,,1983,"第六期"
    302,"水轮机甩负荷时的水锤计算",,,,,,,"寿梅华",,1984,"第一期",1
    303,"用正交实验法选择调速器的最佳参数",,,,,,,"钱晓,李庆昆",,1984,"第一期",1
    304,"关于计算水头的选择",,,,,,,"廖资汉",,1984,"第一期",1
    305,"东芝实验室所进行的高水头实验研究",,,,,,,"彭渤",,1984,"第一期",1
    306,"以礼河三级电站水利机械设计运行的经验与问题",,,,,,,"商舸",,1984,"第一期",1
    307,"多泥沙河流水电站水利机械的合理设计与运行",,,,,,,"刘继澄",,1984,"第一期",1
    308,"水电站的低水位运行",,,,,,,"刘丽栗",,1984,"第一期",1
    309,"混流式水轮机经济运行方法讨论",,,,,,,"谢家齐",,1984,"第一期",1
    310,"应用计算机选择灯泡式机组",,,,,,,"游赞培,杨类琪",,1984,"第一期",1
    311,"阿里斯-查尔摩斯公司水轮机设计中气蚀裕量和安装高程的确定",,,,,,,"黄源芳",,1984,"第一期",1
    312,"关于水轮机,发电机振动和摆动国际规程的动向",,,,,,,"张富钦 译",,1984,"第一期",1
    313,"苏联水电站主设备的发展",,,,,,,"王春暖 译",,1984,"第一期",1
    314,"泵站水量计量的合理化",,,,,,,"周英武 译",,1984,"第一期",1
    315,"白山水电站水利机械设计简介",,,,,,,"李春波 李殿阶",,1984,"第二期",2
    316,"低负荷运行时水轮机的气蚀性能",,,,,,,"程则久",,1984,"第二期",2
    317,"新安江电厂水轮机的增容改造",,,,,,,"周文通 徐复钧",,1984,"第二期",2
    318,"办好小水电,充分发挥小水电的经济效益",,,,,,,"黄铭英",,1984,"第二期",2
    319,"黄龙滩水电站水淹厂房事故及防护措施",,,,,,,"陈祖谋",,1984,"第二期",2
    320,"浅谈混流式水轮机转轮止漏装置的修复方法",,,,,,,"王邦佩",,1984,"第二期",2
    321,"转浆式水轮机转轮部件损坏的简易维修法",,,,,,,"周心益",,1984,"第二期",2
    322,"水轮机频率调节线性数学模型的研究",,,,,,,"孔昭年 译",,1984,"第二期",2
    323,"灯泡贯流式水轮机空放运行的模型试验",,,,,,,"黄士芬 译",,1984,"第二期",2
    324,"同瑞士电力工程顾问集团技术交流简况",,,,,,,"茅振华",,1984,"第二期",2
    325,"射流泵的简易设计",,,,,,,"吴次光",,1984,"第三期",3
    326,"ZZF01模型水轮机性能试验研究",,,,,,,"王钟兰 邵希荣",,1984,"第三期",3
    327,"黄河小浪底水电站水轮机参数选择",,,,,,,"李金铣",,1984,"第三期",3
    328,"马迹塘电站灯泡式水轮发电机组介绍(发电机部分)",,,,,,,"李凤华",,1984,"第三期",3
    329,"防止主配压阀振动的自动排气阀",,,,,,,"周泰经 董其国",,1984,"第三期",3
    330,"PC-1500计算机在水电站水利机械初步设计中的应用简介",,,,,,,"孙潞",,1984,"第三期",3
    331,"水轮机连同引水管,调速器和阻尼单元的电子模拟",,,,,,,"陈志鑫 译",,1984,"第三期",3
    332,"水轮机效率的监测系统",,,,,,,"王有华 译",,1984,"第三期",3
    333,"西德在水电站过度过程方面研究情况简介",,,,,,,"李敬恒",,1984,"第三期",3
    334,"关于提高水泵站进水装置效率的探讨",,,,,,,"李志瀛",,1984,"第三期",3
    335,"转叶式轴流泵简介",,,,,,,"龚运龙译",,1984,"第三期",3
    336,"从近代水轮机的发展谈三峡电站水轮机的基本参数的选择",,,,,,,"韦彩新 韩凤琴",,1984,"第四期",4
    337,"潮汐电站双向贯流式水轮机的研究与试验",,,,,,,"陈新方 季盛林 汪福民",,1984,"第四期",4
    338,"水轮发电机推力头甩油原因及其处理",,,,,,,"朱有为",,1984,"第四期",4
    339,"推力轴承及油外循环装置的运行于改造",,,,,,,"童润章",,1984,"第四期",4
    340,"水轮发电机整流子的随机车削",,,,,,,"冯衍祥",,1984,"第四期",4
    341,"微型计算机中水轮机调速系统上的应用",,,,,,,"林焕森 译",,1984,"第四期",4
    342,"PC-1500计算机在流速仪法测流计算中的应用",,,,,,,"姚金根 张锡柱",,1984,"第四期",4
    343,"薄山水电站调压阀的选择计算",,,,,,,"张玉森",,1984,"第四期",4
    344,"圆断面蜗壳\尾水管的∑LV,∑L和体积的简化计算公式",,,,,,,"金少士",,1984,"第四期",4
    345,"水斗式水轮机的发展近况",,,,,,,"陈其秋 茅振华 黄立昊译",,1984,"第四期",4
    346,"国外潮汐式电站和低水头抽水蓄能电站的可逆式机组",,,,,,,"李吉川译",,1984,"第四期",4
    347,"墨西哥拉.安哥斯托水电站的震荡问题",,,,,,,"张培干译",,1984,"第四期",4
    348,"八甲电站HL100(A45)转轮的气蚀及处理",,,,,,,"刘厚满",,1984,"第四期",4
    349,"试论超声与气蚀的关系",,,,,,,"潘笃志",,1984,"第四期",4
    350,"防止虹吸式轴流泵站机组启动振动的简便方法",,,,,,,"陆林广",,1984,"第四期",4
    351,"开发小水电,提高小水电经济效益",,,,,,,"刘德安",,1984,"第四期",4
    352,"天生桥一级水电站可行性研究阶段水轮机选择",,,,,,,"蔡锦华 商舸",,1984,"第五期",5
    353,"φ400减压阀与φ200安全阀工业试验",,,,,,,"李前惠",,1984,"第五期",5
    354,"马迹塘电站灯泡式水轮发电机组介绍(水轮机部分)",,,,,,,"杜善秀 池耀武",,1984,"第五期",5
    355,"水轮机两端关闭规律及其压力升高计算",,,,,,,"余明新",,1984,"第五期",5
    356,"水斗式水轮机在反压条件下的运行",,,,,,,"佟文敏",,1984,"第五期",5
    357,"葛洲坝电站水轮机叶片密封漏油分析和处理",,,,,,,"林太举",,1984,"第五期",5
    358,"大化电站水轮机叶片根部裂纹的探究",,,,,,,"郭养明",,1984,"第五期",5
    359,"水泵水轮机工况的性能预估",,,,,,,"江文琴译",,1984,"第五期",5
    360,"混流式水轮机的水头特性和转轮进口的流速分布",,,,,,,"蒋菊平译",,1984,"第五期",5
    361,"国外水电站通过技术更新取得经济效益的某些实例",,,,,,,"褚德珊",,1984,"第五期",5
    362,"泻湖峡电站水轮机叶片断裂事故介绍",,,,,,,"王邦佩",,1984,"第五期",5
    363,"低水头电站小型水轮发电机组的转速问题",,,,,,,"谢佩遵",,1984,"第五期",5
    364,"用氧-乙炔火焰效正水轮机底环严重变形",,,,,,,"樊学敏",,1984,"第五期",5
    365,"羊湖水电站三机式抽水蓄能机组初探",,,,,,,"李忠全 茅振华 何箤伯",,1984,"第六期",6
    366,"水轮机转轮水力不平衡引起主轴摆动的简单分析",,,,,,,"佟文敏",,1984,"第六期",6
    367,"对《机电设计手册》水机分册中技术供排水系统水力计算实例的几点看法",,,,,,,"邬承玉",,1984,"第六期",6
    368,"新安江电厂增容机型的效率特性比较",,,,,,,"谭国伟",,1984,"第六期",6
    369,"水轮机离散控制系统",,,,,,,"邓崇炽",,1984,"第六期",6
    370,"虹吸式进水口在无蝶阀情况下机组甩负荷过度负荷分析",,,,,,,"张法思 朱建和",,1984,"第六期",6
    371,"长江泥沙对水轮机材料的磨损及其预防",,,,,,,"刘家麟译",,1984,"第六期",6
    372,"挪威KVAERNER 工厂高水头混流式水轮机的设计和运行",,,,,,,"徐正镐译",,1984,"第六期",6
    373,"略谈甘肃小水电代运行和管理",,,,,,,"甘肃电力局中试所水机室",,1984,"第六期",6
    374,"螺杆泵制造工艺的三点改进",,,,,,,"陈善奎 邓正祥 钱晓",,1984,"第六期",6
    375,"石龙坝发电厂混流式转轮叶片的简捷测绘法",,,,,,,"卜育民",,1984,"第六期",6
    376,"黄河李家峡水电站水轮机基本参数的选择",,,,,,,"李明松",,1985,"第一期",7
    377,"谈大古里700MW水轮机的模型试验",,,,,,,"黄源芳",,1985,"第一期",7
    378,"具有水压反馈的调速器",,,,,,,"沈宗树",,1985,"第一期",7
    379,"轴流式水轮机综合治理浅见",,,,,,,"崔维志",,1985,"第一期",7
    380,"D06A-LJ-140水轮机初期运行气蚀情况及初步分析",,,,,,,"冯衍祥",,1985,"第一期",7
    381,"水轮机材料",,,,,,,"张富钦 译",,1985,"第一期",7
    382,"高水头大容量抽水蓄能机组现场试验",,,,,,,"陈其秋译",,1985,"第一期",7
    383,"装有转浆式水轮机的水电站机组安全运转问题",,,,,,,"王春暖译",,1985,"第一期",7
    384,"解决拉格朗二级电站水轮机的严重气蚀问题",,,,,,,"张至宁 卢建译",,1985,"第一期",7
    385,"氧乙炔热喷焊在小型水轮机抗磨损中的应用",,,,,,,"樊学敏 方启福",,1985,"第一期",7
    386,"水电站最低自流技术供水水头的确定",,,,,,,"张继强",,1985,"第一期",7
    387,"双喷咀水斗式水轮机的选型",,,,,,,"闵凤宾",,1985,"第二期",8
    388,"尾水洞长度及尾水调压井对水轮机控制系统稳定性的影响",,,,,,,"沈宗树 张均澍 蔡锦华",,1985,"第二期",8
    389,"葛洲坝电站水力机械运行和检修",,,,,,,"林太举",,1985,"第二期",8
    390,"中比速水泵水轮机调相压水和气中启动的模型试验",,,,,,,"刘尚智 张新沙译",,1985,"第二期",8
    391,"水力机组转入调相工况的压气系统试验",,,,,,,"钟光华译",,1985,"第二期",8
    392,"蝴蝶阀的动态特性",,,,,,,"李贤庆 余敏译",,1985,"第二期",8
    393,"原型水轮机流量的简易测定方法",,,,,,,"张利",,1985,"第二期",8
    394,"潮汐电站转轮叶片的气蚀",,,,,,,"谢佩遵",,1985,"第二期",8
    395,"噪音的产生和防止",,,,,,,"曹雄伟",,1985,"第二期",8
    396,"关于水泵站出水管经济直径的探讨",,,,,,,"李志瀛",,1985,"第二期",8
    397,"加强水轮机标准化工作的几点意见",,,,,,,"吴培豪",,1985,"第三期",9
    398,"反击式水轮机基本参数的选择",,,,,,,"杨惠美",,1985,"第三期",9
    399,"转浆式水轮机工作特性曲线绘制",,,,,,,"陈涛",,1985,"第三期",9
    400,"混凝土蜗壳外形尺寸BASIC计算程序",,,,,,,"朱建和",,1985,"第三期",9
    401,"尾水管内隔墩对效率影响的试验研究",,,,,,,"王钟兰 张载娥",,1985,"第三期",9
    402,"必须重视水电厂的监测工作",,,,,,,"欧学修",,1985,"第三期",9
    403,"水轮机及其压力水管,调速器和缓冲装置的电子仿真",,,,,,,"陈瑞甜译",,1985,"第三期",9
    404,"苏联现有水电站的技术改造和现代化",,,,,,,"诸德珊译",,1985,"第三期",9
    405,"水力机械大轴断面碳精密封研究",,,,,,,"李吉川译",,1985,"第三期",9
    406,"连城水电厂水轮机的增容改造",,,,,,,"童润章",,1985,"第三期",9
    407,"湖南镇扩容电站水轮机参数分析及厂房布置",,,,,,,"李玉华 朱玉祥",,1985,"第四期",10
    408,"斜流式水泵水轮机运行实践及分析",,,,,,,"黄宣范",,1985,"第四期",10
    409,"水斗式水轮机的断斗事故分析与处理",,,,,,,"闵凤宾等",,1985,"第四期",10
    410,"引水式电站调节系统小波动稳定分析与调节参数的选择",,,,,,,"李金铣",,1985,"第四期",10
    411,"抽水蓄能水电站水泵水轮机的选择",,,,,,,"佟文敏译",,1985,"第四期",10
    412,"改善美国水电站可靠性的研究",,,,,,,"胡汉卿译",,1985,"第四期",10
    413,"混流式水轮机在气蚀工况下的运行特性",,,,,,,"龚贵屏译",,1985,"第四期",10
    414,"水轮机尾水管的脉动",,,,,,,"花炳铨译",,1985,"第四期",10
    415,"微型水轮发电机组试验研究",,,,,,,"黄正明",,1985,"第四期",10
    416,"中,小型水轮机径向倒水机构布置图的简单绘制方法",,,,,,,"张蓉生",,1985,"第四期",10
    417,"关于下导轴承甩油的处理",,,,,,,"刘克仁",,1985,"第四期",10
    418,"李家峡水电站初步设计阶段水轮机选择",,,,,,,"沙莉",,1985,"第五期",11
    419,"轴流转浆式水轮机起动过度过程内特性解析度数值计算方法",,,,,,,"常近时 耿延芳",,1985,"第五期",11
    420,"水轮机反向水推力的计算和防抬机的对策",,,,,,,"张成冠",,1985,"第五期",11
    421,"水轮机经济运行计算机实时控制",,,,,,,"王为 陈云年",,1985,"第五期",11
    422,"水轮机及水泵水轮机的最近技术动向",,,,,,,"刘保华译",,1985,"第五期",11
    423,"不同比转速单吸离心泵的性能预估",,,,,,,"江文琴译",,1985,"第五期",11
    424,"水泵适用于作水轮机使用",,,,,,,"李国梁译",,1985,"第五期",11
    425,"微型水力发电",,,,,,,"张富钦译",,1985,"第五期",11
    426,"可逆式水泵-水轮机特性估算",,,,,,,"刘燕生译",,1985,"第六期",12
    427,"大型水泵机组选型设计",,,,,,,"陈希文译",,1985,"第六期",12
    428,"伊泰普水轮机若干设计与制造问题的解决办法",,,,,,,"吴培豪译",,1985,"第六期",12
    429,"鲁布革水电站主机设备的择优选厂",,,,,,,"青长庚",,1986,"第一期",13
    430,"可逆式水泵水轮机统计法选型",,,,,,,"胡汉卿 任德奇",,1986,"第一期",13
    431,"水轮机间隙气蚀及防止方法",,,,,,,"程则久",,1986,"第一期",13
    432,"水轮机实行模型试验验收的建议",,,,,,,"王钟兰 乐枚",,1986,"第一期",13
    433,"水轮机综合特性曲线的计算机处理",,,,,,,"陈德新",,1986,"第一期",13
    434,"反击式水轮机机型选择与参数计算",,,,,,,"钟光华 ",,1986,"第一期",13
    435,"用PC-1500机绘制弯肘尾水管水平剖面",,,,,,,"陈涛",,1986,"第一期",13
    436,"用PC-1500机进行金属蜗壳外形尺寸的计算",,,,,,,"王建华",,1986,"第一期",13
    437,"混流式水轮机的变落差特性",,,,,,,"刘保华译",,1986,"第一期",13
    438,"美国巴翁达丽水电站低水头大容量混流式水轮机的设计制造",,,,,,,"江会福译",,1986,"第一期",13
    439,"新型小水机的研制",,,,,,,"牛笑莲译",,1986,"第一期",13
    440,"加拿大拉格朗德工厂水轮机环形闸门",,,,,,,"王春珍译",,1986,"第一期",13
    441,"葛洲坝二江电站技术供水系统设计运行总结",,,,,,,"周永久",,1986,"第二期",14
    442,"转桨式水轮机"λ"型密封装置的优化",,,,,,,"俞国强",,1986,"第二期",14
    443,"国产水轮机转轮气蚀的运行分析",,,,,,,"陶德圣 张兰久",,1986,"第二期",14
    444,"江夏潮汐电站三号机组的有关问题",,,,,,,"孙定茂",,1986,"第二期",14
    445,"关于变工况水轮机转轮出口相对速度的计算",,,,,,,"黄兆骥",,1986,"第二期",14
    446,"离心飞摆静特性的调整",,,,,,,"吕鸿年",,1986,"第二期",14
    447,"PC-1500计算机中流速仪法效率试验中的应用",,,,,,,"白家骢",,1986,"第二期",14
    448,"水电站调节系统稳定的仿真计算",,,,,,,"钟光华",,1986,"第二期",14
    449,"斜向导水机构相对运行求解过程",,,,,,,"林昌杰 罗凤云 江晓明",,1986,"第二期",14
    450,"选择与设计冲击式水轮机的现代趋势",,,,,,,"郑广雄译",,1986,"第二期",14
    451,"抽水蓄能水电站尾水管不同翘角的水力试验",,,,,,,"陆维勋译",,1986,"第二期",14
    452,"最近流量计的技术动向",,,,,,,"马天慈译",,1986,"第二期",14
    453,"太平湾电站1#机组出力不足的初步分析",,,,,,,"白广仁",,1986,"第三期",15
    454,"凤滩等水电站机组振动过大的原因及其消振措施的探讨",,,,,,,"李启荣",,1986,"第三期",15
    455,"确定水力机械检修期限的方法",,,,,,,"童建栋",,1986,"第三期",15
    456,"解决乌江渡推力轴瓦烧瓦的若干技术措施",,,,,,,"肖宾",,1986,"第三期",15
    457,"水电站供排水射流泵的电算方法",,,,,,,"王建华",,1986,"第三期",15
    458,"渠道流速仪法效率试验程序",,,,,,,"姚金根 朱钦立",,1986,"第三期",15
    459,"PAPID-77型电液调速器",,,,,,,"李方",,1986,"第三期",15
    460,"泵通流部件的制造偏差及其对泵热性参数的影响",,,,,,,"牛笑莲译",,1986,"第三期",15
    461,"灌溉水库水电站机组选择的概率方法",,,,,,,"罗高荣 武桂梅",,1986,"第三期",15
    462,"微型水轮机水导轴承结构和材料的改进",,,,,,,"黄正明",,1986,"第三期",15
    463,"GT型调速器的电站试验及性能分析",,,,,,,"王良佑",,1986,"第三期",15
    464,"KB,EW,AC三家公司对含沙水流条件下水轮机选择设计的措施",,,,,,,"青长庚",,1986,"第四期",16
    465,"三峡水电厂水轮机主要水力参数选择初探",,,,,,,"余健棠",,1986,"第四期",16
    466,"论切击式水轮机水斗数目的最新计算方法",,,,,,,"黄兆骥 章厚德 张淑芳",,1986,"第四期",16
    467,"轴流式水轮机叶片测绘方法发探讨",,,,,,,"李品洪 李仲龄 林太举等",,1986,"第四期",16
    468,"水轮机调速器及其调节系统的模型试验装置",,,,,,,"姜之琦",,1986,"第四期",16
    469,"调节系统静特性的调整",,,,,,,"吕鸿年",,1986,"第四期",16
    470,"混流式水轮机的发展",,,,,,,"石清华等译",,1986,"第四期",16
    471,"简单调压井的最大涌浪计算",,,,,,,"彭渤译",,1986,"第四期",16
    472,"电磁流量计的新技术和发展方向",,,,,,,"马天慈译",,1986,"第四期",16
    473,"对二滩水轮机选型的一些看法",,,,,,,"龚贵屏",,1986,"第五期",17
    474,"水轮机参数准确确定方法",,,,,,,"张蓉生",,1986,"第五期",17
    475,"葛洲坝大江九号机应用NW6231振动仪进行现场测试报告",,,,,,,"林太举",,1986,"第五期",17
    476,"全贯流式水轮机的试验研究",,,,,,,"王华辉",,1986,"第五期",17
    477,"碧口水电站一号机水力共振的分析与改善措施",,,,,,,"龚守志 黄凌",,1986,"第五期",17
    478,"水锤对抽水蓄能电站设计和运行的影响(近似计算部分)",,,,,,,"陈菜洲 周德威译",,1986,"第五期",17
    479,"小型水轮机适用技术",,,,,,,"娄子龙译",,1986,"第五期",17
    480,"略谈哥马水电站水力机械设计中的几个问题",,,,,,,"李玉华",,1986,"第五期",17
    481,"开发适用低负荷运行的混流式转轮",,,,,,,"花炳铨",,1986,"第五期",17
    482,"混流式水轮机水力稳定性的评估",,,,,,,"李建成",,1986,"第六期",18
    483,"国内水轮机流量效率测量装置的选择与评价",,,,,,,"欧学修",,1986,"第六期",18
    484,"轴流式机组下机架上设置止推轴承的研究",,,,,,,"陈济",,1986,"第六期",18
    485,"气蚀机理探讨——固体材料的"软化层"假说",,,,,,,"冯永中",,1986,"第六期",18
    486,"大型转浆式和混流式水轮机的新型谱",,,,,,,"陆维勋译",,1986,"第六期",18
    487,"水力机械模型验收试验",,,,,,,"方源译",,1986,"第六期",18
    488,"水轮发电机组的在线效率监测",,,,,,,"余长风译",,1986,"第六期",18
    489,"克里明楚格水电站运行工况对水轮机可靠性的影响",,,,,,,"王春暖译",,1986,"第六期",18
    490,"达利西余抽水蓄能电站概况及考察印象",,,,,,,"寿梅华",,1986,"第六期",18
    491,"于桥水电站机组选型及轴伸贯流机组的应用趋势",,,,,,,"陈森",,1986,"第六期",18
    492,"辉绿岩铸石在小型水轮机抗磨蚀方面的应用",,,,,,,"田至喜 李春生",,1986,"第六期",18
    493,"水压制动器",,,,,,,"周泰经 陆秋蓉",,1986,"第六期",18
    494,"拉西瓦水轮机选择可行性分析",,,,,,,"田树棠",,1987,"第一期",19
    495,"双列叶栅绕流原理及其子水力机械中的应用——兼论鲁布革水电站引进的挪威带副叶片的水轮机转轮",,,,,,,"李胜才",,1987,"第一期",19
    496,"竖井贯流式水轮机的可逆特性试验研究",,,,,,,"蒋静华",,1987,"第一期",19
    497,"反击式水轮机导叶密封与漏水量计算",,,,,,,"曲道志",,1987,"第一期",19
    498,"水轮机两端关闭的调节保证计算——PC-1500机辅助",,,,,,,"王建华",,1987,"第一期",19
    499,"西藏羊湖电站的频率调节",,,,,,,"刘保华 ",,1987,"第一期",19
    500,"微机在流速仪法效率试验中的应用",,,,,,,"雷三省",,1987,"第一期",19
    501,"日本的水轮机及其新技术——第一次中日《水力机械》国际会议日方情况综述",,,,,,,"钱晓编译",,1987,"第一期",19
    502,"CKD Blansko可逆混流式水轮机研究二十年纪要",,,,,,,"寿梅华译",,1987,"第一期",19
    503,"超声波流量计的新技术和发展方向",,,,,,,"马天慈译",,1987,"第一期",19
    504,"K80型桨叶控制组合装置简介",,,,,,,"刘钢译",,1987,"第一期",19
    505,"转浆式水轮机桨叶密封装置结构浅析",,,,,,,"方庆江",,1987,"第二期",20
    506,"虹吸式油水分离装置的设计",,,,,,,"熊腾晖",,1987,"第二期",20
    507,"双吸射流泵在水电站制冷工程中的应用",,,,,,,"万良牯",,1987,"第二期",20
    508,"对水电站水轮机过机含沙量问题的探讨",,,,,,,"佟文敏",,1987,"第二期",20
    509,"双向贯流式水轮机流场实测",,,,,,,"吴洁等",,1987,"第二期",20
    510,"大化水电站水轮机抬机现象及其分析",,,,,,,"聂启蓉 刘益祥",,1987,"第二期",20
    511,"水轮机圆筒式保护闸阀",,,,,,,"付国峰译",,1987,"第二期",20
    512,"简单调节和压力波动的模拟分析",,,,,,,"郑灿新译",,1987,"第二期",20
    513,"水电站频率调节",,,,,,,"沈东译",,1987,"第二期",20
    514,"水轮机电液调速器技术条件(Гoct12405-81)",,,,,,,"童建栋译",,1987,"第二期",20
    515,"试论水斗式水轮机选择的特点",,,,,,,"李忠全",,1987,"第三期",21
    516,"葛洲坝大江电站水力机械运行和检修",,,,,,,"林太举",,1987,"第三期",21
    517,"水轮机尾水管高度的确定",,,,,,,"张蓉生",,1987,"第三期",21
    518,"用球形测头测量水利机械转轮叶片的方法",,,,,,,"邵长城 梁建国",,1987,"第三期",21
    519,"超声波测流在水电厂中的应用",,,,,,,"范华秀 陈晓霞",,1987,"第三期",21
    520,"奥氏体不锈钢抗气蚀初探",,,,,,,"谢欣",,1987,"第三期",21
    521,"水轮机调节系统小波动过度过程的模拟计算",,,,,,,"白家骢 张莉云",,1987,"第三期",21
    522,"在200~800米水有范围内混流式与冲击式水轮机比速",,,,,,,"钟光华译",,1987,"第三期",21
    523,"大容量水斗式水轮机的发展",,,,,,,"王春暖译",,1987,"第三期",21
    524,"卡普兰水轮机转轮叶片的固有振动及水流激发振动的研究",,,,,,,"耿延芳译",,1987,"第三期",21
    525,"瑞士球阀设计和制造技术的发展",,,,,,,"陈菜洲 李从众译",,1987,"第三期",21
    526,"东芝重电技术研究所水力实验室",,,,,,,"张富钦",,1987,"第三期",21
    527,"灯泡式水轮机组发展趋势及现代灯泡式水轮机组的特点",,,,,,,"马振宗",,1987,"第四期",22
    528,"浅谈喀斯特地下水中CO2气体在气蚀过程中的作用和影响",,,,,,,"张振卿",,1987,"第四期",22
    529,"混凝土蜗壳长度及∑LV的解析计算方法",,,,,,,"杨亚伦",,1987,"第四期",22
    530,"水电站压力容器设计中的几个问题",,,,,,,"李玉华",,1987,"第四期",22
    531,"调速器稳定参数优选的新方法",,,,,,,"王国平",,1987,"第四期",22
    532,"水轮机特性曲线的多项式拟合",,,,,,,"江卫",,1987,"第四期",22
    533,"双向贯流式水力机械试验台数据库管理系统",,,,,,,"吴洁 ",,1987,"第四期",22
    534,"气蚀对混流式水轮机及水泵水轮机的影响",,,,,,,"陈祖谋译",,1987,"第四期",22
    535,"长压力引水道水轮发电机组的稳定分析及其改进",,,,,,,"钟承纲译",,1987,"第四期",22
    536,"影响水轮机性能的材料工艺",,,,,,,"吴君平译",,1987,"第四期",22
    537,"灯泡式水轮机几何尺寸",,,,,,,"张礼达译",,1987,"第四期",22
    538,"奥地利水电业简介",,,,,,,"钟凤英",,1987,"第四期",22
    539,"水口水轮机选型问题",,,,,,,,,1987,"第五期",23
    540,"水轮机选择和订购方面的趋势",,,,,,,,,1987,"第五期",23
    541,"苏联水机届及水轮机若干技术领域发展概况",,,,,,,,,1987,"第五期",23
    542,"水轮机全特性曲线的一种计算机存贮方法",,,,,,,,,1987,"第五期",23
    543,"关于灌溉水库水电站最优设计水头确定方法的探讨",,,,,,,,,1987,"第五期",23
    544,"水轮机转轮的损伤管理指标",,,,,,,,,1987,"第五期",23
    545,"双微机容错式测频系统",,,,,,,,,1987,"第五期",23
    546,"关于小型水电站无调速器机组的过速保护问题",,,,,,,,,1987,"第五期",23
    547,"水利机组相对效率的测量",,,,,,,,,1987,"第五期",23
    548,"灯泡式水轮机模型试验研究",,,,,,,,,1987,"第五期",23
    549,"三峡电站泥沙对水轮机危害的探讨",,,,,,,"刘家麟",,1987,"第六期",24
    550,"龙羊峡水轮机运行性能分析与评估",,,,,,,"田树棠",,1987,"第六期",24
    551,"低水头电站水轮机选型问题",,,,,,,"张振英",,1987,"第六期",24
    552,"关于压力容器安全阀的选择和计算问题",,,,,,,"薛希贵",,1987,"第六期",24
    553,"导叶分段关闭时水轮机甩负荷过度过程解析计算",,,,,,,"常近时 ",,1987,"第六期",24
    554,"CAD在水力机械设计中的运用",,,,,,,"蔡锦华 林幼宜 江湛瑛",,1987,"第六期",24
    555,"水泵水轮机设计的发展趋势",,,,,,,"江文琴译",,1987,"第六期",24
    556,"蝴蝶阀活门的最小刚度标准",,,,,,,"闵凤宾译",,1987,"第六期",24
    557,"流体的抗张强度对潜没体发生气蚀的影响",,,,,,,"杨绍雄译",,1987,"第六期",24
    558,"小水电站的生产噪音及防治",,,,,,,"赵云程",,1987,"第六期",24
    559,"水轮机调速器微机动态测试仪",,,,,,,"杨惠生",,1988,"第一期",25
    560,"用频率特性法计算冲击式水轮机适应式调速器的最佳参数",,,,,,,"钱晓 李耀辉",,1988,"第一期",25
    561,"水电站高压气压水调相初探",,,,,,,"沙文彬",,1988,"第一期",25
    562,"顶盖供水中的一项新技术措施",,,,,,,"康健",,1988,"第一期",25
    563,"对水电站水力机械施工中设计的几点建议",,,,,,,"陈荣华",,1988,"第一期",25
    564,"水电站超声——蜗差联合测流方法探讨",,,,,,,"霍佃中",,1988,"第一期",25
    565,"水轮机力矩与流量传递系数程序",,,,,,,"白家骢 张莉云 陈小琳",,1988,"第一期",25
    566,"古里二级电厂730MW混流式水轮机设计概要及现场试验结果",,,,,,,"杜传忠译",,1988,"第一期",25
    567,"转轮密封泄漏引起水轮机转子振动的模型研究",,,,,,,"江文琴译",,1988,"第一期",25
    568,"奥地利瑙多河上的低水头水力发电",,,,,,,"刘伟译",,1988,"第一期",25
    569,"每个导叶配一个接力器布置的优点",,,,,,,"狄国强译",,1988,"第一期",25
    570,"关于斜击式水轮机设计,制造中的几个实际问题的探讨",,,,,,,"黄兆骥",,1988,"第一期",25
    571,"论全国500kw以下轴流式水轮机统一设计",,,,,,,"黄正明",,1988,"第一期",25
    572,"白垢电站10MW灯泡贯流式水轮发电机组研制总结",,,,,,,"天津发电设备厂",,1988,"第二期",26
    573,"全贯流式水轮机的发展",,,,,,,"宋盛文",,1988,"第二期",26
    574,""六五"期间我国水轮机调速技术的进步及对今后工作的建议",,,,,,,"孔昭年 ",,1988,"第二期",26
    575,"大容量水电机组双微机调速器的试验",,,,,,,"刘安平 王智勇 黄晓平",,1988,"第二期",26
    576,"葛洲坝转浆式水轮机超载运行稳定性问题",,,,,,,"林太举",,1988,"第二期",26
    577,"比转速提高对水轮机气蚀的影响 ",,,,,,,"田子勤",,1988,"第二期",26
    578,"石盘滩水电站机型选择",,,,,,,"郭建辉 古丽亚",,1988,"第二期",26
    579,"10余年来混流式水轮机的设计趋势",,,,,,,"寿梅华译",,1988,"第二期",26
    580,"混流式水轮机组部分负荷工况下水力效率的改善",,,,,,,"杜传忠译",,1988,"第二期",26
    581,"混流式水轮机导叶压力分布的量测和计算",,,,,,,"杨炎译",,1988,"第二期",26
    582,"论反击式水轮机安装高程的计算条件",,,,,,,"姚成焕",,1988,"第三期",27
    583,"流道型式对斜流式水轮机特性的影响",,,,,,,"童建栋",,1988,"第三期",27
    584,"关于配电装置压缩空气系统压力等级问题",,,,,,,"李忠全",,1988,"第三期",27
    585,"GG220-W-35型高水头贯流式水轮机的性能测试",,,,,,,"刘小兵",,1988,"第三期",27
    586,"葛洲坝水轮机主轴密封装置的运行分析",,,,,,,"张新发",,1988,"第三期",27
    587,"对国内最大球阀运行异常工况的剖析及其改造对策",,,,,,,"李维中",,1988,"第三期",27
    588,"长滩电站水轮机过流部件的气蚀与泥沙磨损",,,,,,,"李宏华",,1988,"第三期",27
    589,"转浆式水轮机设计的发展",,,,,,,"寿梅华译",,1988,"第三期",27
    590,"具有卡普兰水轮机的水电厂大波动的分析方法",,,,,,,"刘怀金译",,1988,"第三期",27
    591,"小型轴伸贯流式水轮机的应用",,,,,,,"李国梁 ",,1988,"第三期",27
    592,"铜街子水电站水轮机选型论证",,,,,,,"陈其秋",,1988,"第四期",28
    593,"拉西瓦水轮机气蚀特性模糊优化方法",,,,,,,"田树棠",,1988,"第四期",28
    594,"潮汐电站双向贯流式水轮机的内部流场研究",,,,,,,"兰天辉 季盛林 陈新方",,1988,"第四期",28
    595,"水力机械动态模拟试验中各动态参数的测量方法",,,,,,,"周锁生 尹延凯 严亚芳 ",,1988,"第四期",28
    596,"双微机调节器人机对话接口设计",,,,,,,"李维东",,1988,"第四期",28
    597,"水轮机微机调速器PID算法",,,,,,,"刘钢 ",,1988,"第四期",28
    598,"电站热力干燥压力选择计算",,,,,,,"郭筱蓉",,1988,"第四期",28
    599,"水环式真空泵的选用",,,,,,,"杨文守",,1988,"第四期",28
    600,"冲击式水轮机设计与布置的近代趋势",,,,,,,"寿梅华译",,1988,"第四期",28
    601,"罗贡水电站水轮机过流部件的结构设计与研究",,,,,,,"佟文敏译 ",,1988,"第四期",28
    602,"低水头电站水轮机的布置",,,,,,,"敖建平 林昌杰译",,1988,"第四期",28
    603,"关于水电设备国际招标工作",,,,,,,"郭恒春",,1988,"第五期",29
    604,"鲁布革水电站地下主厂房的布置设计",,,,,,,"徐正镐",,1988,"第五期",29
    605,"岩滩水电站水轮机模型验收试验",,,,,,,"王钟兰 邵希荣 胡惠良",,1988,"第五期",29
    606,"大型水斗式水轮机的研制",,,,,,,"曹景尧",,1988,"第五期",29
    607,"美国拜塔索电站机组简介",,,,,,,"杨影丹",,1988,"第五期",29
    608,"水轮机气蚀系数比转速关系",,,,,,,"狄国强 刘艳",,1988,"第五期",29
    609,"水力过渡过程计算中抽水蓄能机组边界的处理",,,,,,,"叶跃平",,1988,"第五期",29
    610,"应用拉士反变换计算机模拟水轮机调节系统小波动过渡过程",,,,,,,"张莉云 赵洁",,1988,"第五期",29
    611,"白垢电站灯泡机组水轮机主轴与转轮体连轴螺栓断裂原因探讨",,,,,,,"陈松坚",,1988,"第五期",29
    612,"努列克和萨扬舒申斯克水电站水轮机机组段运转特性曲线",,,,,,,"王暖春译",,1988,"第五期",29
    613,"水利机械情报网第五次全国大会纪要",,,,,,,,,1988,"第五期",29
    614,"在水机情报网第五次全国大会上的讲话",,,,,,,"端润生",,1988,"第五期",29
    615,"高原地区混流卧式水轮机尾水管的改型试验与研究",,,,,,,"杨惠美",,1988,"第六期",30
    616,"万安水电站的高压调相",,,,,,,"江会福",,1988,"第六期",30
    617,"水轮机顶盖排水射流泵研制",,,,,,,"孙定茂",,1988,"第六期",30
    618,"尼兰比水电站水利机械设计简介",,,,,,,"姜昌文",,1988,"第六期",30
    619,"产生气蚀破坏的一种新假设",,,,,,,"张开贵",,1988,"第六期",30
    620,"水电站计算机监视控制系统",,,,,,,"沈宗树 王为 万永明",,1988,"第六期",30
    621,"大小波动仿真程序的统一",,,,,,,"刘昌玉",,1988,"第六期",30
    622,"微机调速器在欧阳海水电站的运行",,,,,,,"周统中",,1988,"第六期",30
    623,"转浆式水轮机近十年来的设计趋势",,,,,,,"田子勤 张力天译",,1988,"第六期",30
    624,"罗贡水电站水力设备新的先进方案",,,,,,,"耿济洲译",,1988,"第六期",30
    625,"全贯流水轮机的轴承与密封",,,,,,,"廖肇兴译 ",,1988,"第六期",30
    626,"离心泵(BX150-7)全特性试验研究",,,,,,,"牛笑莲 ",,1989,"第一期",31
    627,"万安水电站2×300/50吨桥式起重机负荷试验",,,,,,,"杨晓林",,1989,"第一期",31
    628,"轴伸贯流式水轮机的发展和应用趋势",,,,,,,"田子勤",,1989,"第一期",31
    629,"径流式电站水轮机选型的分析",,,,,,,"张蓉生",,1989,"第一期",31
    630,"沙溪口一号机组调速器特点及调试简介",,,,,,,"孙定茂",,1989,"第一期",31
    631,"盐锅峡水电厂T-100型机械调速器技术改造工作总结",,,,,,,"刘亚民 冯秋华",,1989,"第一期",31
    632,"萨扬舒申斯克水电站机组同周期调相机工况切换系统的调试与改进",,,,,,,"王春暖译",,1989,"第一期",31
    633,"水轮机真机汽蚀试验研究",,,,,,,"张邵平译",,1989,"第一期",31
    634,"离心泵蜗壳的测量结果",,,,,,,"赵春明译",,1989,"第一期",31
    635,"大型水轮机选择的多元素决策",,,,,,,"田树棠",,1989,"第二期",32
    636,"转桨式水轮机桨叶密封结构型式的探讨",,,,,,,"黄士芬 ",,1989,"第二期",32
    637,"偏流切换装置的设计与控制",,,,,,,"沈祝平",,1989,"第二期",32
    638,"微机绘制水轮机运转特性曲线",,,,,,,"庄汉辉 梁建维",,1989,"第二期",32
    639,"对几个多泥沙电站水轮机磨蚀情况的调查报告",,,,,,,"刘守忠",,1989,"第二期",32
    640,"关于水轮机性能预测的研究",,,,,,,"张富钦译",,1989,"第二期",32
    641,"混流式水轮机的汽蚀区域",,,,,,,"王钟兰译",,1989,"第二期",32
    642,"具有良好的抗汽蚀性能的简化水轮机转轮",,,,,,,"万端阳译",,1989,"第二期",32
    643,"选择水电站机组台数的经济准则",,,,,,,"刘小兵译",,1989,"第二期",32
    644,"水轮机的新型进水阀门——圆筒阀",,,,,,,"曾文秀",,1989,"第三期",33
    645,"过渡过程中桨叶变化对最大负轴向力影响的试验研究",,,,,,,"严亚芳 沈祖诒 周锁生",,1989,"第三期",33
    646,"调速器静,动特性微机测试系统",,,,,,,"万永明 沈宗树 吴艳",,1989,"第三期",33
    647,"导叶二段关闭时压力上升的解析计算",,,,,,,"彭宽平",,1989,"第三期",33
    648,"灯泡式水轮机设计的发展",,,,,,,"何新洲 狄国强 王立强",,1989,"第三期",33
    649,"水电站更新设备的决策方法论",,,,,,,"寿梅华译",,1989,"第三期",33
    650,"国际小型水轮机的标准化",,,,,,,"童建栋",,1989,"第三期",33
    651,"官座岭水电站由水斗式改斜击式机组技术分析及经济效果",,,,,,,"李佩华",,1989,"第三期",33
    652,"常梁山水电站虹吸真空控制系统总结",,,,,,,"朱建和",,1989,"第三期",33
    653,"提高水轮机稳定性的几点措施",,,,,,,"田锋社",,1989,"第四期",34
    654,"对新的汽蚀破坏强度理论数学模型的研究",,,,,,,"张开贵",,1989,"第四期",34
    655,"水轮机的水力损失计算",,,,,,,"刘小兵",,1989,"第四期",34
    656,"中日水轮机牌号对照",,,,,,,"彭泽元",,1989,"第四期",34
    657,"顺水河与小楔头电站机型选择及试运行",,,,,,,"胡思月",,1989,"第四期",34
    658,"冲击水斗式水轮机流量与转速的简易计算",,,,,,,"刘辉",,1989,"第四期",34
    659,"混流式水轮机的若干技术问题",,,,,,,"叶承农译",,1989,"第四期",34
    660,"混流式水轮机在部分负荷时的动态特性",,,,,,,"寿梅华译",,1989,"第四期",34
    661,"高水头水轮机的优化调节",,,,,,,"喻忻 张强译",,1989,"第四期",34
    662,"筒形阀的发展近况",,,,,,,"高峰 赵伟译",,1989,"第四期",34
    663,"通用水泵的全扬程和流量简易测定法",,,,,,,"邓隐北译",,1989,"第四期",34
    664,"龙羊峡水轮机设计试验工作总结",,,,,,,"田树棠",,1989,"第五期",35
    665,"马迹塘水电厂水力机械设计中若干技术问题",,,,,,,"冯衍祥",,1989,"第五期",35
    666,"翼型局部缺陷对空化和汽蚀的影响",,,,,,,"程则久 周先进",,1989,"第五期",35
    667,"水力自闭蝶阀的现场试验",,,,,,,"闵凤宾 张向明",,1989,"第五期",35
    668,"水轮机设计的发展",,,,,,,"王立强 田子勤 赵春明译",,1989,"第五期",35
    669,"低水头机组孤立运行频率控制",,,,,,,"寿梅华译",,1989,"第五期",35
    670,"伊泰普水电工程设计结构特点(水轮机模型试验部分)",,,,,,,"王钟兰译",,1989,"第五期",35
    671,"研究水电站调压室过渡过程数学模型的发展",,,,,,,"张莉云译",,1989,"第五期",35
    672,"漫湾水电站水轮机模型验收试验",,,,,,,"孙殿湖",,1989,"第六期",36
    673,"水电站复杂引水系统水力共振频率的计算",,,,,,,"张绍春",,1989,"第六期",36
    674,"马骝滩灯泡贯流式水轮发电机组受力分析与整体结构布置设计",,,,,,,"杨德林",,1989,"第六期",36
    675,"竖井贯流式机组在幸福洋试验潮汐电站的应用",,,,,,,"乐汉卿 彭逢如",,1989,"第六期",36
    676,"葛洲坝大江电站25MPa压缩空气系统设计及试验",,,,,,,"黄孟星",,1989,"第六期",36
    677,"隔河岩水电厂消防工程设计",,,,,,,"周云章",,1989,"第六期",36
    678,"冲击式水轮机效率预测",,,,,,,"寿梅华译",,1989,"第六期",36
    679,"哈尔科夫水轮机厂水轮机试验室",,,,,,,"赵春明译",,1989,"第六期",36
    680,"水轮机,水泵水轮机的最新动向",,,,,,,"张富钦译",,1989,"第六期",36
    681,"从直孔和喀什二级电站的调保计算谈调压室的设置准则",,,,,,,"刘保华 刘家琳",,1990,"第一期",37
    682,"混流式水轮机尾水管压力脉动验收考核有关问题的探讨",,,,,,,"田锋社",,1990,"第一期",37
    683,"葛洲坝20号水轮机防腐蚀材料现场试验",,,,,,,"顾四行",,1990,"第一期",37
    684,"葛洲坝大江电厂500KV变压器油的现场处里及质量指标",,,,,,,"宋木仿 熊腾晖",,1990,"第一期",37
    685,"水轮发电机组制动耗气量估算公式",,,,,,,"王晋平",,1990,"第一期",37
    686,"葛洲坝电厂水力机械运行中若干问题",,,,,,,"林太举",,1990,"第一期",37
    687,"马迹塘灯泡贯流式机组的运行",,,,,,,"冯衍祥",,1990,"第一期",37
    688,"苏联国家标准гOCT27528——87转桨式,混流式水轮机型号,基本参数",,,,,,,"吴培豪译",,1990,"第一期",37
    689,"苏联国家标准гOCT27528——88立轴水轮机技术要求与试运行",,,,,,,"吴培豪译",,1990,"第一期",37
    690,"苏联水电设备的更新改造工作",,,,,,,"童建栋译",,1990,"第一期",37
    691,"混流式水轮机中的闭腔效应",,,,,,,"王暖春译",,1990,"第一期",37
    692,"岷江紫坪铺水电站水轮机参数选择分析",,,,,,,"孙宝辉",,1990,"第二期",38
    693,"关于新安江妹滩水电站机型选择的几点意见",,,,,,,"黄兆冀",,1990,"第二期",38
    694,"用声学发确定模型水轮机的安全运行范围",,,,,,,"陆力",,1990,"第二期",38
    695,"贯流式水轮机水力损失的研究",,,,,,,"陈新方 季盛林 兰天辉",,1990,"第二期",38
    696,"鲁布革水电站4号水轮机热力学效率试验报告",,,,,,,"徐正镐译",,1990,"第二期",38
    697,"一种新型的水轮发电机导轴承润滑油冷却方式",,,,,,,"蒋菊平编译",,1990,"第二期",38
    698,"大型混流式水轮机设计和制造",,,,,,,"周跃武译",,1990,"第二期",38
    699,"大化水电站水轮机叶片卡阻原因处理探讨",,,,,,,"林太举",,1990,"第二期",38
    700,"八盘峡瑞典水轮机结构工艺特点简介",,,,,,,"田树棠",,1990,"第三期",39
    701,"竖井贯流式机组",,,,,,,"宋盛义",,1990,"第三期",39
    702,"无活动导叶轴伸转桨贯流式水轮机试验研究",,,,,,,"肖琬元",,1990,"第三期",39
    703,"尾水管设计方法的探讨",,,,,,,"徐天茂",,1990,"第三期",39
    704,"转桨式水轮机的桨叶密封漏油处理",,,,,,,"谢佩遵",,1990,"第三期",39
    705,"卧式混流式水轮机尾水管中振动与噪音的消除",,,,,,,"刘辉",,1990,"第三期",39
    706,"紫荆关四级水电站虹吸式进水口调试总结",,,,,,,"马述江",,1990,"第三期",39
    707,"关于水电站水力机械选型专家系统的探讨",,,,,,,"周吉胜 郑莉媛 彭文生",,1990,"第三期",39
    708,"轴流转桨式与轴流定桨式水轮机的安装高程",,,,,,,"廖肇兴译 高颖校",,1990,"第三期",39
    709,"用准三元理论解决水电站汽蚀问题",,,,,,,"朱钦立译 张强校",,1990,"第三期",39
    710,"印度的水电开发",,,,,,,"刘怀金译本刊编辑部校",,1990,"第三期",39
    711,"论宝珠寺电站水轮机安装高程选定的合理性",,,,,,,"王华彬",,1990,"第四期",40
    712,"水轮发电机组的藏油自冷式导轴承",,,,,,,"蒋菊平",,1990,"第四期",40
    713,"高精度流量测试及率定方法的研究",,,,,,,"徐洪泉 于纪幸",,1990,"第四期",40
    714,"技术供水系统的双向进水方案简析",,,,,,,"禇镇敏",,1990,"第四期",40
    715,"Jec-215-1983电气学会 电气规格调查会标准规格水轮机与水泵水轮机的尺寸检查标准",,,,,,,"沈祝平译 乐枚校",,1990,"第四期",40
    716,"关于JIS水轮机,水泵水轮机JIS水泵模型试验方法修正方案",,,,,,,"沈祝平译 彭渤校",,1990,"第四期",40
    717,"初论转桨式水轮机更新改造的必要性及具体措施",,,,,,,"田锋社",,1990,"第五期",41
    718,"蜗壳与钢筋混凝土的联合受力",,,,,,,"王华彬",,1990,"第五期",41
    719,"青滩子抽水蓄能电站水力机械设计",,,,,,,"李涛",,1990,"第五期",41
    720,"中比速混流式水轮机调速器参数最优整定",,,,,,,"王晋平",,1990,"第五期",41
    721,"轴流转桨水轮机主轴密封新结构探讨",,,,,,,"章光伟",,1990,"第五期",41
    722,"HL-160-WJ-60型水轮机主轴密封改造",,,,,,,"谢兴红",,1990,"第五期",41
    723,"关于水泵泥沙磨损的探讨",,,,,,,"于长辉 王丽华",,1990,"第五期",41
    724,"转桨式水轮机模型汽蚀试验和现场测试的比较及其汽蚀预估",,,,,,,"程光明译 程则久校",,1990,"第五期",41
    725,"水轮机增容:水力和机械因素",,,,,,,"鲍宛中译 周耀武校",,1990,"第五期",41
    726,"应用热动力学法测量水轮机和水泵的效率",,,,,,,"寿梅华译 张强校",,1990,"第五期",41
    727,"运用价值工程优化拉西瓦水轮机设计",,,,,,,"田树棠 杜传忠 马彩萍",,1990,"第六期",42
    728,"ZZ500大型转桨式水轮机泥沙磨损的研究",,,,,,,"葛洲坝水力发电厂",,1990,"第六期",42
    729,"用最优化方法确定水轮机导叶两段关闭",,,,,,,"张邵春",,1990,"第六期",42
    730,"水轮机比速系数及其他",,,,,,,"杨曼",,1990,"第六期",42
    731,"关于芰南电站以及我省小水电增容改造的探讨",,,,,,,"何大信 郭饶鑫",,1990,"第六期",42
    732,"轴伸贯流式水轮机的主要特点及其结构",,,,,,,"汤毅强",,1990,"第六期",42
    733,"热管用于水轮发电机组冷却初探",,,,,,,"赵锁明",,1990,"第六期",42
    734,"关于在受油器体上增设内,外腔操作油管连通管的建议",,,,,,,"王惠文",,1990,"第六期",42
    735,"超低水头大型灯泡式贯流式水轮机的汽蚀特性",,,,,,,"王建华 李忠全译 江会福校",,1990,"第六期",42
    736,"ASTRO水力机械通用试验台简介",,,,,,,"邵保安",,1990,"第六期",42
    737,"宝珠寺水电站水轮机机型的优化选择",,,,,,,"王华彬",,1991,"第一期",43
    738,"高水头混流式水轮机参数选择和设计——渔子溪电站工程实践回顾",,,,,,,"王福源 蔡碧恒",,1991,"第一期",43
    739,"南盘江天生桥二级电站主机招标价格分析",,,,,,,"郭恒春",,1991,"第一期",43
    740,"高水头贯流式水轮机转轮的试验研究分析",,,,,,,"彭维明",,1991,"第一期",43
    741,"9.0MPa容积1m3贮气罐的设计",,,,,,,"杨曼",,1991,"第一期",43
    742,"混流式水轮机的安装高程",,,,,,,"廖肇兴译 高颖校",,1991,"第一期",43
    743,"计算机水轮机转速的一种新方法",,,,,,,"狄国强 方崇译 沈祖译校",,1991,"第一期",43
    744,"塔倍拉第三期扩建工程机组与引水系统设计特点",,,,,,,"王宪平译 周耀武校",,1991,"第一期",43
    745,"草林冲电站1#机组摆度增大原因初步分析",,,,,,,"曾游生",,1991,"第一期",43
    746,"简谈我国水轮机技术的发展及行业管理中的几个问题——(在全国水机械情报网大会上的发言摘录)",,,,,,,"刘书秋",,1991,"第二期",44
    747,"周宁水电站可行性研究高水头水轮机参数的选择",,,,,,,"林金川",,1991,"第二期",44
    748,"遥田水电站水轮机的选型问题",,,,,,,"周正祥",,1991,"第二期",44
    749,"国外对中高水头电站水轮机选择及一些设计方法",,,,,,,"朱星 徐正镐",,1991,"第二期",44
    750,"水轮机能量特性曲线的计算机辅助设计",,,,,,,"杨惠美",,1991,"第二期",44
    751,"SALINA电站水泵——水轮机的检修",,,,,,,"江晓明 彭宽平译 张强校",,1991,"第二期",44
    752,"在正吸出高度条件下运行的轴流转浆式水轮机的研究",,,,,,,"洪嘉谋译 蒋菊平校",,1991,"第二期",44
    753,"表面保护层 技术",,,,,,,"李国梁译 王宪平校",,1991,"第二期",44
    754,"小型水轮机设计分析",,,,,,,"童建栋,王勇译 陆力校",,1991,"第二期",44
    755,"灯泡贯流式水轮机的参数选择",,,,,,,"佟文敏",,1991,"第三期",45
    756,"羊卓雍湖工程抽水蓄能机组选择及运行方式研究",,,,,,,"李国梁",,1991,"第三期",45
    757,"模糊加权线性变换选择机型",,,,,,,"狄国强 刘艳",,1991,"第三期",45
    758,"龙羊峡水轮机气蚀很轻给予我们的启示",,,,,,,"程则久",,1991,"第三期",45
    759,"轴流式水泵的"抬机"问题初探",,,,,,,"陈菜洲",,1991,"第三期",45
    760,"浅谈水轮机转轮静平衡中的摩擦系数",,,,,,,"敖建平",,1991,"第三期",45
    761,"水轮机结构设计中可靠性问题的探讨",,,,,,,"杨名刚 朱彬",,1991,"第三期",45
    762,"蜗壳测流计算与率定",,,,,,,"杨曼",,1991,"第三期",45
    763,"浅析石门水电站2#机调相压水失败的原因",,,,,,,"樊立民",,1991,"第三期",45
    764,"水轮机顶盖漏水和排水系统的运行",,,,,,,"林太举",,1991,"第三期",45
    765,"法兰西斯式水泵水轮机模型运行特性的理论与实验分析",,,,,,,"常近时译",,1991,"第三期",45
    766,"灯泡贯流式水轮机参数诺模图",,,,,,,"佟文敏",,1991,"第四期",46
    767,"西河水电站高水头混流式水轮机的研究",,,,,,,"胡思月",,1991,"第四期",46
    768,"关于锁金山水斗式水轮机优化选择的几个问题",,,,,,,"黄兆骥",,1991,"第四期",46
    769,"水轮机调节系统动态过程按环节离散化的数字仿真方法",,,,,,,"王晋平",,1991,"第四期",46
    770,"关于伸缩节采用波纹管止漏方式的研究",,,,,,,"刘飞旗",,1991,"第四期",46
    771,"灯泡式水轮机的比尺效应",,,,,,,"吴世勇 沙文彬译",,1991,"第四期",46
    772,"苏联对宽水头范围的大型水轮机的设计",,,,,,,"赵春明译",,1991,"第四期",46
    773,"水轮机的气蚀损伤",,,,,,,"彭泽元译",,1991,"第四期",46
    774,"日本最新的双击式水轮机",,,,,,,"林焕森译",,1991,"第四期",46
    775,"800KW水轮机发电机组氟塑料推力瓦通过鉴定",,,,,,,"顾四行",,1991,"第四期",46
    776,"恢复龙羊峡水电站#5机的优化设计",,,,,,,"田树棠 刘慧凤",,1991,"第五期",47
    777,"冶勒水电站水轮机参数的初步选择",,,,,,,"徐甜甜",,1991,"第五期",47
    778,"天湖水电站高水头水轮机选择设计",,,,,,,"滕文炳",,1991,"第五期",47
    779,"依萨河二级水电站的机型选择",,,,,,,"武赛波",,1991,"第五期",47
    780,"福建省高水头水电站水轮机简介",,,,,,,"叶世鼎",,1991,"第五期",47
    781,"万家寨引黄入晋工程挟沙水流",,,,,,,"张士杰",,1991,"第五期",47
    782,"应用灰色建模的方法建立水轮机动态经验公式",,,,,,,"赵林明",,1991,"第五期",47
    783,"混流式水轮机气蚀特性的研究",,,,,,,"张富钦译",,1991,"第五期",47
    784,"计算水轮机转速的新方法",,,,,,,"本刊编辑部译",,1991,"第五期",47
    785,"关于水电厂内渗漏排水系统设计有关问题",,,,,,,"黄立昊",,1991,"第六期",48
    786,"八盘峡蜂窝式斜管沉淀池设计与运行",,,,,,,"田树棠",,1991,"第六期",48
    787,"中小型水电站技术改造的实践与认识",,,,,,,"朱彬 杨名刚 姚仲生",,1991,"第六期",48
    788,"水轮机水力差压活塞式端面密封的应用改进",,,,,,,"汤毅强",,1991,"第六期",48
    789,"新型高铬铸铁在水轮机摩擦付面上的应用",,,,,,,"林世雄 张恭辅",,1991,"第六期",48
    790,"大型泵站水泵-水轮机的变速特性",,,,,,,"张仁田 姚林碧",,1991,"第六期",48
    791,"博湖抽水站轴流泵机组的过渡过程",,,,,,,"邹宪恩",,1991,"第六期",48
    792,"水电机械设备采购规范的改进",,,,,,,"华键译",,1991,"第六期",48
    793,"水利机械损失的估算",,,,,,,"敖建平 林昌杰译",,1991,"第六期",48
    794,"澳大利亚的最大水电站事故",,,,,,,"吴秀云译",,1991,"第六期",48
    795,"有关水力机械的五点建议",,,,,,,"鲍宛中译",,1991,"第六期",48
    796,"云,贵响水水电站水轮机选型论证",,,,,,,"王子健",,1992,"第一期",49
    797,"四川省马回水电站前置灯泡贯流式机组介绍",,,,,,,"李涛",,1992,"第一期",49
    798,"关于冲击式水轮机用模型综合特性曲线选型",,,,,,,"许荣贵",,1992,"第一期",49
    799,"清江隔河岩水轮机模型复核验收试验",,,,,,,"黄源芳 孟敏 申昌明",,1992,"第一期",49
    800,"浑水水泵试验台微机测试系统",,,,,,,"雷三省",,1992,"第一期",49
    801,"中型微机调速器的直连型机械液压系统及分段关闭装置",,,,,,,"周泰经 徐有声 陈杏君 林昌",,1992,"第一期",49
    802,"建瓯玉山电站顶盖技术供水设计与计算",,,,,,,"岳兆智 杨名刚",,1992,"第一期",49
    803,"小水电站不同特性机组间负荷分配",,,,,,,"朱建和",,1992,"第一期",49
    804,"莫斯科运河萨特金斯水电站水力机组圆盘式推力轴承的改造",,,,,,,"阎磊译",,1992,"第一期",49
    805,"混流式水轮机在部分负荷下的运行",,,,,,,"张力天译",,1992,"第一期",49
    806,"大型水轮机选择多目标模糊优化方法",,,,,,,"田树棠",,1992,"第二期",50
    807,"双向贯流式与单向贯流式水轮机水力特性对比试验研究",,,,,,,"蔡付林",,1992,"第二期",50
    808,"贯流混流式水轮机的水力设计研究",,,,,,,"宋文武",,1992,"第二期",50
    809,"东圳水电站增容后两段关闭装置和微机调速器的试验研究",,,,,,,"乐汉卿",,1992,"第二期",50
    810,"水电站阀门选择中需注意的若干问题",,,,,,,"闵凤宾",,1992,"第二期",50
    811,"推力轴承高压油顶起装置",,,,,,,"殷龙生",,1992,"第二期",50
    812,"乌江渡水轮发电机组的完善化工作",,,,,,,"王国平",,1992,"第二期",50
    813,"水轮机和水泵性能换算法日本机械学会标准JSME S008-1989(正文部分,附录A)",,,,,,,"石清华译 吴茂瑶校",,1992,"第二期",50
    814,"水力机械转轮三元流动理论与分析方法的发展",,,,,,,"康长寿",,1992,"第三期",51
    815,"超声波测流装置与微机差压测流装置试验研究",,,,,,,"范华秀",,1992,"第三期",51
    816,"天湖水电站水轮发电机组GD2的确定",,,,,,,"张冬",,1992,"第三期",51
    817,"马迹塘水电厂压缩空气系统简介",,,,,,,"冯衍祥",,1992,"第三期",51
    818,"水轮发电机组液压控制设备的新发展",,,,,,,"孙定茂",,1992,"第三期",51
    819,"空气围带及围带模的设计",,,,,,,"陈士勇",,1992,"第三期",51
    820,"轴流泵出口环量变化规律与几何参数一体化最优设计方法",,,,,,,"陈林根",,1992,"第三期",51
    821,"关于轴流式水泵的"抬机"问题",,,,,,,"胡自牧",,1992,"第三期",51
    822,"承德六道河水电站谁能计算与装机方案的确定",,,,,,,"李佩华",,1992,"第三期",51
    823,"日本机械学会标准水轮机和水泵性能换算法(JSME S008-1989)(附录B~附录D)",,,,,,,"石清华译 吴茂瑶校",,1992,"第三期",51
    824,"灯泡贯流式机组参数筛选方法探讨",,,,,,,"游赞培 ",,1992,"第四期",52
    825,"黄河小峡水电站灯泡机组选择与评判",,,,,,,"田树棠",,1992,"第四期",52
    826,"小浪底水电站水轮机泥沙磨蚀破坏评估",,,,,,,"刘继澄",,1992,"第四期",52
    827,"灯泡式贯流机的发展",,,,,,,"陈菜洲 杜善秀",,1992,"第四期",52
    828,"妹滩电站——轴伸贯流式水轮机设计特点",,,,,,,"李玉华",,1992,"第四期",52
    829,"岩滩水电站水轮机1号转轮几何形状及尺寸检测验收",,,,,,,"于纪幸 常洪启",,1992,"第四期",52
    830,"PO45/820转轮模型验收试验简介",,,,,,,"王日平",,1992,"第四期",52
    831,"混流式水轮机模型转轮进,出口角度准确检查",,,,,,,"赵春明 ",,1992,"第四期",52
    832,"岩滩水电站大件运输的回顾",,,,,,,"谭本裕",,1992,"第四期",52
    833,"用"热力干燥"法向油压装置供气的得失",,,,,,,"田迅",,1992,"第四期",52
    834,"虹吸式进水口水电站不设机前进水阀条件的探讨",,,,,,,"张法思 ",,1992,"第四期",52
    835,"混流式水轮机的气蚀特性",,,,,,,"张强译 彭渤校",,1992,"第四期",52
    836,"构皮滩水电站可行性研究阶段水轮机选型设计",,,,,,,"余明新",,1992,"第五期",53
    837,"500MW级混流式水轮发电机组国内外水平综述",,,,,,,"刘满宏",,1992,"第五期",53
    838,"关于小浪底水电站吸出高度选择的意见",,,,,,,"程则久",,1992,"第五期",53
    839,"水力机械设计中值得注意的几个问题",,,,,,,"李国梁",,1992,"第五期",53
    840,"安居水电站灯泡贯流式机组的基本情况",,,,,,,"佟文敏",,1992,"第五期",53
    841,"潘家口水电站抽水蓄能机组自动检测与飞逸保护",,,,,,,"龚长年",,1992,"第五期",53
    842,"水力机械浑水试验中若干测试问题的研究",,,,,,,"徐洪泉 ",,1992,"第五期",53
    843,"葛洲坝转浆式水轮机的气蚀和泥沙磨损",,,,,,,"林太举",,1992,"第五期",53
    844,"灯泡式贯流式机组导轴承高压油顶起装置",,,,,,,"冯衍祥",,1992,"第五期",53
    845,"陈村水电站导水叶漏水分析及立面密封改进",,,,,,,"刘锦章",,1992,"第五期",53
    846,"CT-40型调速器故障分析及处理",,,,,,,"李进分",,1992,"第五期",53
    847,"日本水轮机,水泵水轮机的气蚀,磨损和腐蚀的调查报告(摘要)",,,,,,,"彭锡谦译 程则久校",,1992,"第五期",53
    848,"双击式水轮机的两个阶段的功率输出",,,,,,,"程光明译 本刊编辑部校",,1992,"第五期",53
    849,"武强溪水电站机组采购招标工作的问题",,,,,,,"彭渤",,1992,"第六期",54
    850,"弹性金属塑料推力轴瓦在我国大型水电机组上的应用",,,,,,,"林焕森 ",,1992,"第六期",54
    851,"贵州观音岩电站梳齿迷宫磨损事故原因探讨",,,,,,,"王子建 刘豫生",,1992,"第六期",54
    852,"艾坝水电站轴伸贯流式机组运行概况",,,,,,,"黄智贤",,1992,"第六期",54
    853,"有关小型水轮机选型设计的若干问题",,,,,,,"寿梅华",,1992,"第六期",54
    854,"多泥沙河流自动量测设备的设计选择",,,,,,,"李光勉",,1992,"第六期",54
    855,"进口低碳调质高强钢匹配国产焊条在大型水轮机上的应用研究",,,,,,,"漆卫国",,1992,"第六期",54
    856,"浑水模型水轮机初生空化测定的探讨",,,,,,,"陆力 王海安",,1992,"第六期",54
    857,"DL446-91《水轮机模型验收试验规程》编制经过,内容及编制说明简介",,,,,,,"王钟兰",,1992,"第六期",54
    858,"大峡水电站轴流式模型试验通过验收",,,,,,,"王日平",,1992,"第六期",54
    859,"对含沙水流中,高扬程离心泵转轮出口流速及流速角β2的计算方法探讨",,,,,,,"张世杰",,1992,"第六期",54
    860,"在水电站设计阶段水轮机泥沙磨损的预测",,,,,,,"王暖春译",,1992,"第六期",54
    861,"热力法确定水轮机效率",,,,,,,"吴秀云译",,1992,"第六期",54
    862,"水电机组参数,性能,结构等技术条件在招标文件中的处理方法及其对招标的影响",,,,,,,"能源部鲁布革工程管理局机电处",,1993,"第一期",55
    863,"从岩滩电站计算机监控系统国际招标谈现代水电厂自动化监控的模式",,,,,,,"吴家林 ",,1993,"第一期",55
    864,"王甫洲水电站灯泡贯流机组外商技术谈判回顾",,,,,,,"余明新",,1993,"第一期",55
    865,"灯泡贯流式水轮机尾水管的选择",,,,,,,"游赞培",,1993,"第一期",55
    866,"灯泡贯流式水轮机转轮水体液柱转动惯量",,,,,,,"佟文敏",,1993,"第一期",55
    867,"贯流机组导水机构安装和调试",,,,,,,"孙定茂",,1993,"第一期",55
    868,"定桨式水轮机的技术特性与选择",,,,,,,"田树棠",,1993,"第一期",55
    869,"东江水电厂水轮发电机转子制动环的运行经验",,,,,,,"林焕森",,1993,"第一期",55
    870,"多沙河流小水轮机技术改造设计",,,,,,,"顾四行 王盛义",,1993,"第一期",55
    871,"渐变管道的LV值计算",,,,,,,"朱建和",,1993,"第一期",55
    872,"中小水电设备的技术动态",,,,,,,"彭泽元译 吴晓光校",,1993,"第一期",55
    873,"水电机组国际招标采购和国内外厂商合作生产方式的探讨",,,,,,,"鲁布革工程管理局机电处",,1993,"第二期",56
    874,"从白石窑水电站机组议标看水电机组设备采购体制改革",,,,,,,"游赞培",,1993,"第二期",56
    875,"天生桥二级坝索电站水轮发电机组国际招标简介",,,,,,,"宁福海",,1993,"第二期",56
    876,"三峡工程论证简介",,,,,,,"黄孟星",,1993,"第二期",56
    877,"广州抽水蓄能电站水利机械设计简介",,,,,,,"广东省水电勘测设计院",,1993,"第二期",56
    878,"水轮机尾水管内的流动模拟和流动计算",,,,,,,"刘小兵",,1993,"第二期",56
    879,"水电站自动化元件简介",,,,,,,"黄景湖",,1993,"第二期",56
    880,"灯泡贯流式机组轴承油系统设计",,,,,,,"孙定茂",,1993,"第二期",56
    881,"Kaplan水机涌浪控制",,,,,,,"彭渤译 张强校",,1993,"第二期",56
    882,"直岗拉卡水电站灯泡机组选择与运行性能分析",,,,,,,"田树棠",,1993,"第三期",57
    883,"江垭水利枢纽初设阶段水轮机的选型",,,,,,,"黄少华",,1993,"第三期",57
    884,"水电机组流量效率微机检测装置研制",,,,,,,"范华秀 刘金生 徐汉柯 吴长胜",,1993,"第三期",57
    885,"计算机测试技术在水利机械模型试验中的应用",,,,,,,"徐洪泉",,1993,"第三期",57
    886,"太平湾水电站空压机选择,布置及其减振基础设计",,,,,,,"白广仁",,1993,"第三期",57
    887,"漫湾工程不锈钢分瓣转轮工地组焊的若干技术措施",,,,,,,"漆卫国",,1993,"第三期",57
    888,"大型水轮机座环分半面焊缝应力分析",,,,,,,"刘扬 刘飞旗",,1993,"第三期",57
    889,"长潭水电厂转轮迷宫环严重磨损事故分析",,,,,,,"甄华铎",,1993,"第三期",57
    890,"几个抽水蓄能电站简介",,,,,,,"刘书秋",,1993,"第三期",57
    891,"日本Tadami电站贯流式水轮机",,,,,,,"彭渤摘译",,1993,"第三期",57
    892,"三峡电站机组容量可行性选择研究",,,,,,,"刘尊祥",,1993,"第四期",58
    893,"依萨河二级水电站机组结构特点简介",,,,,,,"武赛波",,1993,"第四期",58
    894,"水电站主厂房内桥式起重机的选择",,,,,,,"黄立昊",,1993,"第四期",58
    895,"大中型水电站集水井排淤问题探讨",,,,,,,"沙文彬",,1993,"第四期",58
    896,"三门峡电站机组改造与非汛期弃水问题",,,,,,,"刘家麟",,1993,"第四期",58
    897,"大型轴流泵肘形进水流道CAD研究",,,,,,,"刘光临 刘贵有",,1993,"第四期",58
    898,"水电站虹吸式进水口的控制",,,,,,,"马述江",,1993,"第四期",58
    899,"HL150-LJ-450型水轮机座环安装中水平度的控制研究",,,,,,,"胡鹏程",,1993,"第四期",58
    900,"用系统工程理论研究水电机组大修工序",,,,,,,"王国平",,1993,"第四期",58
    901,"八盘峡水电站扩机工程机组机型选择",,,,,,,"田树棠",,1993,"第五期",59
    902,"广蓄电站水泵水轮机主要特性及结构",,,,,,,"何银芝",,1993,"第五期",59
    903,"水轮泵优化选型及运行特性研究",,,,,,,"刘光临 蒋劲 丘传忻 陈家瑞",,1993,"第五期",59
    904,"瀑布沟水电站长尾水系统不同设计方案的水力过渡过程计算",,,,,,,"刘保华",,1993,"第五期",59
    905,"万家寨引黄工程大型高扬程耐磨蚀离心泵水力模型的试验研究",,,,,,,"沈宗伊 张成冠 张泽太 张世杰",,1993,"第五期",59
    906,"调速器数字协联关系表的设计计算",,,,,,,"邓东",,1993,"第五期",59
    907,"水流量标准装置切向器的设计及误差计算",,,,,,,"王丽 沈祝平",,1993,"第五期",59
    908,"马骝滩水电站导轴承座与大轴咬死原因浅析",,,,,,,"李永锋",,1993,"第五期",59
    909,"石门2号机组推力轴承弹性金属塑料瓦试运行总结和分析",,,,,,,"徐培林 陈述平 樊立民 陈善友",,1993,"第五期",59
    910,"水轮机顶盖底环导叶孔不同轴的分析和现场处理",,,,,,,"余海潮 藏樵",,1993,"第五期",59
    911,"一种能取消盘车工序的推力轴承",,,,,,,"隆昌祝 刘庆生 丁仁义 隆振刚",,1993,"第五期",59
    912,"压油装置中间油罐的容积和补气方式的选优探讨",,,,,,,"王国平",,1993,"第五期",59
    913,"国内外泵及泵站简况",,,,,,,"许慕松",,1993,"第六期",60
    914,"内蒙古黄河河套灌区总排干圪卜排水站水泵选型",,,,,,,"陈忠汉",,1993,"第六期",60
    915,"低扬程大型泵站泵型与布置型式的选择",,,,,,,"张仁田 ",,1993,"第六期",60
    916,"太浦河泵站主泵选型设计",,,,,,,"黄毅 胡德义",,1993,"第六期",60
    917,"东江——深圳供水工程四座泵站设计体会",,,,,,,"翁耿光",,1993,"第六期",60
    918,"宁夏扬黄提灌工程机泵选型设计若干问题的探讨",,,,,,,"光荣 王本忠",,1993,"第六期",60
    919,"低扬程立式开敞轴流泵装置的研究开发及泵站技术改造",,,,,,,"堵金元",,1993,"第六期",60
    920,"羊卓雍湖抽水蓄能电站蓄能泵简介",,,,,,,"何莘伯",,1993,"第六期",60
    921,"黄河水浪底电站排水系统设计及泵的选择",,,,,,,"孟桂先",,1993,"第六期",60
    922,"水泵抗磨蚀措施的探讨",,,,,,,"龙巽德 杨泉",,1993,"第六期",60
    923,"水利水电水利机械情报网更名通知",,,,,,,,,1993,"第六期",60
    924,"大型轴流泵的空蚀与安装高程",,,,,,,"卜问之",,1993,"第六期",60
    925,"天津桃花寺水泵-水轮机可行性分析",,,,,,,"高道扬",,1994,"第一期",61
    926,"灯泡贯流式水轮机初步设计中几个问题的探讨",,,,,,,"任美尧",,1994,"第一期",61
    927,"论比速系数",,,,,,,"吴次光",,1994,"第一期",61
    928,"广西合面狮水电厂机组效率测试",,,,,,,"宋盛义 徐伟 熊杰",,1994,"第一期",61
    929,"关于水力机组测振仪性能的研讨",,,,,,,"罗铭辉",,1994,"第一期",61
    930,"与"计算机测试技术在水力机械模型试验中的应用"一文作者商榷",,,,,,,"赵光庭",,1994,"第一期",61
    931,"东江口泵站现场试验的抬机情况总结",,,,,,,"刘汉华 蒋文保",,1994,"第一期",61
    932,"非金属抗磨蚀涂层在黄河泵站的保护效果",,,,,,,"王志高",,1994,"第一期",61
    933,"湖南岩汪湖等电排站轴流泵振动问题剖析",,,,,,,"陈菜洲",,1994,"第一期",61
    934,"水口水电站1#机主轴密封的改进",,,,,,,"严丽",,1994,"第一期",61
    935,"苏联《发电厂与电力网技术管理法则》",,,,,,,"王春暖译",,1994,"第一期",61
    936,"水轮机空蚀的检修质量及其对水电站技术经济指标的影响",,,,,,,"吴秀云译",,1994,"第一期",61
    937,"国际电工委员会水轮机专委会一九九三年东京全会情况介绍",,,,,,,"乐枚",,1994,"第二期",62
    938,"论提高含沙水流高扬程离心泵通流部件设计加工质量的必要性和迫切性",,,,,,,"张士杰",,1994,"第二期",62
    939,"从埃及萨拉姆1号水泵站谈斜式轴流泵的应用",,,,,,,"王晋平",,1994,"第二期",62
    940,"泵和泵站中量和单位及其换算关系",,,,,,,"刘光临",,1994,"第二期",62
    941,"水轮机可靠性及其优化途径",,,,,,,"田树棠",,1994,"第二期",62
    942,"中低水头混流式抽水蓄能机组设置蝴蝶阀的探讨",,,,,,,"高道扬",,1994,"第二期",62
    943,"复杂岔管系统水锤计算的新方法",,,,,,,"王国平 ",,1994,"第二期",62
    944,"矶头水电站水轮机改型的探讨",,,,,,,"陈勇",,1994,"第二期",62
    945,"全贯流式水轮机滚动轴承研究",,,,,,,"林昌杰",,1994,"第二期",62
    946,"大容量超高水头水泵水轮机的应用",,,,,,,"郭勤译",,1994,"第二期",62
    947,"扩大水轮发电机组无水冷却的应用范围",,,,,,,"彭泽元译",,1994,"第二期",62
    948,"论黄河万家寨水利枢纽电站机组参数的优化",,,,,,,"孙秀芳",,1994,"第三期",63
    949,"青石山水电站机型选择",,,,,,,"田树棠",,1994,"第三期",63
    950,"灯泡贯流式水轮机系列模型转轮试验结果分析",,,,,,,"任美尧",,1994,"第三期",63
    951,"压力钢管冲水方案研究",,,,,,,"曲道志",,1994,"第三期",63
    952,"安居灯泡贯流式水轮机的改进",,,,,,,"佟文敏",,1994,"第三期",63
    953,"转浆式水轮机受油器喷油原因及其消除",,,,,,,"刘锦幸",,1994,"第三期",63
    954,"现场浇铸小水电站轴瓦工艺探讨",,,,,,,"吴慎程",,1994,"第三期",63
    955,"水电站无维修技术",,,,,,,"郭勤译",,1994,"第三期",63
    956,"大古力水电站发电机定子设计的改进",,,,,,,"沙文彬译",,1994,"第三期",63
    957,"离心泵的水轮机工况运行",,,,,,,"敖建平 林昌杰译",,1994,"第三期",63
    958,"维多利亚州电力委员会对Dartmouth水电站灾难性事故要求赔偿",,,,,,,"吴秀云译",,1994,"第三期",63
    959,"三门峡水电站扩机工程混流式准论特点",,,,,,,"王日平",,1994,"第四期",64
    960,"高砂水电站水力机械设计简介",,,,,,,"李玉华",,1994,"第四期",64
    961,"全贯流水轮发电机组的电站布置",,,,,,,"林昌杰",,1994,"第四期",64
    962,"岩滩机组水轮机效率试验",,,,,,,"郭江 刘万景 孙鸿秉 梁宗勇",,1994,"第四期",64
    963,"龙羊峡水电厂2号机效率测试与分析",,,,,,,"孙爱",,1994,"第四期",64
    964,"锻压叶片混流式转轮抗磨蚀性能试验研究",,,,,,,"闵占奎 白绍林",,1994,"第四期",64
    965,"不同型式双向泵(站)模型装置性能分析",,,,,,,"张仁田",,1994,"第四期",64
    966,"大型轴流泵站停泵水锤的调压塔防护研究",,,,,,,"刘光临 蒋劲 骆辛磊 徐建求",,1994,"第四期",64
    967,"WST-S双微机双重调节调速器在潮汐双向四工况机组上的应用",,,,,,,"黄晓平",,1994,"第四期",64
    968,"水电站气系统设备选择计算几种方法比较",,,,,,,"孙秀芳",,1994,"第四期",64
    969,"广蓄电站渗漏排水系统述评",,,,,,,"胡济民",,1994,"第五期",65
    970,"潘家口水电站抽水蓄能机组上,下游水位及拦污栅压差测量",,,,,,,"董克青",,1994,"第五期",65
    971,"轴流式水轮机上部盖由水泵排水改自流排水方式",,,,,,,"史洪和",,1994,"第五期",65
    972,"解决水轮机转动油盆式轴承低油位发迅问题一种方法",,,,,,,"甄华铎",,1994,"第五期",65
    973,"含沙水流中水轮机临界空蚀系数的试验研究",,,,,,,"黄社华 程则久",,1994,"第五期",65
    974,"计算机数值模拟在水轮机分析中的应用",,,,,,,"于波",,1994,"第五期",65
    975,"关于反击式水轮机的效率换算",,,,,,,"廖资汉",,1994,"第五期",65
    976,"贯流式水轮发电机组调节保证解析计算探讨",,,,,,,"高峰 杨洁春",,1994,"第五期",65
    977,"浅谈水轮机抗空蚀新型材料-耐空蚀喷焊合金粉的研制与应用",,,,,,,"姬萍 肖海生 严晋青",,1994,"第五期",65
    978,"关于"计算机测试技术在水利机械模型试验中的应用"一文的几点说明-兼答赵广庭之商榷",,,,,,,"徐洪泉",,1994,"第五期",65
    979,"广西马骝滩水电站15.5MW灯泡贯流式机组的试运行",,,,,,,"唐新发",,1994,"第五期",65
    980,"亭口泵站机电设计体会",,,,,,,"方源",,1994,"第五期",65
    981,"ACEC低水头中小型水电站全贯流式水轮发电机组",,,,,,,"刘晓鹰编译",,1994,"第五期",65
    982,"空蚀造成的水轮机转轮金属损失的确定",,,,,,,"朱彬 冯志安译",,1994,"第五期",65
    983,"日本水电设备维护的现代化简述",,,,,,,"本刊通讯员",,1994,"第五期",65
    984,"三峡水电站水轮机主要技术参数的选择分析",,,,,,,"熊腾晖 刘景旺 田子勤",,1994,"第六期",66
    985,"向家坝电站水轮机参数选择及其模型开发",,,,,,,"朱耀泉 李际清 万端阳",,1994,"第六期",66
    986,"寸塘口抽水蓄能电站水利机械设计及经验",,,,,,,"何莘伯",,1994,"第六期",66
    987,"潘家口抽水蓄能电站水泵",,,,,,,"蔡体安 刘健 龚长年 董克清",,1994,"第六期",66
    988,"大七孔水电站立轴高转速机组的型式选择及其参数确定",,,,,,,"丁继茂",,1994,"第六期",66
    989,"渔子溪二级水电站技术供水系统的设计",,,,,,,"沈菊英",,1994,"第六期",66
    990,"水轮机转轮工地制造技术研究",,,,,,,"李婉芳",,1994,"第六期",66
    991,"黄河万家寨水利枢纽电站的水力模型及性能",,,,,,,"朱耀泉 李际清 万端阳",,1995,"第一期",67
    992,"浅谈尼那,直岗拉卡,康扬三电站的开发",,,,,,,"田树棠",,1995,"第一期",67
    993,"美国马克韦水电站卧轴双混流式水轮发电机组简介",,,,,,,"何凯希",,1995,"第一期",67
    994,"轴流定桨式水轮机采用补气法减轻振动的几个问题",,,,,,,"李宇红",,1995,"第一期",67
    995,"六郎洞电厂换用D06A转轮的可行性分析",,,,,,,"宋文武 杜同 王靖",,1995,"第一期",67
    996,"我国最大的双向流道泵站-安徽省凤凰颈排灌站机组选型",,,,,,,"朱兴华 徐锡珍",,1995,"第一期",67
    997,"混流泵滑移系数计算及叶轮设计",,,,,,,"钱涵欣 陈乃祥 林汝祥 瞿伦富 卜濑和",,1995,"第一期",67
    998,"西泵站水泵增容节能改造技术",,,,,,,"刚新秋 叶春江",,1995,"第一期",67
    999,"灯泡机组辅助设备设计特点综述",,,,,,,"田树棠",,1995,"第二期",68
    1000,"大型灯泡贯流式机组制造技术",,,,,,,"卢卫平",,1995,"第二期",68
    1001,"南水北调东线工程大型低扬程轴伸式轴流泵开发研究综述",,,,,,,"罗洪",,1995,"第二期",68
    1002,"GIGIRI泵站水力机械设计特点",,,,,,,"杨铁荣",,1995,"第二期",68
    1003,"三峡电站水轮机尾水管阶段试验研究",,,,,,,"于波",,1995,"第二期",68
    1004,"减轻尾水管压力脉动实验研究",,,,,,,"王日平",,1995,"第二期",68
    1005,"葛洲坝大江电厂PLC机组Q,W,H,η监测系统",,,,,,,"高武 赵旭光 王学武",,1995,"第二期",68
    1006,"关于水轮机腐蚀磨损",,,,,,,"周正祥译",,1995,"第二期",68
    1007,"岩滩转轮检测验收",,,,,,,"乐枚",,1995,"第二期",68
    1008,"从多瑙河开发谈灯泡机组的厂房优化",,,,,,,"田树棠",,1995,"第三期",69
    1009,"新一代大型水轮机调速器及其选型",,,,,,,"王光生 贾宝良",,1995,"第三期",69
    1010,"正交设计法在高水头水轮机导叶优化关闭规律选择中的应用",,,,,,,"陈绍钢",,1995,"第三期",69
    1011,"刘家峡水电厂2号机组改造增容后水轮机效率与出力保证值分析",,,,,,,"孙爱",,1995,"第三期",69
    1012,"利用转轮内三元流动计算对泵叶轮进行改型设计",,,,,,,"杨伟华",,1995,"第三期",69
    1013,"芦下坝水电站机组增容改造",,,,,,,"陈勇 刘梦强",,1995,"第三期",69
    1014,"斜向导水机构接力器参数确定",,,,,,,"高峰 严秉丁",,1995,"第三期",69
    1015,"水电站的冷却水系统",,,,,,,"刘国清译",,1995,"第三期",69
    1016,"抽水蓄能电站过渡过程研究",,,,,,,"鲍碗中译",,1995,"第三期",69
    1017,"Cabriel Terra 水电站技术改造简介",,,,,,,"刘国清译",,1995,"第三期",69
    1018,"新型组合式减压阀研究",,,,,,,"张强 张锡柱",,1995,"第四期",70
    1019,"轴流泵叶片离心力矩研究测定",,,,,,,"张思青 刘尚智 刘大恺",,1995,"第四期",70
    1020,"F24轴流式水轮机转轮",,,,,,,"熊建平",,1995,"第四期",70
    1021,"GD003-WZ-200轴伸贯流式水轮发电机组效率实测结果分析",,,,,,,"黄智贤",,1995,"第四期",70
    1022,"沉沙池必要性论证的关键问题",,,,,,,"李国梁",,1995,"第四期",70
    1023,"有关反击式水轮机吸出高度合理确定的几个问题",,,,,,,"付国望",,1995,"第四期",70
    1024,"轴流式水轮机导叶两段关闭阀控制回路的改进",,,,,,,"佟文敏",,1995,"第四期",70
    1025,"高凤山电站2#机技术改造",,,,,,,"沈学明",,1995,"第四期",70
    1026,"克鲁松-狄克桑斯电站扩建创世界纪录",,,,,,,"刘国清译",,1995,"第四期",70
    1027,"冲击式水轮机转轮的维护",,,,,,,"刘国清译",,1995,"第四期",70
    1028,"龚嘴水电厂水轮机增容改造新转轮",,,,,,,"邵保安",,1995,"第五期",71
    1029,"转桨式灯泡水轮机的重量估算",,,,,,,"肖厚春",,1995,"第五期",71
    1030,"浅谈轴伸式贯流机组设计的改进及运行中存在的问题",,,,,,,"季奎 张键 杨法玉",,1995,"第五期",71
    1031,"贯流式水轮机协联曲线中非运行区的限制线",,,,,,,"泰建新",,1995,"第五期",71
    1032,"富春江厂水轮机试验研究工作的进展",,,,,,,"赵春明",,1995,"第五期",71
    1033,"微机实现基于B级精度的水泵测试系统",,,,,,,"赵旭光 易钢敏 高武 陈小桥",,1995,"第五期",71
    1034,"微机差压流量监测装置在东江水电站的应用",,,,,,,"赵健全",,1995,"第五期",71
    1035,"大广坝电站水轮机主轴密封改进与调相运行试验",,,,,,,"刘良娟",,1995,"第五期",71
    1036,"电调与微机调机械液压系统比较",,,,,,,"张一国",,1995,"第五期",71
    1037,"抽取海水蓄能发电技术",,,,,,,"郭勤 段瑞明编译",,1995,"第五期",71
    1038,"天生桥一级水电站水轮机选型",,,,,,,"武赛波",,1995,"第六期",72
    1039,"槐扒黄河提水工程一级泵站机型初探",,,,,,,"徐银明",,1995,"第六期",72
    1040,"巴塘噶底斯电站"S"型轴伸贯流式水轮机的设计特点",,,,,,,"杨瑾",,1995,"第六期",72
    1041,"30m水头段轴流式水轮机模型转轮试验结果初步分析",,,,,,,"熊建平",,1995,"第六期",72
    1042,"提高射流泵性能指标是探索",,,,,,,"沈东 王难贵 张思青",,1995,"第六期",72
    1043,"响水涧抽水蓄能电站技术供水系统",,,,,,,"胡建根 蔡锦华",,1995,"第六期",72
    1044,"机电一体化技术在太平驿电站水机自动化的应用",,,,,,,"李国梁",,1995,"第六期",72
    1045,"新安江水电厂水轮发电机组增容改造取得成功",,,,,,,"唐剑",,1995,"第六期",72
    1046,"水电设备制造业的发展动态",,,,,,,"本刊通讯员",,1995,"第六期",72
    1047,"超高水头可逆式水轮机的特殊设计构思",,,,,,,"刘国清译",,1995,"第六期",72
    1048,"雅西列塔转桨式水轮机的设计,制造和安装",,,,,,,"刘国清译",,1995,"第六期",72
    1049,"凌津滩水电站机组国际招标文件编写中的有关问题",,,,,,,"廖资汉 何银芝",,1996,"第一期",73
    1050,"白龙潭电站水轮机选择及模型验收试验",,,,,,,"聂启蓉 刘益祥",,1996,"第一期",73
    1051,"泵装置效率比尺效应及换算方法的研究",,,,,,,"张仁田",,1996,"第一期",73
    1052,"白山水电站二期工程主要机电设备消防设计及改进情况",,,,,,,"姜俊阁",,1996,"第一期",73
    1053,"大坳水电站初设阶段技术供水及渗漏排水射流泵的选型",,,,,,,"徐荣华 万良牯",,1996,"第一期",73
    1054,"冲击式水轮机设计技术发展水平",,,,,,,"刘小芬译",,1996,"第一期",73
    1055,"日本水轮机制造技术的现状和将来",,,,,,,"郭勤 译",,1996,"第一期",73
    1056,"可变速抽水蓄能电站运转实验",,,,,,,"邓阳 舒彤译",,1996,"第一期",73
    1057,"小湾水电站水轮机机型及主要参数的选择分析",,,,,,,"曾镇铃",,1996,"第二期",74
    1058,"广东江口水电站水力机械设计的几个特点",,,,,,,"谢桂生",,1996,"第二期",74
    1059,"有关水电站调节保证计算的标准,工况选择和计算方法的探讨",,,,,,,"刘保华",,1996,"第二期",74
    1060,"三峡水轮机效率加权因子分布的合理原则",,,,,,,"刘尊祥",,1996,"第二期",74
    1061,"尼泊尔王国崔舒里水电站3#4#机组出力与效率现场试验",,,,,,,"王日平 熊杰",,1996,"第二期",74
    1062,"太平湾水电站机组(发电机)自流(虹吸)供水设计",,,,,,,"白广仁",,1996,"第二期",74
    1063,"自流技术供水机组冷却器进口压力和冷却器真空度计算公式的修正",,,,,,,"高武 ",,1996,"第二期",74
    1064,"日本最近水泵水轮机转轮的制造技术",,,,,,,"郭勤译",,1996,"第二期",74
    1065,"克鲁松-狄克桑斯水轮机的设计",,,,,,,"刘国清译",,1996,"第二期",74
    1066,"万家寨水电站水机专业设计体会",,,,,,,"方源",,1996,"第三期",75
    1067,"导叶两段折线关闭时转速瞬变规律的求解",,,,,,,"彭宽平",,1996,"第三期",75
    1068,"大银甸水库 坝后电站调压措施研究与实施",,,,,,,"郭建平",,1996,"第三期",75
    1069,"八盘峡水电厂2号机组更换转轮后出力不足原因分析与处里",,,,,,,"孙爱",,1996,"第三期",75
    1070,"循环供水系统在水电站的应用",,,,,,,"陈涛 王祥桂",,1996,"第三期",75
    1071,"射流泵设计,运行与系列化",,,,,,,"王通林",,1996,"第三期",75
    1072,"大型斜置轴伸泵研制简述",,,,,,,"徐红新",,1996,"第三期",75
    1073,"小水电厂运行中的水力瞬变",,,,,,,"吴秀云译",,1996,"第三期",75
    1074,"更换转轮提高性能的方法",,,,,,,"黄宝南译",,1996,"第三期",75
    1075,"宝兴水电站水轮机参数优化选择",,,,,,,"田树棠",,1996,"第四期",76
    1076,"贯流式水轮发电机气隙变化动态测量与分析",,,,,,,"泰建新",,1996,"第四期",76
    1077,"小湾电站水轮机防止和减少导水机构漏水的措施浅析",,,,,,,"曾镇铃",,1996,"第四期",76
    1078,"富春江水电厂1号机组转轮叶片更换前后的效率试验",,,,,,,"郑源 李贤庆 徐炳荣 姜德清",,1996,"第四期",76
    1079,"机组自流技术供水管网流量分配和冷却器压力及真空度的波动问题",,,,,,,"高武",,1996,"第四期",76
    1080,"槐扒黄河提水工程一级泵站机型清淤排水方案确定和设备选择",,,,,,,"袁涛 徐银明",,1996,"第四期",76
    1081,"桃林口水电站辅助设备及自动化元件的特点",,,,,,,"杨亚伦",,1996,"第四期",76
    1082,"水轮机主轴密封运行与供水压力限额",,,,,,,"张一国",,1996,"第四期",76
    1083,"罗湾水力发电厂球阀接力器改造",,,,,,,"刘海荣 余海潮",,1996,"第四期",76
    1084,"美国贝利维尔水电站水轮机设计的优化",,,,,,,"刘国清译",,1996,"第四期",76
    1085,"大型低水头贯流式水轮机空蚀情况下飞逸转速的比尺效应",,,,,,,"彭渤译",,1996,"第四期",76
    1086,"水电站巨型机组选择的一些重大技术问题",,,,,,,"李国梁",,1996,"第五期",77
    1087,"王甫洲水电站的灯泡式水轮机及辅助系统",,,,,,,"王建华 郑建强",,1996,"第五期",77
    1088,"瑞典扬弗辛电站齿轮箱增速卡普兰水轮机发电机简介",,,,,,,"沈学明",,1996,"第五期",77
    1089,"用相似理论设计原,模型射流泵",,,,,,,"沈东 王难贵 张思青 何士华 徐一民",,1996,"第五期",77
    1090,"泰兴枢纽双向泵站的泵型选择与试验研究",,,,,,,"张平易 张仁田",,1996,"第五期",77
    1091,"以礼河电厂冲击式机组流量效率在线监测的可行性研究",,,,,,,"范华秀 刘梅盛 王难贵 何维斌 陈祖文",,1996,"第五期",77
    1092,"由丹江电厂论水轮机汽蚀的防治",,,,,,,"张厚升",,1996,"第五期",77
    1093,"机组自动化在小型水电站运行的必要性探讨",,,,,,,"朱世东",,1996,"第五期",77
    1094,"采取定位法处里操作油管故障",,,,,,,"杨德富 李德明",,1996,"第五期",77
    1095,"台山大隆洞水电站压力钢管管径偏小问题的探讨",,,,,,,"甄华铎",,1996,"第五期",77
    1096,"可调速水轮机和发电机",,,,,,,"彭宽平译",,1996,"第五期",77
    1097,"水轮机上冠泄水降压及从顶盖取冷却水的分析",,,,,,,"李国梁",,1996,"第六期",78
    1098,"云南漫湾机组能量指标验证",,,,,,,"刘秀良 徐春荣",,1996,"第六期",78
    1099,"灯泡贯流式水轮机测流研究与设计",,,,,,,"陈晓霞 郑守纲",,1996,"第六期",78
    1100,"导水机构两段关闭装置失效原因分析",,,,,,,"费修渔",,1996,"第六期",78
    1101,"美国水电站增容改造综述",,,,,,,"舒燕平",,1996,"第六期",78
    1102,"丹江口水电厂6号水轮机转轮更换",,,,,,,"石小平",,1996,"第六期",78
    1103,"灯泡贯流式机组轴承油系统的设计",,,,,,,"冯衍祥",,1996,"第六期",78
    1104,"转桨式水轮机转轮叶片外圆加工",,,,,,,"韦君",,1996,"第六期",78
    1105,"大型立式泵机组电机空气间隙质量控制研究",,,,,,,"仇宝云",,1996,"第六期",78
    1106,"对水力机械磨损的分析",,,,,,,"刘国清译",,1996,"第六期",78
    1107,"江垭水力枢纽水轮发电机组合同签定",,,,,,,"黄少华",,1996,"第六期",78
    1108,"百色水利枢纽初设阶段电站水轮机选型分析",,,,,,,"徐秉均",,1997,"第一期",79
    1109,"洪家渡水电站项目技术援助工作的一点体会",,,,,,,"谢民峰",,1997,"第一期",79
    1110,"中低水头混流式水轮机优化设计的比转速选择",,,,,,,"肖厚春",,1997,"第一期",79
    1111,"天津通用电器阿尔斯通水电设备有限公司与中国抽水蓄能电站建设",,,,,,,"高道扬",,1997,"第一期",79
    1112,"莲花水电站水力机械部分机组自动化及水力监测系统设计",,,,,,,"才焕新",,1997,"第一期",79
    1113,"万家寨水电站技术供水系统设计及防泥沙措施",,,,,,,"郑淑华",,1997,"第一期",79
    1114,"田关泵站主机采用变速机组可行性分析",,,,,,,"王国勤",,1997,"第一期",79
    1115,"转轮更换中的最新发展",,,,,,,"刘国清译",,1997,"第一期",79
    1116,"带分流叶片的转轮",,,,,,,"裴海林译",,1997,"第一期",79
    1117,"湖南镇水电站扩建工程机组试运行成功",,,,,,,"冯为民",,1997,"第一期",79
    1118,"龙滩水电站水轮机参数选择",,,,,,,"陈祖谋",,1997,"第二期",80
    1119,"宁波溪口,金华国湖抽水蓄能电站水泵-水轮机参数选择",,,,,,,"王日平",,1997,"第二期",80
    1120,"MCNARY电站水轮机新结构的研究应用",,,,,,,"章光伟",,1997,"第二期",80
    1121,"改进的斜尾水肘管的简化计算方法",,,,,,,"何凯希",,1997,"第二期",80
    1122,"WT-100型调速器工作原理与应用",,,,,,,"张一国",,1997,"第二期",80
    1123,"李家峡水电站桥机移跨方案选择",,,,,,,"沙莉 宋建英",,1997,"第二期",80
    1124,"混流式水轮机的水力设计策略",,,,,,,"刘国清译",,1997,"第二期",80
    1125,"气蚀现象三则",,,,,,,"彭宽平译",,1997,"第二期",80
    1126,"徐村水电站水轮机机型",,,,,,,"曾镇铃",,1997,"第三期",81
    1127,"浅谈有偏转角的弯肘型尾水管的参数校核",,,,,,,"周雄",,1997,"第三期",81
    1128,"水电站供水系统设计",,,,,,,"沈菊英",,1997,"第三期",81
    1129,"组合式减压阀在乌溪江水电厂的应用",,,,,,,"张新珊",,1997,"第三期",81
    1130,"多泥沙河流电站技术供水设计",,,,,,,"刘谦",,1997,"第三期",81
    1131,"京密引水渠水电站技术供水系统改造成果",,,,,,,"谢宝珍 于丽生",,1997,"第三期",81
    1132,"SBKZ-Ⅱ装置与计算机组成的水泵性能测试系统",,,,,,,"朱志竟 李世煜",,1997,"第三期",81
    1133,"关于伸缩节止漏结构的探讨",,,,,,,"冯衍祥",,1997,"第三期",81
    1134,"氟塑料导瓦在电厂的应用",,,,,,,"陈炎光",,1997,"第三期",81
    1135,"利用逆变器的微水力发电装置的高性能化研究",,,,,,,"蔡千华译",,1997,"第三期",81
    1136,"阿姆斯特格水电站低水头多喷咀冲击式水轮机",,,,,,,"刘国清译",,1997,"第三期",81
    1137,"十三陵抽水蓄能电站机组及其附属设备特点介绍",,,,,,,"周益",,1997,"第四期",82
    1138,"混流式水轮机主轴联合密封新结构研究与设计",,,,,,,"章光伟",,1997,"第四期",82
    1139,"东江水电厂水轮发电机原制动环快速断裂原因及其预防的探讨",,,,,,,"吴长利",,1997,"第四期",82
    1140,"推力轴承油冷却器的更新与制作",,,,,,,"文中才",,1997,"第四期",82
    1141,"关于我国大流量测量技术发展的回顾和展望",,,,,,,"瞿殿中 赵学东 徐春荣",,1997,"第四期",82
    1142,"扬水泵站动力系统CAD软件",,,,,,,"杨培君 薛塞光 刘发权",,1997,"第四期",82
    1143,"潜水轴流泵在排涝站中的应用",,,,,,,"李朝晖",,1997,"第四期",82
    1144,"小水电工程中的技术改进工作",,,,,,,"王国平",,1997,"第四期",82
    1145,"调速型液力偶合器在微型水轮机组中的运用探讨",,,,,,,"谢民峰",,1997,"第四期",82
    1146,"采用拟可压缩性方程对混流式水轮机转轮的紊流模拟",,,,,,,"裴海林译",,1997,"第四期",82
    1147,"混流式转轮的性能",,,,,,,"克瓦纳(杭州)发电设备有限设备有限公司",,1997,"第五期",83
    1148,"改善水力机械转轮气蚀,磨损性能的新途径",,,,,,,"张成冠",,1997,"第五期",83
    1149,"相似准则在水斗式水轮机选型时的应用",,,,,,,"闵凤宾",,1997,"第五期",83
    1150,"万安水电站射流泥浆泵试验研究",,,,,,,"长江水利委员会设计院",,1997,"第五期",83
    1151,"英山占河三级电站取消给气压水调相的研究与应用",,,,,,,"王国勤",,1997,"第五期",83
    1152,"在我院水电站设计中应用的辅助设备及自动化元件",,,,,,,"马述江",,1997,"第五期",83
    1153,"河坞水电站油系统设计及剖析",,,,,,,"朱世东",,1997,"第五期",83
    1154,"广东江口电站灯泡贯流式机组设计的几个问题",,,,,,,"谢桂生",,1997,"第五期",83
    1155,"输水管道空间复合角分析计算",,,,,,,"薛塞光 王新华",,1997,"第五期",83
    1156,"半伞式水轮发电机组"吊转子不盘车"进行机组轴线调整处理方法",,,,,,,"张方求",,1997,"第五期",83
    1157,"水电机组无油脂轴套的比较试验",,,,,,,"刘国清译",,1997,"第五期",83
    1158,"北京托宝水力机械研究中心组成联合体",,,,,,,"中国农业大学",,1997,"第五期",83
    1159,"轴流定桨式水轮机的开发应用",,,,,,,"徐洪泉 沈祝平",,1997,"第六期",84
    1160,"抽水蓄能水轮机技术发展趋势",,,,,,,"克瓦纳杭州发电设备有限公司",,1997,"第六期",84
    1161,"灯泡贯流机组的整体布置及受力分析",,,,,,,"王日平",,1997,"第六期",84
    1162,"浅谈《水利水电工程设计防火规范》的修编",,,,,,,"李婉芳",,1997,"第六期",84
    1163,"水力机械设备基础和管路设计中的一些体会",,,,,,,"李继堂",,1997,"第六期",84
    1164,"大型水轮发电机组关闭进出水闸门排水调相运行的实践",,,,,,,"张应祥",,1997,"第六期",84
    1165,"梯级扬水泵站中一种节能装置-液力偶合技术",,,,,,,"薛塞光 樊河新",,1997,"第六期",84
    1166,"标准弧段磨削加工及磨削设备改装",,,,,,,"陈国英 刘焱明",,1997,"第六期",84
    1167,"中国最大的混流式机组的设计和制造",,,,,,,"刘国清译",,1997,"第六期",84
    1168,"S型水轮机应用",,,,,,,"黄烈武译",,1997,"第六期",84
    1169,"响水涧抽水蓄能电站水泵水轮机参数研究",,,,,,,"仉燕玉 蔡锦华 余德钧 胡建根",,1998,"第一期",85
    1170,"超高水头混流式水轮机",,,,,,,"克瓦纳杭州发电设备有限公司",,1998,"第一期",85
    1171,"户宋河电站四喷咀冲击式机组调速系统的构想与实践",,,,,,,"周明夫",,1998,"第一期",85
    1172,"雨城水电站的消防设计及快速雨淋阀组的应用",,,,,,,"黄锦耀",,1998,"第一期",85
    1173,"消防设计若干问题",,,,,,,"李婉芳",,1998,"第一期",85
    1174,"都平电站的消防系统及改进措施",,,,,,,"谢桂生",,1998,"第一期",85
    1175,"ZBM951-750与350ZLB70模型泵台对比试验简介",,,,,,,"胡小湘",,1998,"第一期",85
    1176,"盐官下河泵站机型选择",,,,,,,"魏纬 张道宏",,1998,"第一期",85
    1177,"大型立式泵机组部件高差的安装控制",,,,,,,"仇宝云",,1998,"第一期",85
    1178,"新型水轮机抗磨涂料NEYRCOTM",,,,,,,"刘国清译",,1998,"第一期",85
    1179,"马骝滩灯泡贯流机组水轮机设计",,,,,,,"朱再华",,1998,"第二期",86
    1180,"500m水头段水轮机选型—简述自一里水轮机选择",,,,,,,"何莘伯",,1998,"第二期",86
    1181,"石板水电站水轮机及主阀选型优化",,,,,,,"乌晓明",,1998,"第二期",86
    1182,"十三陵蓄能电站水泵/水轮机模型转轮试验结果及其分析",,,,,,,"刘树昌",,1998,"第二期",86
    1183,"十三陵蓄能电站蜗壳水压试验过程渗水问题的处理与体会",,,,,,,"王维洁 杨晓松",,1998,"第二期",86
    1184,"混流式水轮发电机组产生异常水力振动的原因分析和探讨",,,,,,,"张方求",,1998,"第二期",86
    1185,"关于水电工程引进国外机电设备的点滴体会",,,,,,,"刘春燕",,1998,"第二期",86
    1186,"东坝头提水站技术供水设计",,,,,,,"朱世东",,1998,"第二期",86
    1187,"都平水电站油水气系统及其部分设备的改造",,,,,,,"赵中初",,1998,"第二期",86
    1188,"水力机械磨损问题之一—沙粒磨损",,,,,,,"裴海林译",,1998,"第二期",86
    1189,"冲击式转轮制造中的最新趋势",,,,,,,"刘国清译",,1998,"第二期",86
    1190,"云贵响水电站水轮机及主阀设备优化设计 ",,,,,,,"王子健",,1998,"第三期",87
    1191,"多泥沙河流水轮机参数选择及大修间隔计算分析",,,,,,,"田迅",,1998,"第三期",87
    1192,"万家寨引黄入普工程泵站水泵选型与额定转速优化",,,,,,,"张泽太 刘桂芹",,1998,"第三期",87
    1193,"水轮发电机组安装同心测园法及其应用",,,,,,,"黄张豪 胡鹏程",,1998,"第三期",87
    1194,"十三陵电站蓄能机组盘车方法及摆度计算",,,,,,,"白艳芹",,1998,"第三期",87
    1195,"京南电站进口机组安装运行观察略记",,,,,,,"刘春燕",,1998,"第三期",87
    1196,"为偏离最佳点运行设计的混流式转轮",,,,,,,"刘国清译",,1998,"第三期",87
    1197,"SJTB型压力钢管,蜗壳带波纹管的套管式伸缩节装置的设计",,,,,,,,,1998,"第三期",87
    1198,"混流式转轮优化设计模型与改型研究",,,,,,,"罗兴琦 梁武科 廖伟丽",,1998,"第四期",88
    1199,"土夭沟电站机组选型及对所选装机容量的看法",,,,,,,"刘桂芹",,1998,"第四期",88
    1200,"大化水电站机组增容改造",,,,,,,"龙有宾",,1998,"第四期",88
    1201,"水力机组环形接力器改造新的途径",,,,,,,"王建义",,1998,"第四期",88
    1202,"大型水轮机及其辅助设备安装技术的新进展",,,,,,,"宋晶辉 胡鹏程",,1998,"第四期",88
    1203,"电站管道及附件制作,安装的一些问题",,,,,,,"谢桂生",,1998,"第四期",88
    1204,"望虞河双向泵站的泵型选择与试运行",,,,,,,"张仁田 张平易",,1998,"第四期",88
    1205,"水轮机补气短管断落故障的分析和处理",,,,,,,"费修渔",,1998,"第四期",88
    1206,"转浆式水轮机操作油管的结构稳定性",,,,,,,"李永跃",,1998,"第四期",88
    1207,"论水电站的泥沙磨损问题",,,,,,,"刘国清译",,1998,"第四期",88
    1208,"抓住时机加快开发可持续发展的水电再生资源",,,,,,,"青长庚",,1998,"第五期",89
    1209,"宁波溪口抽水蓄能电站水路机械设计",,,,,,,"吕建平",,1998,"第五期",89
    1210,"石桥水电站机组选型",,,,,,,"徐新平",,1998,"第五期",89
    1211,"盐锅峡水电站10号机增容改造",,,,,,,"李婉芳",,1998,"第五期",89
    1212,"基于Windows的机组辅助设备CAD研究",,,,,,,"于波 罗智勇",,1998,"第五期",89
    1213,"南水北调东线工程大型低扬程水泵机组的试验研究",,,,,,,"卜淑和 钱涵欣 杨荣娣",,1998,"第五期",89
    1214,"YT型调速器油压装置的运行维护",,,,,,,"黄明银",,1998,"第五期",89
    1215,"调速器电液转换器的改造",,,,,,,"朱日君 杨文德",,1998,"第五期",89
    1216,"长潭水电站2号机水轮机主轴工作密封多次烧焦事故分析",,,,,,,"吴振光 刘元峰 甄华铎",,1998,"第五期",89
    1217,"带辅助叶轮的新型水轮机的开发",,,,,,,"蔡千华译",,1998,"第五期",89
    1218,"用于经济低水头发电的半桨式水轮机",,,,,,,"刘国清译",,1998,"第五期",89
    1219,"含沙水流条件下的水轮机选择",,,,,,,"青长庚",,1998,"第六期",90
    1220,"响洪甸抽水蓄能机组的选型",,,,,,,"程光华",,1998,"第六期",90
    1221,"水泵-水轮机的容量平衡与铭牌功率(出力/入力)探讨",,,,,,,"高道扬",,1998,"第六期",90
    1222,"蓄能电站过度过程中的压力脉动",,,,,,,"周益 荀东明",,1998,"第六期",90
    1223,"陆水电厂ZZ105-LH-300型水轮机转轮的增容改造",,,,,,,"徐洪泉 沈祝平 姬晋延等",,1998,"第六期",90
    1224,"富水水电厂1#水轮机转轮改造增容取得成功",,,,,,,"王桥民 瞿建平",,1998,"第六期",90
    1225,"新型潜水电泵站水利水电工程中的应用前景",,,,,,,"立传忻",,1998,"第六期",90
    1226,"贵港库区防护潜水泵站的选型与设计",,,,,,,"龙有宾",,1998,"第六期",90
    1227,"盐官下河站闸枢纽工程2#主机泵轴瓦烧损事故的处理",,,,,,,"王日平",,1998,"第六期",90
    1228,"高砂水电站贯流式机组透平油系统设计与改造",,,,,,,"李玉华",,1998,"第六期",90
    1229,"沱江梯级电站水系统设计",,,,,,,"徐新平",,1998,"第六期",90
    1230,"一台用于山地站址的高比转速冲击式水轮机研制",,,,,,,"刘国清译",,1998,"第六期",90
    1231,"HL720转轮增容改造的试验研究",,,,,,,"谭月烂 李建成 赵春明 邵保安",,1999,"第一期",91
    1232,"高水头卧轴混流式水轮机的研究与设计",,,,,,,"章光伟",,1999,"第一期",91
    1233,"混流式水轮机叶片木模图绘制的计算机程序设计",,,,,,,"熊建平",,1999,"第一期",91
    1234,"河盘桥电站竖井贯流式水轮机的结构特点",,,,,,,"任柏青",,1999,"第一期",91
    1235,"水电站中小型调速器",,,,,,,"周怡彦",,1999,"第一期",91
    1236,"水电站辅助设备系统空气的干燥和除(防)水",,,,,,,"高武 田继再 赵大胜 高原 熊必康",,1999,"第一期",91
    1237,"对中小型水轮发电机喷水灭火设计的体会",,,,,,,"勾国本",,1999,"第一期",91
    1238,"青溪水电厂1#机组压力油罐自动补气装置的技术改造",,,,,,,"曾大琼 陈晓强 甄华铎",,1999,"第一期",91
    1239,"冯家埭泵站泵型选择与运行特性分析",,,,,,,"叶世鼎 钱强",,1999,"第一期",91
    1240,"喷射技术在机电排灌工程中的应用",,,,,,,"冯子成 牛淑丽",,1999,"第一期",91
    1241,"用于新电厂和老电厂改造的冲击式水轮机技术",,,,,,,"刘国清译",,1999,"第一期",91
    1242,"大型输水或发电工程动态仿真中明流管流联合计算问题研究",,,,,,,"刘立宪 李辉 陈乃祥",,1999,"第二期",92
    1243,"水轮机耐气蚀材料的堆焊性能",,,,,,,"蒋菊平 曾晓娟 ",,1999,"第二期",92
    1244,"安仁溪水电站机组动能参数在线监测",,,,,,,"范华秀 刘金生 徐汉柯 陈晓霞 苏学周",,1999,"第二期",92
    1245,"多泥沙高水头电站机组的导叶端面设计",,,,,,,"王晓刚",,1999,"第二期",92
    1246,"水轮机球阀活门和阀体的整体结构设计",,,,,,,"翁廷梁",,1999,"第二期",92
    1247,"甘肃沿黄提灌工程水利机械技术发展与展望",,,,,,,"梁章堂",,1999,"第二期",92
    1248,"澳门凼仔污水处理厂设计特点及启迪",,,,,,,"林金川",,1999,"第二期",92
    1249,"大广坝水电厂水轮机短管补气系统的改造",,,,,,,"王泰庚 黎化银",,1999,"第二期",92
    1250,"立轴混流式水轮机导轴承主备用水异常原因分析和改进",,,,,,,"任柏青",,1999,"第二期",92
    1251,"天楼地枕水电厂水轮机水轮机主轴密封运行与改造",,,,,,,"陈晓明",,1999,"第二期",92
    1252,"长潭水电厂油压装置自动调油面系统的技术改造",,,,,,,"林大洲 杨文军 甄华铎",,1999,"第二期",92
    1253,"双转轮混流式水轮机防止气蚀的掺气试验",,,,,,,"刘国清译",,1999,"第二期",92
    1254,"浅谈水轮发电机组的选择设计和电站改造",,,,,,,"刘书秋",,1999,"第三期",93
    1255,"超高水头水泵水轮机型式及比转速选择",,,,,,,"陈绍钢",,1999,"第三期",93
    1256,"径向式导水机构传动尺寸的优化计算",,,,,,,"宋文武 刘明东",,1999,"第三期",93
    1257,"高水头长引水管道机组接力器缓冲槽设计",,,,,,,"孟希于",,1999,"第三期",93
    1258,"HL240水轮机的增容改造研究",,,,,,,"赵春明",,1999,"第三期",93
    1259,"丰乐水电站扩容改造与效益",,,,,,,"胡光辉",,1999,"第三期",93
    1260,"马回电站1#机受油器的改进",,,,,,,"杨涵清",,1999,"第三期",93
    1261,"冒水洞电站循环供水系统设计",,,,,,,"姚建国",,1999,"第三期",93
    1262,"高水头电站技术供水方式的探讨",,,,,,,"王永成",,1999,"第三期",93
    1263,"泵站水锤防护中的阀门选择",,,,,,,"薛塞光",,1999,"第三期",93
    1264,"日本水电站备用品德设置标准",,,,,,,"蒋菊平 ",,1999,"第三期",93
    1265,"水轮发电机用PTFE树脂推力轴承",,,,,,,"蔡千华译",,1999,"第三期",93
    1266,"微型铸件冲击式水轮机经验回顾",,,,,,,"刘国清译",,1999,"第三期",93
    1267,"微机步进式水轮机调速器简介",,,,,,,,,1999,"第三期",93
    1268,"二滩水电站水轮发电机的结构介绍",,,,,,,"向升",,1999,"第四期",94
    1269,"太平驿水轮机的抗磨措施与沉沙池标准及效益",,,,,,,"段凌剑 李国梁",,1999,"第四期",94
    1270,"旁通管路上力平衡式伸缩节的设计",,,,,,,"朱兆敏",,1999,"第四期",94
    1271,"调速器接力器不动时间Tq的探讨",,,,,,,"孙邦彦",,1999,"第四期",94
    1272,"东江水电厂防潮防结露技术研究",,,,,,,"刘谦 廖承友",,1999,"第四期",94
    1273,"丹江口水电厂5号发电机导瓦更换总结",,,,,,,"王云涛 石小平",,1999,"第四期",94
    1274,"长潭水电厂2号机组增容改造水轮机的主要结构设计特点",,,,,,,"藏樵",,1999,"第四期",94
    1275,"都平水电厂机组导叶轴头密封的改造",,,,,,,"黄伟 席江",,1999,"第四期",94
    1276,"大峡水电厂1号机承重机架垂直弹性变形量的检测",,,,,,,"裴海林 刘建国",,1999,"第四期",94
    1277,"进口自动化元件在水电厂的应用",,,,,,,"吴振光 廖宇腾 甄华铎",,1999,"第四期",94
    1278,"CWY型电涡流传感器的安装与使用",,,,,,,"江翠华",,1999,"第四期",94
    1279,"水淹厂房的教训",,,,,,,"孙定茂",,1999,"第四期",94
    1280,"长春市供水与环境工程(引水部分)泵站水力机械设计特点及体会",,,,,,,"邹玉涛",,1999,"第四期",94
    1281,"大型水电机组推力轴承布置比较方案",,,,,,,"刘国清译",,1999,"第四期",94
    1282,"三种新型水轮机调速器通过部级鉴定",,,,,,,"贾宝良 仉明",,1999,"第四期",94
    1283,"关于小湾电站巨型水轮机结构的几点设想",,,,,,,"青长庚",,2000,"第一期",95
    1284,"灯泡贯流式水轮机选择设计优化要点",,,,,,,"田树棠",,2000,"第一期",95
    1285,"250m水头段水轮机转轮水力性能研究",,,,,,,"童正权",,2000,"第一期",95
    1286,"大峡水电站4×75MW轴流转浆式水轮机的试验研究",,,,,,,"赵春明",,2000,"第一期",95
    1287,"大七孔电站高转速立式机组的特征参数确定与结构特点",,,,,,,"丁继茂 王纬",,2000,"第一期",95
    1288,"水电站水轮发电机组技术的发展",,,,,,,"乐汉卿",,2000,"第一期",95
    1289,"孔头水电站轴流转浆式水轮机的结构特点",,,,,,,"何凯希",,2000,"第一期",95
    1290,"水泵—水轮机的充气压水启动及其充气压水系统",,,,,,,"李永耀",,2000,"第一期",95
    1291,"贵港航运枢纽电站管形座立柱焊接工艺介绍",,,,,,,"刘峰",,2000,"第一期",95
    1292,"八盘峡电站⑤机组水轮机的更新改造",,,,,,,"田锋社",,2000,"第一期",95
    1293,"利用温度预测的扬水发电站的轴承诊断装置",,,,,,,,,2000,"第一期",95
    1294,"广州抽水蓄能电站二期工程水泵水轮机转速的选择",,,,,,,"何文才 朱江",,2000,"第二期",96
    1295,"盐锅峡十号水轮机水力设计分析",,,,,,,"雷建芳",,2000,"第二期",96
    1296,"与座环锥形边相接的金属蜗壳水力设计",,,,,,,"顾照国 陈梁年",,2000,"第二期",96
    1297,"江垭水轮发电机组国际招标综述",,,,,,,"黄少华 陈冬",,2000,"第二期",96
    1298,"二滩水电站技术供水系统设计",,,,,,,"董宏成",,2000,"第二期",96
    1299,"对江都一站更新改造工程设计的思考",,,,,,,"张坚 吕省三",,2000,"第二期",96
    1300,"国产贯流式机组导水机构连杆技术改造",,,,,,,"刘小双 朱赛锋",,2000,"第二期",96
    1301,"JEC-157-1980日本电气学会电气规程调查会标准规程水轮机及水泵水轮机的效率试验方法",,,,,,,"蒋菊平译",,2000,"第二期",96
    1302,"西洱河一级电站新型转轮的研制分析",,,,,,,"曾为",,2000,"第三期",97
    1303,"灯泡贯流式机组油,水系统设计简介",,,,,,,"张鹏程",,2000,"第三期",97
    1304,"灯泡贯流式机组结构设计的几个问题",,,,,,,"谢桂生",,2000,"第三期",97
    1305,"葛洲坝水电站扩机的可能性探讨",,,,,,,"李正安",,2000,"第三期",97
    1306,"水电站油压装置主油阀设计",,,,,,,"施肖永",,2000,"第三期",97
    1307,"解决混流机组尾水椎管下部渗水的有关措施",,,,,,,"刘润根",,2000,"第三期",97
    1308,"二滩水电站水轮机转轮现场组装加工",,,,,,,"王海旭",,2000,"第三期",97
    1309,"贵港水电站贯流式机组水轮机安装浅析",,,,,,,"唐令激",,2000,"第三期",97
    1310,"浅谈贯流式机组调速系统的安装",,,,,,,"戴金芬",,2000,"第三期",97
    1311,"大型虹吸式轴流泵站启动振动的原因分析",,,,,,,"董毅 吕省三",,2000,"第三期",97
    1312,"鲁布革水电站水轮机磨蚀情况及修复时机浅谈",,,,,,,"保佑风",,2000,"第三期",97
    1313,"丹江口水电站⑤机组弹性油箱制造与更换",,,,,,,"张厚升",,2000,"第三期",97
    1314,"白石窖水电站转轮活塞导向销处理方案",,,,,,,"刘小林 朱赛锋",,2000,"第三期",97
    1315,"多渠道多途径进行小水电站技术改造前景广阔",,,,,,,"姜巨泉",,2000,"第三期",97
    1316,"江苏沙河抽水蓄能电站50MW水泵水轮机的模型验收",,,,,,,"沈祝平 邓杰 许纯明等",,2000,"第四期",98
    1317,"射流泵模拟试验与合理选型",,,,,,,"何成连 由彩堂 董盛",,2000,"第四期",98
    1318,"斜轴150轴伸泵导轴承的设计问题",,,,,,,"王日平",,2000,"第四期",98
    1319,"潜水泵站特点及在我省排涝中的应用",,,,,,,"刘润根",,2000,"第四期",98
    1320,"浅析推力头轴孔配合精度对机组安装和运行质量的影响",,,,,,,"仇天林 董毅 吕省三",,2000,"第四期",98
    1321,"水电站噪声治理初探",,,,,,,"董开松 白绍林 刘秀良",,2000,"第四期",98
    1322,"雍口水电站水轮机安装",,,,,,,"叶合平",,2000,"第四期",98
    1323,"沙县城关电站水轮发电机组异常声响成因探讨",,,,,,,"褚镇敏",,2000,"第四期",98
    1324,"贯流式水轮机外操作油管断裂处理及原因分析",,,,,,,"孙定茂",,2000,"第四期",98
    1325,"接力器在进水阀动水关闭时的作用",,,,,,,"朱兆敏 李胜",,2000,"第四期",98
    1326,"无油轮毂",,,,,,,"赵春明译",,2000,"第四期",98
    1327,"混流式水轮机能量评比新思路",,,,,,,"廖资汉 吴滨",,2001,"第一期",99
    1328,"嘉兴市城市防洪工程水泵模型验收试验",,,,,,,"王日平",,2001,"第一期",99
    1329,"基于VC++的一种水轮机金属蜗壳的计算机辅助设计方法",,,,,,,"朱云 柏斌 李翠林",,2001,"第一期",99
    1330,"水轮机调速器设备五十年发展",,,,,,,"赵坤耀 ",,2001,"第一期",99
    1331,"智能式水轮机调速器研究",,,,,,,"刘昌玉 刘文斌等",,2001,"第一期",99
    1332,"增大接力器容量对轴伸贯流式机组运行稳定性的影响",,,,,,,"李晃 刘卫亚",,2001,"第一期",99
    1333,"大化水电站机组增容改造的研究与实施",,,,,,,"聂启蓉 ",,2001,"第一期",99
    1334,"供水放空洞出口锥形阀及肖能罩的技术改造",,,,,,,"徐文峰 刘志民 赵春明",,2001,"第一期",99
    1335,"通风系统中水轮发电机增容改造中的作用",,,,,,,"董开松 白绍林 刘秀良",,2001,"第一期",99
    1336,"张王庙电站机组的技术改造",,,,,,,"刘润根 郭饶鑫",,2001,"第一期",99
    1337,"沙县城关水电站水轮机发电机组安装",,,,,,,"叶合平",,2001,"第一期",99
    1338,"论冷竹关电站水轮发电机组的结构设计与应用技术",,,,,,,"雷军 郭筱蓉 陈雄藻",,2001,"第二期",100
    1339,"天堂抽水蓄能电站水力机械设计",,,,,,,"刘良娟",,2001,"第二期",100
    1340,"水泵—水轮机的全特性与稳定性初步探讨",,,,,,,"高道扬",,2001,"第二期",100
    1341,"调速器在负载过渡过程的研究",,,,,,,"周志军",,2001,"第二期",100
    1342,"一种高可靠性的无油"电液转换器"",,,,,,,"周泰经 魏守平 吴应文 饶培棠",,2001,"第二期",100
    1343,"ZZ105-LH-300水轮机改造的成功经验",,,,,,,"肖厚春 何凯希 项鹏程 陈智云",,2001,"第二期",100
    1344,"丹江口水电厂③机组通风系统改造",,,,,,,"徐鸣",,2001,"第二期",100
    1345,"压力容器设计点滴",,,,,,,"杨述平",,2001,"第二期",100
    1346,"水轮发电机组振动监测保护",,,,,,,"田树棠 江炯",,2001,"第二期",100
    1347,"水轮机转轮与转轮室间隙探讨",,,,,,,"孙定茂",,2001,"第二期",100
    1348,"清溪水电厂水轮机主轴密封冒烟原因分析及对策",,,,,,,"范曙登",,2001,"第二期",100
    1349,"孟洲坝水电厂③机转轮窜油原因分析与处理",,,,,,,"周勇明 辜训敬 罗冠荣",,2001,"第二期",100
    1350,"改造指南",,,,,,,"赵春明译",,2001,"第二期",100
    1351,"水轮机座环与蜗壳结构刚强度静力分析",,,,,,,"严锦丽 徐志明",,2001,"第三期",101
    1352,"弹性摩擦锥套推力头",,,,,,,"沈钊根",,2001,"第三期",101
    1353,"水轮机微机调速器若干问题的研讨",,,,,,,"吴应文",,2001,"第三期",101
    1354,"三门峡水电站调速器改造实践与思考",,,,,,,"石永伟 周好礼",,2001,"第三期",101
    1355,"乌泥河水电站技术供水系统设计",,,,,,,"王胜华",,2001,"第三期",101
    1356,"大型水泵水润滑导轴承的讨论",,,,,,,"汤泳 吕省三",,2001,"第三期",101
    1357,"长供水管道水泵出口阀门的选择",,,,,,,"张新萍",,2001,"第三期",101
    1358,"可提高老电站出力的新型转轮",,,,,,,"付钰",,2001,"第三期",101
    1359,"水轮机回复机构的改进",,,,,,,"孙定茂",,2001,"第三期",101
    1360,"富春江③机导叶钢背聚甲醛瓦的改造",,,,,,,"钱巨林",,2001,"第三期",101
    1361,"水电站同步发电机噪声产生原因及解决方式",,,,,,,"李丛岱 李冬平",,2001,"第三期",101
    1362,"机组上导摆度经常性异常增大原因查找及处理方法的探讨",,,,,,,"王辉斌",,2001,"第三期",101
    1363,"大坳电站首台机过速试验异常情况简介",,,,,,,"徐荣华 ",,2001,"第三期",101
    1364,"充分利用更新改造方法",,,,,,,"赵春明译 徐红新校",,2001,"第三期",101
    1365,"拉依喀电站水轮机选型",,,,,,,"李岁民",,2001,"第四期",102
    1366,"石泉扩机工程两台机同时甩负荷试验",,,,,,,"田树棠 杨新光 林云海 王文九",,2001,"第四期",102
    1367,"WBST-A型调速器在葛洲坝大江电厂的应用",,,,,,,"江旭东",,2001,"第四期",102
    1368,"水电站机组测流技术简论",,,,,,,"阎永忠",,2001,"第四期",102
    1369,"柴石滩电站非电量监测单元的选择",,,,,,,"雷剑",,2001,"第四期",102
    1370,"钓鱼台水电厂透平油系统的改造",,,,,,,"张华",,2001,"第四期",102
    1371,"梯级泵站优化调度系统初探",,,,,,,"李冬平 李丛岱",,2001,"第四期",102
    1372,"对大型泵站应用压缩空气解决超驼峰运行技术的思虑",,,,,,,"吕省三 朱建军 汤泳",,2001,"第四期",102
    1373,"渔子溪③水轮机改造安装实践",,,,,,,"唐辉",,2001,"第四期",102
    1374,"可逆混流式水泵水轮机的选型设计",,,,,,,"严丽译",,2001,"第四期",102
    1375,"卡普兰水轮机的新技术",,,,,,,"蔡千华译",,2001,"第四期",102
    1376,"灯泡机组最新发展动态",,,,,,,"田树棠",,2002,"第一期",103
    1377,"小型常蓄混合电站蓄能机组的选型",,,,,,,"梁谦 唐红",,2002,"第一期",103
    1378,"韩滩轴伸贯机组特点及结构设计",,,,,,,"王怀平",,2002,"第一期",103
    1379,"松普水电站机组选型",,,,,,,"潘雪梅",,2002,"第一期",103
    1380,"溪洛渡水电站水轮机筒阀设置研究",,,,,,,"陈其秋",,2002,"第一期",103
    1381,"水头在水轮机调速器控制中的应用分析",,,,,,,"杨兴斌",,2002,"第一期",103
    1382,"油压装置安全阀的常见故障及处理对策",,,,,,,"孙邦彦",,2002,"第一期",103
    1383,"小浪底北岸洞群供水系统改造方案",,,,,,,"刘建红 王胜军 金辉",,2002,"第一期",103
    1384,"水力机械自动化系统设计",,,,,,,"刘艳",,2002,"第一期",103
    1385,"八盘峡水电厂4号机运行稳定性试验分析",,,,,,,"闵占奎 白绍林 李海彦 赵天向",,2002,"第一期",103
    1386,"大化水轮机大轴密封和检修密封缺陷分析及改造方案",,,,,,,"盛学境",,2002,"第一期",103
    1387,"水轮机泄水锥对尾水压力脉动的影响",,,,,,,"王树清",,2002,"第一期",103
    1388,"水轮机转轮减压板开裂处理",,,,,,,"徐鸣",,2002,"第一期",103
    1389,"困扰水轮机的泥沙磨损",,,,,,,"赵春明译",,2002,"第一期",103
    1390,"石泉扩机工程设计优化及其实践",,,,,,,"田树棠 刘慧凤 段宏江 杨新光",,2002,"第二期",104
    1391,"乌鲁瓦提水电站机型选择与优化",,,,,,,"方向阳 吕维春",,2002,"第二期",104
    1392,"回龙抽水蓄能电站机组参数选择与招标",,,,,,,"朱义旺",,2002,"第二期",104
    1393,"大化水轮发电机定子增容改造简介",,,,,,,"傅有爱",,2002,"第二期",104
    1394,"江西南河水电站2号水轮机技术改造",,,,,,,"徐洪泉 沈程平 利盛昕 田雪真",,2002,"第二期",104
    1395,"瑞港水电站机组增容改造",,,,,,,"徐荣华 ",,2002,"第二期",104
    1396,"加来电站水轮机增容增效改造",,,,,,,"谢世培",,2002,"第二期",104
    1397,"灯泡式水轮机河床电站全枢纽过渡过程计算研究",,,,,,,"黄健兵 陈乃祥 樊红刚",,2002,"第二期",104
    1398,"混流式水轮机叶片展开程序设计新方法",,,,,,,"熊建平",,2002,"第二期",104
    1399,"盐锅峡10好水轮机振动分析",,,,,,,"张日义 高峰",,2002,"第二期",104
    1400,"湖南镇电站100MW机组转轮消氢处理",,,,,,,"丁国兴",,2002,"第二期",104
    1401,"引水压力钢管岔管组焊及残余应力的消除",,,,,,,"曲连明",,2002,"第二期",104
    1402,"四川姚河坝水电站3台机组发电",,,,,,,"李国梁",,2002,"第二期",104
    1403,"高水头三机式蓄能机组一般不宜再选用",,,,,,,"李国梁",,2002,"第三期",105
    1404,"水泵水轮机基本参数的选择",,,,,,,"张日义 聂素巧",,2002,"第三期",105
    1405,"白水河二级电站冲击式水轮机参数的确定",,,,,,,"王承勇",,2002,"第三期",105
    1406,"江苏沙河抽水蓄能电站#2机上导瓦事故原因浅析",,,,,,,"张西龙 刘谦",,2002,"第三期",105
    1407,"尾水管压力异常脉动消除",,,,,,,"丁国兴",,2002,"第三期",105
    1408,"白石窖水电厂3号机组水轮机转轮拉缸原因分析及处理",,,,,,,"黄成双",,2002,"第三期",105
    1409,"三盛公水电站3号机组转轮的修复",,,,,,,"黄继军 许广 李建杲",,2002,"第三期",105
    1410,"弹性氟塑料导瓦问题简述",,,,,,,"牛玉法 朱顺强 段惠敏",,2002,"第三期",105
    1411,"嘉兴市城市防洪工程四座泵站投入试运行",,,,,,,"王日平",,2002,"第三期",105
    1412,"用微机法做丹江电厂①机稳定性试验",,,,,,,"毛俊隽 王炜 叶江林 麻玲",,2002,"第三期",105
    1413,"对大型泵站应用弹性金属塑料推力瓦的思考",,,,,,,"滕海波 吕省三",,2002,"第三期",105
    1414,"对大型泵站运行中机组功率相差较大原因的分析",,,,,,,"夏炎 吕省三",,2002,"第三期",105
    1415,"萨彦舒申斯克水轮机的设计,制造与运行经验",,,,,,,"孙文斌译",,2002,"第三期",105
    1416,"简易式多喷咀卧轴下部冲击式水轮机的开发",,,,,,,"蔡千华译",,2002,"第三期",105
    1417,"高水头水轮机的水力设计",,,,,,,"Anders Wedmark",,2002,"第四期",106
    1418,"引子渡水电站水轮机选择及稳定性措施",,,,,,,"李月彬 孔西冰",,2002,"第四期",106
    1419,"上罗水电站水轮发电机组机型选择",,,,,,,"何筱强 周永忠",,2002,"第四期",106
    1420,"水泵-水轮机的容量平衡与铭牌功率(出力/入力)探讨",,,,,,,"高道扬",,2002,"第四期",106
    1421,"湖北天堂混流可逆式泵水轮机设计",,,,,,,"李永耀",,2002,"第四期",106
    1422,"南阳回龙抽水蓄能电站水泵水轮机模型目击验收试验",,,,,,,"乔中军",,2002,"第四期",106
    1423,"乌江渡水电站(3×250MW)水轮机改造设计分析",,,,,,,"雷建芳 张中东 王君利",,2002,"第四期",106
    1424,"富春江水电站机组改造中的水轮机选型问题",,,,,,,"王日平",,2002,"第四期",106
    1425,"白石窖水电厂自动运行协联曲线的修正",,,,,,,"刘小林",,2002,"第四期",106
    1426,"单竹电站主轴密封窜水问题分析与处理意见",,,,,,,"范曙登",,2002,"第四期",106
    1427,"恶滩水电站技术供水系统设计及其特点",,,,,,,"龙有宾 熊少辉",,2002,"第四期",106
    1428,"设计与制造的绿色性",,,,,,,"王晓武",,2002,"第四期",106
    1429,"一点小革新",,,,,,,"周德威",,2002,"第四期",106
    1430,"高水头混流式水轮机 ",,,,,,,"李观虎",,2003,"第一期",107
    1431,"马鹿塘水电站一期工程水轮机选择",,,,,,,"姚建国",,2003,"第一期",107
    1432,"水电站设置备用转轮探讨",,,,,,,"阎永忠",,2003,"第一期",107
    1433,"现代常规水轮发电机电磁结构设计探讨",,,,,,,"李海文 吴漫江",,2003,"第一期",107
    1434,"水轮机防泥沙磨蚀措施的技术特点",,,,,,,"陈梁年",,2003,"第一期",107
    1435,"高水头水轮机抗泥沙磨损的表面处理",,,,,,,"Anders Wedmark",,2003,"第一期",107
    1436,"卧龙台水电站顶盖取水技术特色",,,,,,,"田树棠 马彩萍 刘慧凤",,2003,"第一期",107
    1437,"国产水轮机调速器液压系统常见故障分析及处理对策",,,,,,,"孙邦彦",,2003,"第一期",107
    1438,"水轮机单独导叶接力器的特点及应用",,,,,,,"孙小勇",,2003,"第一期",107
    1439,"回龙电站水轮机改造",,,,,,,"孙定茂",,2003,"第一期",107
    1440,"关于大型立式机组上导瓦烧损问题探讨",,,,,,,"唐奉生 吕省三 雍成林",,2003,"第一期",107
    1441,"冲击式水轮机技术的最新发展",,,,,,,,,2003,"第一期",107
    1442,"低水头电站机组机型比选",,,,,,,"张延锋 田树棠",,2003,"第二期",108
    1443,"公伯峡水轮机水力性能研究",,,,,,,"王茜云 梁武科 赵希久",,2003,"第二期",108
    1444,"灯泡式发电机冷却水的探讨——与"灯泡式发电机二次循环冷却方式及其改造"一文商榷",,,,,,,"冯衍祥",,2003,"第二期",108
    1445,"水轮机报价设计系统简介",,,,,,,"熊建平",,2003,"第二期",108
    1446,"水电站调峰机组的特点",,,,,,,"阎永忠",,2003,"第二期",108
    1447,"国产抽水蓄能机组水泵——水轮机选型中若干问题探讨",,,,,,,"高道扬",,2003,"第二期",108
    1448,"多声路超声波测流系统在抽水蓄能电站中的运用",,,,,,,"夏洲 徐春荣 李刚",,2003,"第二期",108
    1449,"天堂抽水蓄能电站数字式调速器",,,,,,,"黄海清",,2003,"第二期",108
    1450,"φ1750mm蝴蝶阀调试",,,,,,,"孙定茂",,2003,"第二期",108
    1451,"蜗壳用钢板WDL160A应用特性研究",,,,,,,"李雅范 高秀玲 过洁",,2003,"第二期",108
    1452,"陈岙泵站设备出厂验收试验",,,,,,,"王日平",,2003,"第二期",108
    1453,"沉湖五·七泵站5#机组纠偏改造",,,,,,,"王国勤",,2003,"第二期",108
    1454,"提高大型水泵机械全调机构运行寿命探讨",,,,,,,"吕鹏林 朱建军",,2003,"第二期",108
    1455,"水轮机补气方法",,,,,,,"马丽玫译",,2003,"第二期",108
    1456,"转浆式水轮机无油运行",,,,,,,"杨珍珠译",,2003,"第二期",108
    1457,"混流式水轮机真机压力脉动测量",,,,,,,"阙广庆译",,2003,"第二期",108
    1458,"高比速混流式水轮机的水力稳定性问题",,,,,,,"陶星明 刘光宁",,2003,"第三期",109
    1459,"冲击式水轮机设计的探讨与发展趋势",,,,,,,"马锐 宫游 窦纯玉",,2003,"第三期",109
    1460,"高水头混流式水轮机的发展与应用",,,,,,,"郭筱蓉 蒋登云 华健",,2003,"第三期",109
    1461,"洪江水电站水轮机模型试验",,,,,,,"黄金树",,2003,"第三期",109
    1462,"沙坡头水电站水轮机模型验收试验",,,,,,,"徐宝兰 严肃",,2003,"第三期",109
    1463,"水轮发电机组振动的分析及处理",,,,,,,"者建伦 王胜",,2003,"第三期",109
    1464,"蓬辣滩电站水轮机桨叶故障分析处理",,,,,,,"范曙登",,2003,"第三期",109
    1465,"现代液压控制技术在贯流式机组液压系统中的应用",,,,,,,"俞剑锋",,2003,"第三期",109
    1466,"水轮机导轴承间隙探计",,,,,,,"孙定茂",,2003,"第三期",109
    1467,"温州新状元水厂水泵电动机出场验收试验中的几个问题",,,,,,,"王日平",,2003,"第三期",109
    1468,""沉湖五·七泵站5#机组纠偏改造"深入探讨",,,,,,,"朱建军 媵晓艳",,2003,"第三期",109
    1469,"通过三峡右岸水轮机模型的研制来加深对几个水力稳定性问题的认识",,,,,,,"覃大庆",,2003,"第四期",110
    1470,"高水头水轮机的抗泥沙磨损措施",,,,,,,"蒋登云",,2003,"第四期",110
    1471,"水轮机参数优化设计的几点看法",,,,,,,"胡安江·居努斯",,2003,"第四期",110
    1472,"关于水力机械动态试验数据处理问题的探讨",,,,,,,"周大庆 屈波",,2003,"第四期",110
    1473,"南水北调东线工程泵组选型和科研工作探讨",,,,,,,"张士杰",,2003,"第四期",110
    1474,"溧阳抽水蓄能电站单机容量与机组台数选择",,,,,,,"郑建兴",,2003,"第四期",110
    1475,"刘家峡水电厂机组改造前后稳定性的变化",,,,,,,"段生孝",,2003,"第四期",110
    1476,"回龙电站水轮机密封改造",,,,,,,"孙定茂",,2003,"第四期",110
    1477,"转轮底环抗磨研讨",,,,,,,"牛玉法 朱顺强 段惠敏",,2003,"第四期",110
    1478,"水电铸铁型供水管道改造",,,,,,,"李建华 赵春明 顾鸣",,2003,"第四期",110
    1479,"青溪水电厂技术供水系统改造",,,,,,,"贺玉松",,2003,"第四期",110
    1480,"低水头混流式水轮机的改造",,,,,,,"刘国辉译 黄梅校",,2003,"第四期",110
    1481,"25MW轴流转浆式机组的振动问题研究",,,,,,,"刘国辉译 伍志军校",,2003,"第四期",110
    1482,"安装在李川电站的新型叶轮的开发和应用",,,,,,,"蔡千华译",,2003,"第四期",110
    1483,"关于混流式水轮机水力稳定性的几点建议",,,,,,,"陶星明 刘光宁",,2004,"第一期",111
    1484,"水泵水轮机额定水头选择",,,,,,,"严丽 ",,2004,"第一期",111
    1485,"哈电三峡右岸水轮机水力模型研发取得突破",,,,,,,"王泉龙",,2004,"第一期",111
    1486,"大型高埋深水轮机补气方式研究",,,,,,,"张强 ",,2004,"第一期",111
    1487,"向家坝水电站变顶高尾水洞方案的水力计算分析",,,,,,,"张强 刘保华",,2004,"第一期",111
    1488,"芭蕉河一级水电站调节保证及水力干扰计算",,,,,,,"杨征勇",,2004,"第一期",111
    1489,"大朝山水电水轮机转轮制造和质量分析",,,,,,,"于纪幸 徐抱朴 孙殿湖 李兴捷",,2004,"第一期",111
    1490,"我国水轮机空蚀磨损破坏状况与对策",,,,,,,"段生孝",,2004,"第一期",111
    1491,"龙滩水电站转轮工地制造技术浅析",,,,,,,"王惠军",,2004,"第一期",111
    1492,"水轮机压力脉动的测试分析",,,,,,,"徐洪泉 张建光 徐国珍",,2004,"第一期",111
    1493,"我国轴流泵的发展与开发研究",,,,,,,"张光蓉 戴庆忠",,2004,"第一期",111
    1494,"水淹定子处理",,,,,,,"孙定茂",,2004,"第一期",111
    1495,"丹江口水电厂三号发电机通风,温升试验",,,,,,,"王炜 梅志桂",,2004,"第一期",111
    1496,"中低水头水轮机常见主轴密封类型",,,,,,,"程玉斌",,2004,"第一期",111
    1497,"公伯峡水轮机参数与性能的优化途径",,,,,,,"段宏江 沙莉 田树棠",,2004,"第二期",112
    1498,"三峡右岸水轮机水力性能优化设计",,,,,,,"刘胜柱 纪兴英",,2004,"第二期",112
    1499,"三板溪水轮机模型验收试验",,,,,,,"张强 于纪幸",,2004,"第二期",112
    1500,"新安江改造水轮机模型验收试验",,,,,,,"李建华 赵春明 顾鸣",,2004,"第二期",112
    1501,"大朝山转轮叶片的卡门涡共振",,,,,,,"李启章",,2004,"第二期",112
    1502,"中小型水轮机补气及装置设计",,,,,,,"贾允 周亚信",,2004,"第二期",112
    1503,"水轮发电机组振动测试中相关信号概率分析法的应用与探讨",,,,,,,"卢万里 李萍",,2004,"第二期",112
    1504,"水轮发电机组甩负荷过度过程性能指标的探讨",,,,,,,"张江滨",,2004,"第二期",112
    1505,"混流式水轮机采用进水阀参加调节的探讨",,,,,,,"阎永忠",,2004,"第二期",112
    1506,"厂房不均匀沉陷对立式水泵机组安装的影响及处理",,,,,,,"朱玉兵",,2004,"第二期",112
    1507,"对重锤式蝴蝶阀的一些思考",,,,,,,"程亚斌",,2004,"第二期",112
    1508,"浅谈灯泡贯流机组孤网运行",,,,,,,"林永弟 赵菊芬",,2004,"第二期",112
    1509,"混流式水泵水轮机尾水管肘管中流动的稳定性",,,,,,,,,2004,"第二期",112
    1510,"黄河乌金峡水电站水轮机优化选择",,,,,,,"雷亮 田树棠",,2004,"第三期",113
    1511,"引子渡水电站水轮机选择及稳定性措施",,,,,,,"李月彬 孔西冰",,2004,"第三期",113
    1512,"大七孔电站水轮发电机运行稳定性的技术措施",,,,,,,"李霞 丁继茂 王纬",,2004,"第三期",113
    1513,"双河口水电站水轮机技术参数选择",,,,,,,"陈大国",,2004,"第三期",113
    1514,"利用临界空化系数精确确定水轮机出力",,,,,,,"徐洪泉 王万鹏 张强",,2004,"第三期",113
    1515,"国产水泵-水轮机选型中的空化(气蚀)及吸出高度问题",,,,,,,"高道扬 韩佩军",,2004,"第三期",113
    1516,"长短叶片转轮混流式水轮机应用情况及特点",,,,,,,"李国梁",,2004,"第三期",113
    1517,"新疆喀什康帕二级电站增容改造",,,,,,,"王强 冯春燕 王海涛 张强",,2004,"第三期",113
    1518,"河床是水电站拦污栅堵塞调查研究",,,,,,,"方勇耕 王俊萍",,2004,"第三期",113
    1519,"抽水蓄能电站开发模式的探讨",,,,,,,"刘洪成 郑建兴",,2004,"第三期",113
    1520,"第二上野尻水电站立轴灯泡贯流式水轮发电机组",,,,,,,"高桥正宏",,2004,"第三期",113
    1521,"大型竖井贯流式水轮机选型设计",,,,,,,"史光辉",,2004,"第四期",114
    1522,"黄河寺沟峡水电站机组机型优化选择",,,,,,,"邓志勇 田树棠",,2004,"第四期",114
    1523,"尼那水电站灯泡机组优化设计与实践",,,,,,,"王少峰 肖海生 田树棠 刘慧凤",,2004,"第四期",114
    1524,"波迪科西水电工程水力机械设计特点",,,,,,,"朱雄",,2004,"第四期",114
    1525,"江苏省淮安三站的国产首台可逆型灯泡贯流式泵组",,,,,,,"杨鸿年 高道扬 赵广有",,2004,"第四期",114
    1526,"博斯腾湖东泵站进出水流道优化水力设计",,,,,,,"高钦 方向阳",,2004,"第四期",114
    1527,"株洲航电水轮机模型验收中遇到的空化和压力脉动测试问题",,,,,,,"徐洪泉 陈锐 周先亮 李建军",,2004,"第四期",114
    1528,"外砂水电站水轮机选型浅见",,,,,,,"徐军科",,2004,"第四期",114
    1529,"有日调节库容水电站的水能计算",,,,,,,"朱建和 焦小彦",,2004,"第四期",114
    1530,"萨彦-舒申斯克电站水轮机转轮叶片裂纹的修复方法",,,,,,,"(俄)谢符科夫 陈昌宏译",,2004,"第四期",114
    1531,"超声波流量计在公伯峡工程中的应用",,,,,,,"段宏法 夏洲",,2004,"第四期",114
    1532,"水电站水利机械计施设计中值得注意的若干问题",,,,,,,"李继堂",,2005,"第一期",115
    1533,"浙江龙泉广安水电站水轮机选型设计优化研究",,,,,,,"周伟彬",,2005,"第一期",115
    1534,"重庆鱼剑口水电站水轮机机型比选",,,,,,,"乌晓明",,2005,"第二期",116
    1535,"水轮机和水泵水轮机有压部件的应力研究",,,,,,,"严丽译",,2005,"第二期",116
    1536,"水轮机焊接导叶的计算",,,,,,,"陈昌宏译",,2005,"第二期",116
    1537,"博斯腾湖东泵站模型装置试验研究",,,,,,,"高钦 ",,2005,"第二期",116
    1538,"浅谈谏壁抽水站主机泵改造中的几点体会",,,,,,,"朱建军 媵晓艳 王强",,2005,"第二期",116
    1539,"浅析提高机械调节器运行寿命的可能性",,,,,,,"田磊高 陈有贵 吕鹏林",,2005,"第二期",116
    1540,"新安江水电厂水力机械改造",,,,,,,"李冬华",,2005,"第二期",116
    1541,"水轮机顶盖漏水故障的分析",,,,,,,"单以明 陈辉",,2005,"第二期",116
    1542,"甘肃水机抗空蚀磨损破坏工作的30年回顾",,,,,,,"段生孝",,2005,"第二期",116
    1543,"四川柳洪水电站蜗壳,导水机构厂内试验",,,,,,,"王日平",,2005,"第二期",116
    1544,"轴伸贯流机组系列开发",,,,,,,"范秋映 郑路福 於来历",,2005,"第二期",116
    1545,"三峡右岸电站水轮机选型设计",,,,,,,"胡江艺 严肃",,2005,"第三期",117
    1546,"黄河积石峡水电站机组机型优化选择",,,,,,,"马彩萍",,2005,"第三期",117
    1547,"国外公司水泵水轮机和进口阀门结构技术",,,,,,,"陶喜群",,2005,"第三期",117
    1548,"水泵水轮机模型验收试验",,,,,,,"房玉亭 李胜兵",,2005,"第三期",117
    1549,"尾水管高度对水轮机水力性能的影响",,,,,,,"李仲全",,2005,"第三期",117
    1550,"二面进水竖井贯流式水轮机的探索",,,,,,,"郑路福 范秋映 於来历 魏良锋",,2005,"第三期",117
    1551,"即将出版的IEC规程中的比尺效应公式",,,,,,,"(日)Hiroshi Tanaka等",,2005,"第三期",117
    1552,"就湖南明山电排站出水流道型式改造与业内同仁商榷",,,,,,,"游善江 吕省三",,2005,"第三期",117
    1553,"弹性金属塑料推力瓦破坏形式及原因分析",,,,,,,"陈正文 魏志良",,2005,"第三期",117
    1554,"WW(S)T"四无"型可编程微机调速器在水电厂运用",,,,,,,"林时武",,2005,"第三期",117
    1555,"水电站超声波测流的新技术和新动向",,,,,,,"霍殿中 徐春荣 赵学东",,2005,"第三期",117
    1556,"超声波流量测量值低水头电站的应用",,,,,,,"霍力田译",,2005,"第三期",117
    1557,"高比速混流式水轮机水力稳定问题探讨",,,,,,,"乐汉卿",,2005,"第四期",118
    1558,"水电站机组非标准同步转速的选择",,,,,,,"方向阳 樊智军 朱桦华",,2005,"第四期",118
    1559,"三峡机组充水保压蜗壳关键技术研究及应用",,,,,,,"戴会超 秦继章",,2005,"第四期",118
    1560,"水轮机筒形阀控制方案的比较",,,,,,,"权君宗 谢俊",,2005,"第四期",118
    1561,"三峡水电厂右岸机组纯水系统",,,,,,,"戴骥",,2005,"第四期",118
    1562,"机组转动惯量GD2的取值及对水电站过渡过程的影响",,,,,,,"杨建东 高志芹",,2005,"第四期",118
    1563,"响洪甸抽水蓄能机组水轮机调速器特点及现场试验",,,,,,,"周平 曹纬福 马劲松 金守迁",,2005,"第四期",118
    1564,"油压装置的电站调试,运行及故障处理",,,,,,,"孙邦彦",,2005,"第四期",118
    1565,"调速器调试小结",,,,,,,"孙定茂",,2005,"第四期",118
    1566,"南北水调东线低扬程大流量泵型选择初探",,,,,,,"高道扬",,2005,"第四期",118
    1567,"城市防洪工程橡胶坝供排水系统设计",,,,,,,"焦小彦 朱建和",,2005,"第四期",118
    1568,"我国水电建设前景光明灿烂,机电专业技术发展任重道远",,,,,,,"赵琨 戴康俊 龚建新 贾俊田 王润珍 于庆贵",,2006,"第一期",119
    1569,"国外工程机电设计应关注的问题",,,,,,,"周益 杨梅 梁国才 姜树德 苟东明",,2006,"第一期",119
    1570,"水泵水轮机选型设计及需注意的一些问题",,,,,,,"王小军 胡万飞",,2006,"第一期",119
    1571,"高水头混流式水轮机的结构及运行特性",,,,,,,"曹镇玲",,2006,"第一期",119
    1572,"大型灯泡贯流式机组设计中应注意的问题",,,,,,,"张强",,2006,"第一期",119
    1573,"蓄能电站吸出高度选择初探",,,,,,,"周跃武",,2006,"第一期",119
    1574,"新型流量开关在电站的应用",,,,,,,"陈炎光",,2006,"第一期",119
    1575,"论"加权因子"的权重分布对转轮水力开发的导向作用",,,,,,,"宋立人 徐军",,2006,"第二期",120
    1576,"超低水头水轮发电机组优化选择",,,,,,,"张军智 段宏江 田树棠",,2006,"第二期",120
    1577,"水轮发电机组振动测试和分析",,,,,,,"陈小沁 张利民 张健",,2006,"第二期",120
    1578,"水泵-水轮机的全特性与不稳定性初步探讨",,,,,,,"高道扬 董海涛",,2006,"第二期",120
    1579,"水轮机转轮叶片模压成型技术",,,,,,,"王地召 王贞凯",,2006,"第二期",120
    1580,"水轮机摩擦传扭设计与增摩材料喷涂技术",,,,,,,"郭靖 李华彬",,2006,"第二期",120
    1581,"大古力电厂机组的运行和维护",,,,,,,"张利民编译",,2006,"第二期",120
    1582,"从引水道布置谈大通水电站调问题的处理",,,,,,,"蔡禄清",,2006,"第二期",120
    1583,"吉林台一级水电站消防方案选择",,,,,,,"高钦",,2006,"第二期",120
    1584,"恰甫其海水电站伸缩节选型研究",,,,,,,"李现臣",,2006,"第二期",120
    1585,"赴日立公司技术交流与考察",,,,,,,"田树棠",,2006,"第三期",121
    1586,"由表面粗糙引起的超声波厚度测量误差的修正方法",,,,,,,"成濑健 岛田道南 吉井德治 李莉萍译",,2006,"第三期",121
    1587,"小型轴流风扇含有翼尖渗漏的涡流场",,,,,,,"塩见宪正等 李丽萍译",,2006,"第三期",121
    1588,"水轮机测试技术",,,,,,,"岩野 龙一郎 三浦诚二 李莉萍译",,2006,"第三期",121
    1589,"越南广治水电站厂内排水系统设计特点",,,,,,,"刘艳红",,2006,"第三期",121
    1590,"当代中国水电设备制造技术现状及发展展望",,,,,,,"戴庆忠",,2006,"第四期",122
    1591,"实现龙滩水电站水轮发电机组高质量的对策和措施",,,,,,,"孙鸿秉 初日亭",,2006,"第四期",122
    1592,"混流式水轮机长短叶片转轮与19上长叶片新转轮的比较选择",,,,,,,"李国梁",,2006,"第四期",122
    1593,"探讨提高水轮机稳定性的对策",,,,,,,"孙鸿秉 初日亭",,2006,"第四期",122
    1594,"龙滩水轮发电机招标回顾",,,,,,,"孙鸿秉",,2006,"第四期",122
    1595,"山美水库电站水轮发电机组技术改造",,,,,,,"陈绍钢 廖承友",,2006,"第四期",122
    1596,"水电站黑启动技术的探讨",,,,,,,"崔慧丽 李正安",,2006,"第四期",122
    1597,"风力发电与风轮机优化设计",,,,,,,"刘万琨",,2006,"第四期",122
    1598,"浅析水电站建筑节能及合理划分空调分区对系统运行能耗的影响",,,,,,,"李杰",,2006,"第四期",122
    1599,"变速水泵水轮机优势分析",,,,,,,"Werner von Nessen-Lapp等",,2007,"第一期",123
    1600,"混流式水轮机模型参数选择",,,,,,,"喻忻",,2007,"第一期",123
    1601,"水轮机安装高程计算的新方法",,,,,,,"杨军",,2007,"第一期",123
    1602,"水电机组转子的动态特性",,,,,,,"Age Hofstad",,2007,"第一期",123
    1603,"论水斗式水轮机转轮水斗的破坏",,,,,,,"周文桐 周晓泉",,2007,"第一期",123
    1604,"数字阀PPC可编程智能调速器在三块石水电站技术改造中的应用",,,,,,,"姜勇",,2007,"第一期",123
    1605,"长梁山水电站液气射流泵的设计与试验",,,,,,,"焦小彦 朱建和",,2007,"第一期",123
    1606,"动力式高速进排气阀",,,,,,,"唐剑锋 谢买祥 殷建国",,2007,"第一期",123
    1607,"西大桥水电厂水轮机增容改造",,,,,,,"张鹰",,2007,"第一期",123
    1608,"并网型风力发电系统的现状与发展",,,,,,,"耿华 杨耕 崔杨 梁之龙",,2007,"第一期",123
    1609,"水机前期工作优化途径",,,,,,,"田树棠",,2007,"第二期",124
    1610,"街面水电站水轮机额定水头选择",,,,,,,"陈绍钢 ",,2007,"第二期",124
    1611,"喜河水电站水轮机额定转速选择",,,,,,,"刘桂芹",,2007,"第二期",124
    1612,"防止叶片产生裂纹的转轮的开发与制造",,,,,,,"陶喜群 许健",,2007,"第二期",124
    1613,"黑糜峰抽水蓄能电站首台机组首次启动方式分析",,,,,,,"喻忻 郑建兴",,2007,"第二期",124
    1614,"黄鹿坝水电厂一号机振动故障试验分析及处理",,,,,,,"闵占奎 段生孝 赵万成",,2007,"第二期",124
    1615,"红山嘴电厂水轮机综合抗磨蚀工作运用",,,,,,,"谷正刚 王勇",,2007,"第二期",124
    1616,"整装灯泡机组的开发与应用",,,,,,,"宋桂玲 张清顿 房玉敏",,2007,"第二期",124
    1617,"泵出口阀的结构与应用",,,,,,,"靳卫华 李志鹏",,2007,"第二期",124
    1618,"水电站机组冷却供水优化设计-设置清洁循环冷却水池",,,,,,,"阎永忠",,2007,"第二期",124
    1619,"带行星齿轮减速潜水泵的优势与前景浅析",,,,,,,"曹闻一 曹炜",,2007,"第二期",124
    1620,"水轮机泥沙磨损的综合治理",,,,,,,"刘光宁 陶星明 刘诗琪",,2007,"第三期",125
    1621,"低水头混流式水轮机叶道涡引起的噪声及其消除",,,,,,,"石清华 许巍巍 龚莉",,2007,"第三期",125
    1622,"波夏河水电站水力过渡过程研究及思考",,,,,,,"朱智斌 王呆 孟学品",,2007,"第三期",125
    1623,"单级混流可逆式机组额定水头和水头变幅的选择",,,,,,,"苟东明",,2007,"第三期",125
    1624,"河南回龙抽水蓄能电站一号机振动分析",,,,,,,"闵占奎 刘秀良 罗剑斌",,2007,"第三期",125
    1625,"琊山抽水蓄能电站首台机组泵工况并网调试关键技术",,,,,,,"周振忠 万凤霞",,2007,"第三期",125
    1626,"水机辅助设备设计一些问题的探讨",,,,,,,"周益 ",,2007,"第三期",125
    1627,"挂治电站水轮发电机设计",,,,,,,"刘俊杰",,2007,"第三期",125
    1628,"18声路超声波流量技术在三峡右岸电厂机组的运用研究",,,,,,,"夏洲 刘占果 郑慧娟 李友平",,2007,"第三期",125
    1629,"工程项目管理的几点体会",,,,,,,"朱丽辉",,2007,"第三期",125
    1630,"关于水泵水轮机最高扬程驼峰区安全裕度选取的建议",,,,,,,"覃大清 张乐福",,2007,"第四期",126
    1631,"就水斗式水轮机论相似与空蚀",,,,,,,"周晓泉 周文桐",,2007,"第四期",126
    1632,"小湾水电站水轮机招标方式及模型试验研究",,,,,,,"朱惠君 王晓龙 曾镇铃",,2007,"第四期",126
    1633,"水轮机叶片裂纹原因分析",,,,,,,"陈昭运 滕奎 李建明",,2007,"第四期",126
    1634,"混流式转轮固有频率分析",,,,,,,"吕桂萍 唐任远",,2007,"第四期",126
    1635,"叶道涡产生机理及对水轮机稳定性的影响",,,,,,,"陈金霞 刘胜柱 吕桂萍 李国伟",,2007,"第四期",126
    1636,"旬阳水电站机组机型选择",,,,,,,"刘桂芹",,2007,"第四期",126
    1637,"长距离引水径流式水电站装机容量及水轮机额定水头的确定",,,,,,,"李朝晖",,2007,"第四期",126
    1638,"小狐山水电站三号机振动故障诊断试验分析",,,,,,,"闵占奎 刘秀良 ",,2007,"第四期",126
    1639,"柘林水电厂B厂机组尾水压力脉动分析",,,,,,,"孙建平 肖赛赛 徐擎天",,2007,"第四期",126
    1640,"做好设备监造工作的体会",,,,,,,"王日平 李伏香",,2007,"第四期",126
    1641,"运用筒形阀优化引水式电站设计",,,,,,,"田树棠 段宏江 谢永兰 刘健伟",,2008,"第一期",127
    1642,"甲江水电站水轮机参数及机型初步选择",,,,,,,"乌晓明",,2008,"第一期",127
    1643,"桐柏抽水蓄能电站DIA TECH系统结构浅析",,,,,,,"崔运进 徐涛",,2008,"第一期",127
    1644,"红山嘴水电厂非金属材料抗磨经验谈",,,,,,,"欧阳智",,2008,"第一期",127
    1645,"水轮发电机空气间隙监测技术的应用",,,,,,,"张瑞杰 孙建民",,2008,"第一期",127
    1646,"关于西电厂轴流转轮室椭圆磨损的探析",,,,,,,"张鹰",,2008,"第一期",127
    1647,"利用疲劳分析概念提高水轮机运行可靠性",,,,,,,"田树棠",,2008,"第一期",127
    1648,"空化系数对水轮机水力性能的影响",,,,,,,"徐洪泉 王万鹏 ",,2008,"第二期",128
    1649,"关于溪洛渡,向家坝电站机组抗震参数的选取",,,,,,,"王毅华",,2008,"第二期",128
    1650,"比转速选择对水电站稳定运行的影响",,,,,,,"徐洪泉 王万鹏 ",,2008,"第二期",128
    1651,"漫湾水电站二期工程水力机械设计",,,,,,,"张辉 贺朋朋",,2008,"第二期",128
    1652,"龙滩水电站700MW巨型水轮机设计",,,,,,,"李新威 林延忠",,2008,"第二期",128
    1653,"土卡河水电站水轮机结构设计",,,,,,,"林洪德 张利民 李晓光",,2008,"第二期",128
    1654,"新型潮汐发电六工况水轮机的研制",,,,,,,"陈康明 陈金林",,2008,"第二期",128
    1655,"水轮机卧式球面推力径向轴承支重结构改进创新",,,,,,,"郭旭芳 於来历 范秋映",,2008,"第二期",128
    1656,"波夏河水电站水力过渡过程研究及思考",,,,,,,"朱智斌 王呆 孟学品",,2008,"第二期",128
    1657,"瓦屋山水电站φ2.5m球形阀的设计",,,,,,,"林洪德 张利民 杜省江",,2008,"第二期",128
    1658,"环保型微机调速器",,,,,,,"杨翠花",,2008,"第二期",128
    1659,"基于LS-PLC的微机式调速器",,,,,,,"陈宏宇 丛燕 黄炎彬",,2008,"第二期",128
    1660,"水斗式水轮机辩疑",,,,,,,"周晓泉 周文桐",,2008,"第三期",129
    1661,"叶栅抽稠密度对贯流式水轮机效率影响的研究",,,,,,,"王玲花 韩立争 王继东",,2008,"第三期",129
    1662,"轴流转浆式水轮机空化声信号特征研究",,,,,,,"张俊华 张伟 蒲中奇 林良有",,2008,"第三期",129
    1663,"长距离引水径流式水电站装机容量及水轮机额定水头的确定",,,,,,,"李朝晖",,2008,"第三期",129
    1664,"三峡水电厂左岸ALSTOM机组尾水管压力脉动分析",,,,,,,"孙建平 付建平 薛福文 郑莉媛",,2008,"第三期",129
    1665,"大型潜水贯流泵的应用研究",,,,,,,"周锁生 汤泳 周伟",,2008,"第三期",129
    1666,"SAPS泵站水力机械设计特点",,,,,,,"杨铁荣",,2008,"第三期",129
    1667,"韩国青松抽水蓄能电站球阀结构特点",,,,,,,"朴春光",,2008,"第三期",129
    1668,"不锈钢复合钢板应用于新型潮汐机组中的探讨",,,,,,,"王玉娟 陈立卫",,2008,"第三期",129
    1669,"关于三峡水电站水轮发电机组推力下导轴承轴领热膨胀和公差配合探讨",,,,,,,"孙发成",,2008,"第三期",129
    1670,"木京电站导水机构弹簧安全连杆设计",,,,,,,"王长志",,2008,"第三期",129
    1671,"都江堰双柏电站机组增容防蚀的可行性研究",,,,,,,"宋文武 杜西陵 罗联成 杜同 赖国元",,2008,"第三期",129
    1672,"水斗式水轮机模型试验与相似理论",,,,,,,"周晓泉 周文桐",,2008,"第四期",130
    1673,"苏只水电站水轮机安装高程的确定",,,,,,,"张延锋 马国强",,2008,"第四期",130
    1674,"四川木座水电站机组旋转方向初探",,,,,,,"郑昌银 李涛",,2008,"第四期",130
    1675,"皂市水利枢纽水轮发电机组选型的优化设计",,,,,,,"金德山 杨晓琳 陈冬波",,2008,"第四期",130
    1676,"黄河拉西瓦电站主厂房桥式起重机选择及有关技术问题研究",,,,,,,"杨新光 田树棠 刘慧凤",,2008,"第四期",130
    1677,"竖轴式水轮发电机内循环推力轴承热交换油路设计问题探讨",,,,,,,"孙发成 刘嘉华",,2008,"第四期",130
    1678,"ALSTOM机组活动导叶抗磨块及拐臂磨损处理",,,,,,,"刘连伟 冉毅川",,2008,"第四期",130
    1679,"紫坪铺电厂机组自流减压技术供水系统减压阀的改造",,,,,,,"李兴全 虎勇",,2008,"第四期",130
    1680,"三板溪水电厂油压装置自动补气功能改进",,,,,,,"王楠 张雷",,2008,"第四期",130
    1681,"黑糜峰抽水蓄能电站2#机座环蜗壳同步安装技术",,,,,,,"牛国智",,2008,"第四期",130
    1682,"不锈钢复合钢板应用于新型潮汐机组中的探讨",,,,,,,"王玉娟 陈立卫",,2008,"第四期",130
    1683,"对我国水电发展的思考",,,,,,,"晏志勇",,2009,"第一期",131
    1684,"1000MW级水轮机运行稳定性关键技术研究",,,,,,,"唐澍 潘罗平",,2009,"第一期",131
    1685,"拉西瓦水电站低水头提前发电技术研究",,,,,,,"杨新光 田树棠 刘慧凤",,2009,"第一期",131
    1686,"1000MW水轮发电机组设计制造关键技术研究",,,,,,,"哈尔滨大电机研究所",,2009,"第一期",131
    1687,"三叶片灯泡机组的参数选择",,,,,,,"马彩萍 田树棠",,2009,"第一期",131
    1688,"高比转速混流式水轮机转轮自激振动特性分析",,,,,,,"彭珍珍 赵恒文 李鹏",,2009,"第一期",131
    1689,"巨型事故配压阀研究",,,,,,,"杨翠花 吕平 朴秀日等",,2009,"第一期",131
    1690,"四川木座水电站机组技术供水设计",,,,,,,"郑昌银 李涛",,2009,"第一期",131
    1691,"水轮发电机定子接地故障和扫堂的分析及处理探讨",,,,,,,"朱春英 杨言启",,2009,"第一期",131
    1692,"浅析真纳水电站竖井基础设计及竖井基础防渗措施",,,,,,,"王龙 王少峰 刘旭林",,2009,"第一期",131
    1693,"浅谈水轮机运行加权因子的权重分布",,,,,,,"谢永兰 田树棠",,2009,"第二期",132
    1694,"龙滩模型水轮机试验结果分析和原型转轮的水力修型",,,,,,,"于纪幸 任绍成 孙鸿秉 杨振先 王怀茂",,2009,"第二期",132
    1695,"通过机组运行和试验对龙滩水轮机转轮的初步评价",,,,,,,"杨振先",,2009,"第二期",132
    1696,"水力机械防护涂层的应用和研究进展",,,,,,,"刘娟",,2009,"第二期",132
    1697,"小型水电站推广高性能水轮机转轮的探讨",,,,,,,"乌晓明",,2009,"第二期",132
    1698,"浅析中小型混流式水轮机水平进水蜗壳的设计",,,,,,,"孙华 顾旭良",,2009,"第二期",132
    1699,"前苏联贯流式水轮发电机组",,,,,,,"张利民 林洪德",,2009,"第二期",132
    1700,"黑糜峰蓄能机组φ2.8m球形阀的设计",,,,,,,"林洪德 张利民 杜江",,2009,"第二期",132
    1701,"水轮机调速器齿轮盘测频信号新论",,,,,,,"赵亚鹏",,2009,"第二期",132
    1702,"CVT-150数字式水轮机调速器在安康水电站0号机组的应用",,,,,,,"何家宁",,2009,"第二期",132
    1703,"水轮机的特征水头问题",,,,,,,"刘光宁 陶星明 ",,2009,"第三期",133
    1704,"溪洛渡水电站水轮机导叶区流动分析及泥沙磨损预估",,,,,,,"高忠信 唐澍",,2009,"第三期",133
    1705,"银盘水电站大型轴流机组",,,,,,,"季定泉 孟利平 杨小松",,2009,"第三期",133
    1706,"尾水管扩散段长度及出口宽度对其回能系数的影响",,,,,,,"陈柳 于纪幸 姜明利 任绍成",,2009,"第三期",133
    1707,"清水塘水电站水轮机过渡过程试验研究",,,,,,,"阎宗国 彭光杰 王正伟",,2009,"第三期",133
    1708,"巨型水电机组多声路超声波流量计实流校准数据分析方法探讨",,,,,,,"李友平 李文学 刘洪成",,2009,"第三期",133
    1709,"拉西瓦水电站水轮机转轮现场制造及质量控制",,,,,,,"张东胜 宿国祯 宿亮登",,2009,"第三期",133
    1710,"甘肃电投朱岔峡水电站1#机振动分析处理",,,,,,,"闵占奎 刘秀良 容春良 金小庸 宋波",,2009,"第三期",133
    1711,"新疆吐木秀克水电站水轮机泥沙磨损研究",,,,,,,"上官永红 杨子刚 陈立春",,2009,"第三期",133
    1712,"混流式机组转轮上部止漏环严重脱落的原因分析及处理",,,,,,,"叶福新 郑建锋",,2009,"第三期",133
    1713,"潜水贯流泵机组检修工艺探讨",,,,,,,"李银海 朱建军",,2009,"第三期",133
    1714,"考虑稳定性和空蚀磨损性能的水电站优化调度系统",,,,,,,"徐洪泉 王万鹏 ",,2009,"第四期",134
    1715,"抽水蓄能机组调相压水过程的控制",,,,,,,"郑小刚 谷振富",,2009,"第四期",134
    1716,"龙滩水电站700MW水轮机运行性能综述",,,,,,,"王鹏宇",,2009,"第四期",134
    1717,"河口电站灯泡贯流水轮机结构设计",,,,,,,"魏秀峰 张继成 周学均",,2009,"第四期",134
    1718,"大型水轮发电机组房飞逸的研究",,,,,,,"阎永忠",,2009,"第四期",134
    1719,"灯泡式发电机轴电流事故中的教训",,,,,,,"冯衍祥",,2009,"第四期",134
    1720,"桐柏抽水蓄能机组水泵水轮机主轴工作密封简介",,,,,,,"孙育哲 黄建德",,2009,"第四期",134
    1721,"皮带传动水轮机的轴承架活动脚结构",,,,,,,"郭旭芳 顾旭良",,2009,"第四期",134
    1722,"水电站循环冷却供水方式的探讨与应用",,,,,,,"赵阳 马彩萍 邓志勇",,2009,"第四期",134
    1723,"桐柏抽水蓄能电厂TC1703XL微机调速器简介",,,,,,,"孙育哲",,2009,"第四期",134
    1724,"水轮机调速器齿盘测频信号新论",,,,,,,"赵亚鹏",,2009,"第四期",134
    1725,"三堡排涝工程 水泵选型与结构设计",,,,,,,"楚利 苏占 王日平",,2009,"第四期",134
    1726,"混流式水轮机空化涡现象与锦屏一级流态观察",,,,,,,"邓祥平 严肃 胡江艺",,2010,"第一期",135
    1727,"小湾水电站φ8.69m筒形阀结构设计",,,,,,,"林洪德 刘礼政 杜江",,2010,"第一期",135
    1728,"外雄电站水轮机结构设计",,,,,,,"楼晓雷 詹积粮",,2010,"第一期",135
    1729,"白莲河抽水蓄能电站首台机首次起动方式探讨",,,,,,,"伍志军 杨洪涛",,2010,"第一期",135
    1730,"四喷嘴水斗式水轮机研发与应用",,,,,,,"王国鹏",,2010,"第一期",135
    1731,"冲击式水轮机配水环管分析",,,,,,,"张利民 编译",,2010,"第一期",135
    1732,"登棚一级水电站水斗式水轮机选型设计",,,,,,,"王国鹏",,2010,"第一期",135
    1733,"水电站排水系统泵型比较",,,,,,,"周雄",,2010,"第一期",135
    1734,"水电站变压器水喷雾包络线消防系统应用",,,,,,,"刘立峰 张军智",,2010,"第一期",135
    1735,"贯流式机组轴承润滑油量监测方法探讨",,,,,,,"白素杰 陈燕新 刘万景",,2010,"第一期",135
    1736,"浅谈灯泡贯流式机组可靠性运行",,,,,,,"冯衍祥",,2010,"第一期",135
    1737,"江夏潮汐试验电站6#电机的通风冷却",,,,,,,"陈立卫",,2010,"第一期",135
    1738,"水轮机桨叶出厂验收",,,,,,,"方源 李亚萍",,2010,"第一期",135
    "Sheet2"
    "Sheet3"
  • 下载地址 (推荐使用迅雷下载地址,速度快,支持断点续传)
  • 免费下载 XLS格式下载
  • 您可能感兴趣的
  • 混合式空气雾化喷嘴  式水管喷嘴  立式冲击式破碎机  压力式喷嘴  脱硫除尘螺旋喷嘴  喷嘴流量计算公式  冲击式水轮机  狭缝喷嘴射流平均传热  打印机喷嘴怎么清洗